• CMAX SWDL800 Augered Pile Rig for Sale on Okorder.com System 1
  • CMAX SWDL800 Augered Pile Rig for Sale on Okorder.com System 2
CMAX SWDL800 Augered Pile Rig for Sale on Okorder.com

CMAX SWDL800 Augered Pile Rig for Sale on Okorder.com

Ref Price:
get latest price
Loading Port:
Shanghai
Payment Terms:
TT OR LC
Min Order Qty:
1 unit
Supply Capability:
1000 unit/month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

CMAX series spiral pile drill rig is a new type of simple drilling equipment with independent innovation, ideal for pile construction in solar panels, billboards, street lamp, fences, flagpoles, traffic signs, isolation net and simple houses, giving strong stratum adaptability and high efficiency.

◆ The rig is equipped with a large torque rotary head for strong power, which provides strong adaptability in stratum.

The hydraulic system adjusts rotation and feed to the stratum conditions accurately, which ensures high drilling efficiency.

The rig is equipped with a pile guide device to guarantee pile verticality and quality.

The rig can be equipped with various pile connecting devices according to the pile structure and size, which makes pile insertion flexible and efficient.

◆ In different stratum condition, the rig can be equipped with down-the-hole percussion, cutting, short spiral and other tools to achieve full stratum drilling.


MAIN DATAUNITSWDL800
OPERATION PARAMETER 
Pile diametermm76~200
Pile depthm4
CHASSIS

Track basemm2745
Gaugemm2312
Crawler widthmm350
Ground clearancemm460
Blade lengthmm/
ENGINE

Model
4BT3.9
DisplacementL3.9
Power/SpeedkW/rpm75/2200
Fuel tank capacityL300
FEED

Length of drillrigmm6920
Feed lengthmm4500
Feed speedm/min4
Feed forcekN75
TRAVELLING

Travel speedkm/h3.2/2.0
Traction force, maxkN100
Hill climbing ability°25
ROTARY

Rotary speed, maxrpm40
Rotary torque, maxNm6000
ENSION

Gross weightt16
Diamension(L×W×H)m9.04×2.95×3.4


Advantages

1 sincere

CNBM International is a state company, now is one of the largest state-owned group cooperation in China! All the outdoor heaters produced by CNBM are compliant with the national level quality.

2 professional

Our engineers will at your services 24hours to answer your questions. Our goal is to provide the best professional services.

3 quality

 CNBM International’s outdoor heater have strict quality control, only the best quality products can pass the test.

4speed

 We have professional sales team to guarantee your reply within 12hours to save your precious time.

5 After sales

If the tower crane has any problems, we will solve your problems in first time.

 

FAQ

1.Which payment terms can we accept?

  Normally we can work on T/T term or L/C.If you choose T/T,30% payment is required in advance and 70% balance shall be settled before shipment often,it rang a little.

2.How long will our price be valid?

We are friendly dealer, never greedy windfall profit, our price remains stable,except the exchange rate and the increasing labor cost and material cost.

3.What are our advantages compared with manufacturers?

a.Detailed training-We can provide training services to different users. The training sessions include product training,operating training, maintenance know-how,standard and so on to fulfill your individual needs.The training can be conducted at client’s site.

b.Available after service-With our global distributor network, you are guaranteed with fast deliveries and services if you submit your requests.



 


