Stainless Steel Tube Stainless Steel Pipe
- Loading Port:
- China Main Port
- Payment Terms:
- TT or LC
- Min Order Qty:
- 1 Ton m.t.
- Supply Capability:
- 5000 Tons Per Month m.t./month
OKorder Service Pledge
OKorder Financial Service
You Might Also Like
variety sizes
competitive price
high production ability
high quality
1 |
Product Name |
Stainless Steel Tube | ||||
|
Items |
Square pipes, round tubes, oval pipes, special shaped pipes, empaistic pipes, fittings | ||||
2 |
Brand |
FITSHY | ||||
3 |
Material Grade |
201: Ni 0.8%~1% | ||||
202: Ni 3.5%~4.5% | ||||||
304: Ni 8%, Cr 18% | ||||||
316: Ni 10%, Cr 18% | ||||||
316L: Ni10%~14% | ||||||
430: Cr16%~18% | ||||||
4 |
Outer Diameter |
6mm--169mm | ||||
5 |
Thickness |
0.3mm - 3.0mm | ||||
6 |
Length |
6m or as customers' request | ||||
7 |
Tolerance |
a) Outer Diameter: +/- 0.2mm | ||||
b) Thickness: +/- 0.02mm | ||||||
c) Length: +/- 5mm | ||||||
8 |
Standard |
ASTM A554, A249, A269 and A270 | ||||
9 |
Surface |
180G, 320G, 400G Satin / Hairline 400G, 500G, 600G or 800G Mirror finish | ||||
10 |
Application |
Sanitary, food industry, Decoration, construction, upholstery, industry instrument | ||||
11 |
Test |
Squash test, extended test, water pressure test, crystal rot test, heat treatment, NDT | ||||
12 |
Delivery time |
15-30 days after receiving the full payment | ||||
13 |
Mechanical Property |
Material Item |
201 |
202 |
304 |
316 |
Tensile Strength |
≥535 |
≥520 |
≥520 |
≥520 | ||
Yield Strength |
≥245 |
≥205 |
≥205 |
≥205 | ||
Extension |
≥30% |
≥30% |
≥35% |
≥35% | ||
Hardness (HV) |
<253 |
<253 |
<200 |
<200 | ||
14 |
Payment |
Payment by T/T, 30% as advance payment and 70% balance pay before shipping. | ||||
15 |
Valid time |
Valid time is 3 days for price usually. | ||||
16 |
Delivery time |
A.7 days if this goods is stock goods.
B.30 days if this goods will be produced after order | ||||
17 |
Price |
0-10000 USD/Ton | ||||
18 |
Service |
1.Professional engineer advices | ||||
2.Product Warranty is offered | ||||||
3.OEM, ODM , Customer design | ||||||
19 |
Ability |
5000Ton/month |
- Q:How many calculations for a square meter of material?
- Upstairs is also quite detailed, when we offer the general is for different types of curtain wall (different panels, keel in different forms to be separated), take a standard position of the surface, calculate the amount of various materials inside * Loss coefficient, and then divided by the area of this face, came out no square meters of the material.
- Q:Fire aluminum glass is what glass where to sell
- Fireproof glass in accordance with the requirements of the building, such as fire partition isolation, or fire partition interval attachment (closer, etc.)
- Q:Whether the civil tender contains the curtain wall and does not contain the curtain wall, behind the owner and the general contract of the contract agreement What is the difference
- If the total tender documents contain curtain wall, indicating that the total subcontract management, behind the curtain wall unit calibration, signed the total package, the owner and the curtain wall units of the tripartite agreement, take the total package of the notice and the three parties can be directly filed for the record.
