• CMAX SWDL800 Augered Pile Rig for Sale on Okorder.com System 1
  • CMAX SWDL800 Augered Pile Rig for Sale on Okorder.com System 2
CMAX SWDL800 Augered Pile Rig for Sale on Okorder.com

CMAX SWDL800 Augered Pile Rig for Sale on Okorder.com

Ref Price:
get latest price
Loading Port:
Shanghai
Payment Terms:
TT OR LC
Min Order Qty:
1 unit
Supply Capability:
1000 unit/month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

CMAX series spiral pile drill rig is a new type of simple drilling equipment with independent innovation, ideal for pile construction in solar panels, billboards, street lamp, fences, flagpoles, traffic signs, isolation net and simple houses, giving strong stratum adaptability and high efficiency.

◆ The rig is equipped with a large torque rotary head for strong power, which provides strong adaptability in stratum.

The hydraulic system adjusts rotation and feed to the stratum conditions accurately, which ensures high drilling efficiency.

The rig is equipped with a pile guide device to guarantee pile verticality and quality.

The rig can be equipped with various pile connecting devices according to the pile structure and size, which makes pile insertion flexible and efficient.

◆ In different stratum condition, the rig can be equipped with down-the-hole percussion, cutting, short spiral and other tools to achieve full stratum drilling.


MAIN DATAUNITSWDL800
OPERATION PARAMETER 
Pile diametermm76~200
Pile depthm4
CHASSIS

Track basemm2745
Gaugemm2312
Crawler widthmm350
Ground clearancemm460
Blade lengthmm/
ENGINE

Model
4BT3.9
DisplacementL3.9
Power/SpeedkW/rpm75/2200
Fuel tank capacityL300
FEED

Length of drillrigmm6920
Feed lengthmm4500
Feed speedm/min4
Feed forcekN75
TRAVELLING

Travel speedkm/h3.2/2.0
Traction force, maxkN100
Hill climbing ability°25
ROTARY

Rotary speed, maxrpm40
Rotary torque, maxNm6000
ENSION

Gross weightt16
Diamension(L×W×H)m9.04×2.95×3.4


Advantages

1 sincere

CNBM International is a state company, now is one of the largest state-owned group cooperation in China! All the outdoor heaters produced by CNBM are compliant with the national level quality.

2 professional

Our engineers will at your services 24hours to answer your questions. Our goal is to provide the best professional services.

3 quality

 CNBM International’s outdoor heater have strict quality control, only the best quality products can pass the test.

4speed

 We have professional sales team to guarantee your reply within 12hours to save your precious time.

5 After sales

If the tower crane has any problems, we will solve your problems in first time.

 

FAQ

1.Which payment terms can we accept?

  Normally we can work on T/T term or L/C.If you choose T/T,30% payment is required in advance and 70% balance shall be settled before shipment often,it rang a little.

2.How long will our price be valid?

We are friendly dealer, never greedy windfall profit, our price remains stable,except the exchange rate and the increasing labor cost and material cost.

3.What are our advantages compared with manufacturers?

a.Detailed training-We can provide training services to different users. The training sessions include product training,operating training, maintenance know-how,standard and so on to fulfill your individual needs.The training can be conducted at client’s site.

b.Available after service-With our global distributor network, you are guaranteed with fast deliveries and services if you submit your requests.



 


Q: Pile up can not go down, how to deal with?
The diameter of the hole pile is generally one to two smaller than that of the designed pipe pile, which can ensure the friction force of the pipe pile. Notice of design change shall be given to the design institute.
Q: The impact of drilling pile driver how much money
Hello, impact drilling pile driver is about one hundred thousand and one sets, the specific depends on how big you hit the pile, the specific configuration, Nantong punching pile machine factory specializing in the production of punching piling machine, hand impact drill, hoist
Q: What is the working principle of a pile driver?
Hammer piling machinePile hammer comprises a hammer head and a hammer base, with steam or compressed air as a driving force, a single action and double action two hammer hammer. Single acting piston or cylinder as the hammer to hammer, steam driven hammer up, then let the hammer seat along the guide rod fall and piling. Double acting steam hammer is increased as the plunger cylinder as the hammer to hammer, steam driven hammer up, then drive the downward impact hammer piling. The reciprocating speed is high and the frequency is high, so that the pile can vibrate when penetrating into the stratum, and the friction resistance can be reduced, and the pile driving effect is good. Differential two-way unequal force hammer, the hammer seat light weight, effective impact weight can be relatively stronger and better performance. The hammer into the exhaust valve reversing by manual control, can also be installed in the side with the hammer and hammer lifting flange lever automatic control, impact stroke two ways can adjust the hammer.
Q: Is the spiral pile driver still being dug? Is it easy to operate? How many people do you need?
Shandong strong pile driver without manual shovel, the operation panel is very simple, a day will be able to operate skillfully, an operator can work, save worry and effort.
Q: What are the preparations for the piling site?
1, the pile position determination: according to the project provided by the construction unit and the pile axis location map of pile location, pile location must be accurate, and in the pile position by a soldering iron drilling, hole depth is 15~20cm, filled with lime, prevent in the process of driving the wrong pile.2. Pile up(1) pile stacking shall be determined by pile driving route and pile driving sequence(2) the site shall be level and level with three passes and one leveling. Remove obstacles in the ground, underground and air in the range of the moving of the pile driver. The wooden posts and the pile rings shall be of the same position, except for the contact between the pile and the pile, and nothing else shall be in contact with the pile so as to prevent cracks in the pile.(3) the strength of reinforced concrete precast piles must be up to 100% before they can be transported and piled3, the selection of pile machineAccording to the design of single pile bearing capacity and pile length, this project intends to use hammer weight 2.5t track type diesel pile driver.
Q: How much can a pile driver make in a year?
Hello Can contact Huilong spiral drill, rotary drilling is burning diesel, the average is 40 or so, to see what much of the diesel engine, what brand of Oh ~ what needs, you can consult a wylong machinery in Hunan!
Q: How to operate the excavator pile driver?
6, advanced circuit design, make the card pile and vibration synchronization, improve efficiency, pile, better protection of the main oil system of excavator, the new design of safety device, when the shock operation safety device enables automatic stepping with sheet pile chuck, loose, safe and efficient;7, imported Japanese cylindrical rod bearings, low noise, high speed, high reliability, the whole machine quality is better;8, when hitting and pulling out the pile, the speed and vibration frequency can be adjusted to meet the requirements of different working conditions;9 、 optimization design device, protection of both ends of the pile is not easy to damage, the building in close distance operation will not damage the building itself;10 、 adopt famous brand shock absorber to reduce vibration and noise, meet the requirement of environmental protection, and improve the reliability of the machine.Note: in the underwater operation, we need to add the exhaust pipe.
Q: The pile driving team has many years of piling experience, to undertake the construction of large and small piles, includingKongguanzhu
To consider how the site can take back the unearthed excavation method is ABC pile test done to dig a long tight schedule but also increase the test equipment such as AC two AC after completion of the test sequence can also do a ramp to the middle of the excavation
Q: In the construction project, the pile driver can not be reached. What should the supervisor do?
Stop. Check cause. Geological prospecting and prospecting
Q: What machinery is suitable for a PV pile driver?
Are you talking about a small hammer pile driver for excavators? If you are playing a photovoltaic pile (hollow pipe pile) below 9 meters,

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

Hot products


Hot Searches

Related keywords