Glass Fitting ST-L210A
- Loading Port:
- China Main Port
- Payment Terms:
- TT or LC
- Min Order Qty:
- 100 Sets set
- Supply Capability:
- 30000 Sets Per Month set/month
OKorder Service Pledge
OKorder Financial Service
You Might Also Like
Type: Other Curtain Wall Accessories
Place of Origin: China
Model Number: ST-L210A
We are the professional manufacturer of producing point-fixed Glass Wall Fittings (Flat Cap Routel, Countersunk Routel, Splice Routel, Connector, Spider for the end Tension Rod, Spider for the Cable Net, Fin Spider, Glass Clamp, The Accessories of the Opening Window for the Point-fixed Glass Curtain Wall, The Strut Bar for the TensionCable, The Strut Bar for the Tension Rod, Tension Rod, Tension Cable etc.).
1 |
Product Name |
Stainless steel point-fixed Glass Wall Fittings |
2 |
Brand |
FITSHY |
3 |
Model |
ST-L210A |
4 |
Material |
201, 302, 304, 304L, 316, 316L, according to customers' requirements |
5 |
Standard |
GB, JIS, AISI, BS, DIN |
6 |
Finishing |
Mirror polished, Matte finish, Fluorocarbon coating(all kinds of colors) |
7 |
Usage |
Glass curtain wall and glass canopy |
8 |
Package |
Bubble bag + Inner box + Carton |
9 |
MOQ |
100 SETS |
10 |
Delivery time |
In stock |
11 |
Price |
0-10000 USD/set |
12 |
Service |
1.Product design drawings (CAD) |
2.Professional engineer advices | ||
3.Installation guiding | ||
4.Product Warranty is offered | ||
5.OEM, ODM , Customer design | ||
13 |
Payment |
L/C, T/T |
14 |
Ability |
30,000 sets |
The recommended value for the loading of single arm of spider
NO. |
Spider Series Code |
Material:304 | |
Permissible axial load (N) (negative pressure) |
Radial Allowable load (N) (dead weight) | ||
1 |
ST-150 Series “X” Shape |
1500 |
1000 |
2 |
ST-160 Series “X” Shape |
2000 |
1200 |
3 |
ST-200 Series “X” Shape |
3000 |
1500 |
4 |
ST-210 Series “X” Shape |
3000 |
2000 |
5 |
ST-220 Series “X” Shape |
3000 |
2000 |
6 |
ST-250 Series “X” Shape |
3500 |
2000 |
7 |
ST-300 Series “X” Shape |
4000 |
2000 |
- Q: Residential stone curtain wall design height of not more than 50m to demonstrate it
- In accordance with the provisions of Article 6, paragraph 1, of Annex II of the "more dangerous part of the project with a greater risk than that of the" more dangerous part of the project safety management approach ", only 50 meters and above Expert argument.
- Q: Curtain wall design documents review how qualified newspaper supervision
- You should say is the curtain wall of the drawings review certificate. Do not need any format, do not have a separate inspection, copy a copy of the supervision to the OK. The The And the original should be given to the Party
- Q: What is the construction process of the point glass curtain wall?
- The glass curtain wall is made of skeleton, glass and accessories. ??????? 1, the skeleton is composed of longitudinal columns and crossers, the main role of supporting glass and fixed glass; ??????? 2, the glass is the curtain wall fabric, is the building envelope components, but also architectural decoration, but also the role of glass windows. ??????? 3, the annex is the bolt, aluminum pull nails, nails, sealing materials and connectors. ?????? Glass curtain wall of the process, is the first line, measured the location; and then install the skeleton; the final installation of glass
- Q: Building energy efficiency acceptance of what documents
- Building energy efficiency to complete the record form 2 copies of the design review of a copy of the record, a total of a total description of building energy, a report on the external wall, a three-window test, the system of a report on energy-saving test.
- Q: What is the classification of building materials?
- Main points: foundation and foundation, the main structure, architectural decoration, construction roof, hydropower, fire, elevators, etc.
- Q: Curtain wall energy-saving project acceptance of the general project which
- Curtain wall energy conservation project quality acceptance includes the following: 1) hidden acceptance requirements. 2) curtain wall materials, accessories, accessories, components of the quality, including insulation materials, glass, shade components, unit curtain wall panels, seals, insulation profiles. 3) materials, accessories, accessories, components witnessed sampling, re-inspection requirements. 4) curtain wall air tightness requirements, laboratory inspection requirements.
- Q: What are the contents of the curtain wall energy conservation project quality acceptance?
- Curtain wall energy-saving project quality acceptance includes the following: 1) hidden acceptance requirements. 2) curtain wall materials, accessories, accessories, components of the quality, including insulation materials, glass, shade components, unit curtain wall panels, seals, insulation profiles. 3) materials, accessories, accessories, components witnessed sampling, re-inspection requirements. 4) curtain wall air tightness requirements, laboratory inspection requirements. 5) curtain wall thermal construction requirements, including insulation material installation, steam layer, curtain wall and wall joints, structural joints, structural joints, hot bridge parts, heat sink joints, unit curtain wall between the joints, Water drainage structure and so on. 6) construction and installation requirements, including insulation material fixed, partition thermal bridge, steam layer, ventilation equipment, glass installation, shade installation, condensate drainage system installation.
- Q: How many calculations for a square meter of material?
- Curtain wall material calculation points: 1. Panel: panel ratio of expansion area * utilization (general 1.03) 2. keel: linear density * per square meter length * utilization (generally 1.05 ~ 1.15, according to material specifications) 3. Attachment: use per square meter (weight or volume number) * Utilization rate (general 1.03) 4. Low-value consumables: 15 ~ 25 (yuan / m2, according to the type of curtain wall to consider) 5. Labor costs: market decisions
- Q: Whether the civil tender contains the curtain wall and does not contain the curtain wall, behind the owner and the general contract of the contract agreement What is the difference
- If the total tender documents contain curtain wall, indicating that the total subcontract management, behind the curtain wall unit calibration, signed the total package, the owner and the curtain wall units of the tripartite agreement, take the total package of the notice and the three parties can be directly filed for the record.
- Q: Fire aluminum glass is what glass where to sell
- This involves more, you can special check, of course, you need to be specific communication
1. Manufacturer Overview
Location | Shanghai,China (Mainland) |
Year Established | 2012 |
Annual Output Value | US$1 Million - US$2.5 Million |
Main Markets | Southeast Asia; Africa; Mid East; Eastern Asia; South Asia; Domestic Market |
Company Certifications | HACCP;ISO 9001:2000;ISO 9001:2008 |
2. Manufacturer Certificates
a) Certification Name | |
Range | |
Reference | |
Validity Period |
3. Manufacturer Capability
a) Trade Capacity | |
Nearest Port | |
Export Percentage | 31% - 40% |
No.of Employees in Trade Department | 1-2 People |
Language Spoken: | |
b) Factory Information | |
Factory Size: | 3,000-5,000 square meters |
No. of Production Lines | 5 |
Contract Manufacturing | OEM Service Offered |
Product Price Range | Average |
Send your message to us
Glass Fitting ST-L210A
- Loading Port:
- China Main Port
- Payment Terms:
- TT or LC
- Min Order Qty:
- 100 Sets set
- Supply Capability:
- 30000 Sets Per Month set/month
OKorder Service Pledge
OKorder Financial Service
Similar products
Hot products
Hot Searches
Related keywords