- Q:Curtain wall design documents review how qualified newspaper supervision
- You should say is the curtain wall of the drawings review certificate. Do not need any format, do not have a separate inspection, copy a copy of the supervision to the OK. The The And the original should be given to the Party
- Q:Building energy efficiency acceptance of what documents
- Technical documents 1.1 through the review of the agency to review the energy-saving design and related technical documents (such as energy-saving design, energy-saving design calculations, etc.); 1.2 exterior wall, roof and hot bridge parts of the insulation construction practices or construction program design and construction plans; 2 Building and insulation materials for the manufacture of specimens 2.1 wall samples: If the ordinary clay hollow brick wall should be asked about 60 ordinary clay hollow brick, such as small hollow block (190 × 190 × 390) wall should obtain 14 blocks and seven small pieces of small hollow block ; Roof test specimen: 0.20 cubic meters of concrete material should be obtained; 2.2 sand: about 200 kg; 2.3, cementing material (cement 30 kg, lime cream 10 kg, etc.); 2.4 insulation materials and installation of insulation materials annex (calculated by 1.5 square meters); 2.5 plaster material and finishes (in 1.5 square meters).
- Q:What are the curtain wall materials to do? The beginning of the time
- Other quality assurance information.
- Q:Curtain wall energy-saving project acceptance of the general project which
- Curtain wall thermal construction requirements, including insulation material installation, steam layer, curtain wall and wall joints, structural joints, structural joints, hot bridge parts, heat sink joints, unit curtain wall plate joints, condensate set Row structure and so on.
- Q:Bidding documents are glass curtain wall, the party has to check the aluminum alloy window, how to do?
- Should be agreed by the contract, if the contract is not agreed, that is, according to the actual settlement of the two sides resolved.
- Q:What is the construction process of the point glass curtain wall?
- The glass curtain wall is made of skeleton, glass and accessories. ??????? 1, the skeleton is composed of longitudinal columns and crossers, the main role of supporting glass and fixed glass; ??????? 2, the glass is the curtain wall fabric, is the building envelope components, but also architectural decoration, but also the role of glass windows. ??????? 3, the annex is the bolt, aluminum pull nails, nails, sealing materials and connectors. ?????? Glass curtain wall of the process, is the first line, measured the location; and then install the skeleton; the final installation of glass
- Q:What are the contents of the curtain wall energy conservation project quality acceptance?
- The curtain wall is the external wall of the building, not load, like the curtain hanging up, it is also known as the "curtain wall", is a modern large and high-rise buildings with decorative effect of light wall. By the panel and the supporting structure of the system can be relative to the main structure of a certain displacement or have their own ability to deformation, do not assume the role of the main structure of the building outside the envelope or decorative structure. Curtain wall energy-saving projects used in the installation of insulation materials should be taken to protect moisture, water and other protective measures.
1. Manufacturer Overview |
|
---|---|
Location | Shanghai,China (Mainland) |
Year Established | 2012 |
Annual Output Value | US$1 Million - US$2.5 Million |
Main Markets | Southeast Asia; Africa; Mid East; Eastern Asia; South Asia; Domestic Market |
Company Certifications | HACCP;ISO 9001:2000;ISO 9001:2008 |
2. Manufacturer Certificates |
|
---|---|
a) Certification Name | |
Range | |
Reference | |
Validity Period |
3. Manufacturer Capability |
|
---|---|
a)Trade Capacity | |
Nearest Port | |
Export Percentage | 31% - 40% |
No.of Employees in Trade Department | 1-2 People |
Language Spoken: | |
b)Factory Information | |
Factory Size: | 3,000-5,000 square meters |
No. of Production Lines | 5 |
Contract Manufacturing | OEM Service Offered |
Product Price Range | Average |
Send your message to us
Stainless Steel Tube Stainless Steel Pipe
- Loading Port:
- China Main Port
- Payment Terms:
- TT or LC
- Min Order Qty:
- 1 Ton m.t.
- Supply Capability:
- 5000 Tons Per Month m.t./month
OKorder Service Pledge
OKorder Financial Service
Similar products
New products
Hot products
Hot Searches
Related keywords