Q: Is there a pile driver in it?
There's one in the neighborhood. Can find other counterparts to learn, skilled in their own open. However, the piling machine is not stable, but also a team together. And we're going out of town, this month, ten days.
Q: My family is in the countryside, and now more than 100 meters behind the house in the pile is the kind of shock, our house is built in 99 years, has been very good. Since the piling, I have been shaking the door, the construction party every day for more than 8 hours, has been more than 10 days, and now I have a lot of cracks in the floor. What's the influence of our family, please? Are there any rules for investigating what should be done before piling?
In engineering piling, because of the huge impact force, it can produce shock wave, which will cause some damage to the surrounding building.
Q: Is the spiral pile driver still being dug? Is it easy to operate? How many people do you need?
Tengzhou Five Dragon pile driver is very good, without artificial shovel, 360 degrees rotation, six minutes can hit ten meters, diameter two meters!
Q: Excavators, pile drivers, how to operate? The master knows,
Then, the left handle back down and right arm handle down the left arm when receiving bucket, bucket is full. Then the big arm, left or right rotation and small rotating arm bucket on the line! Got it?! You can also question me!
Q: such as bulldozers, pile drivers, cranes and cement mixers?
Construction industry users are not the public works team? Yes, this is the construction units to the construction enterprises to provide machinery, construction settlement time, count less money.
Q: Pile driver model, which brand is better?
Small rotary drilling rig and small pile driver, the foundation pile foundation, compared to the screw pile driver, can meet all kinds of large-scale infrastructure construction requirements.
Q: Principles of piling
The structure of a pile driver consists of a pile hammer, a pile stand and auxiliary equipment. The pile hammer is attached to two parallel vertical guide rods (commonly called Longmen) at the front of the pile support and hoisted with lifting hooks. The pile foundation is a steel structure tower with a windlass at the back of which is used to lift the pile and hammer. A guide frame consisting of two guide rods is used in front of the pile to control the direction of the pile driving so that the pile can be accurately penetrated into the formation in accordance with the design orientation. The tower and the guide frame can be used to batter pile deflection. The guide frame can also be extended downward along the tower and used to fetch water along the embankment or pier. The pile can move and move. The basic technical parameters of a pile driver are impact weight, impact kinetic energy and impact frequency. According to the motion of the pile hammer power source can be divided into hammer, hammer, diesel hammer, hydraulic hammer etc..
Q: How many kinds of pile driver are there?
and hammer lifting flange lever automatic control, impact stroke two ways can adjust the hammer. Three diesel hammer body is made of cylinder and piston, similar to the working principle and the single cylinder two stroke diesel engine into the cylinder combustion under high temperature and high pressure atomized diesel combustion chamber by injection pressure generated by the detonation driven hammer working. According to the structural form of diesel hammer rod and cylinder type separation. The guide rod type diesel hammer is pressed on the pile cap with a plunger as a hammer seat, and the cylinder is used as a hammer head to move up and down along the two guide rods. When in operation, the pile hanging in place pile frame in Longmen, then put the diesel hammer at the top of the pile, the hook will lift down the cylinder, and the cylinder sleeve off hook to the whereabouts of the piston, the cylinder will be closed in the air compression cylinder rocker pin until the pressure continues to fall outside the cylinder pushing hammer on the base of the fuel pump, fuel pump will be injected into the cylinder oil mist, oil mist meet high temperature gas burning immediately above, blasting, explosive shock down pile., to push the cylinder to cylinder to rise, fall along the guide rod, and the beginning of the second impact cycle.
Q: Why should the pile foundation be excavated after the pile driving?
The construction of the pile foundation shall be done by piling and excavating the earth as follows:The first excavation, construction and basement, excavation depth from plus or minus 00 may have a depth of 4 meters, 4 meters below the ground, the general quality is difficult to ensure, at this time it is difficult to support the ground operation requirements, especially when the mechanical operation. It is difficult to estimate the change of groundwater, the coming of rainy season, and the cost and time of these external factors will be played directly as compared with the original ground.In general, the plant should dig the earth before the foundation pit is supported, and then the pile will be made. Concrete car can be outside the pit, by pouring over to the bottom of the pit. Of course, if the surface of the excavation is silt layer / or below the shallow water level is special. If the deep foundation pit is used, it is better to dig the soil first and then make the pile, so the concrete pouring is not a problem.The soft soil area must have been dug before and after, for a very simple reason. Soft soil generally has a hard surface layer, so that it is conducive to the movement and construction of pile foundation. If there is no hard surface on the surface, then make the cast-in-place bottom and then pile the pile. In addition, the foundation pit supporting in the soft soil area is a relatively difficult and easy to occur accident process, and the construction grouting pile will certainly affect the excavation and support of basement, and the mud pool will not know where to put it.
Q: How much is it to put a pile driver on the tractor?
In fact, it is better to buy one directly on the tractor. We all have a cheap and good mechanical pile driver, and the quality is good. For details, please Baidu "Teng Teng machinery."".

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

Hot products


Hot Searches

Related keywords