CMAX SWDH90 Hydraulic Rock Drill Sale on Okorder
- Loading Port:
- Shanghai
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 1 unit
- Supply Capability:
- 1000 unit/month
OKorder Service Pledge
OKorder Financial Service
You Might Also Like
CMAX SWDH60Hydraulic Rock Drill Sale on Okorder
1. Equipped with hydraulic rock drill of international famous brand with reliable performance and high efficiency.
2. Key components are produced in the same platform as that of the cutting drill, which faciliates the mutual modification with cutting drill, thus to realize multifunction of one machine.
3. It is as flexible and convenient in amplitude adjustment, upper swing, walking ability as that for the excavator.
4. Equipped with the independently developed drilling logic block, and self-adjustment can be achieved for the work parameters with the change in rock conditions, thus to effectively extend the drill life.
MAIN DATA | UNIT | SWDH 90 |
---|---|---|
OPERATION PARAMETER | ||
Drill rod | T38 | |
Drill rod length | mm | 3660 |
Hole range | mm | 64~89 |
Hole depth, max | m | 10 |
speed | m/min | 1 |
Dust collection device | Dry | |
AIR COMPRESSOR | ||
Model | SA30-SW | |
Working pressure | MPa | 0.7 |
Free air delivery | m³/min | 5 |
Power | kW | 30 |
ENGINE | ||
Model | 6BT5.9-C150 | |
Power/Speed | kW/rpm | 110 / 2200 |
Fuel tank capacity | L | 300 |
FEED | ||
Length of drillrig | mm | 5400 |
Feed length | mm | 4000 |
Feed speed | m/s | 0.06 |
Feed force, max | kN | 10~15 |
TRAVELLING | ||
Travel speed | km/h | 5.0 / 3.0 |
Traction force, max | kN | 65 |
Hill climbing ability | ° | 25 |
Ground clearance | mm | 348 |
Ground pressure | bar | 0.425 |
ROCK DRILL | ||
Model | HC50 | |
Shank adapter specification | T38 | |
Rotary speed, max | rpm | 195 |
Rotary torque, max | Nm | 415 |
Percussion pressure | bar | 130 |
Impact power | J | 210 |
DIAMENSION | ||
Gross weight | t | 9 |
Transportation state( L×W×H) | m | 9×2.6×3.15 |
Working state( L×W×H) | m | 6.4×2.6×5.85 |
Advantages
1 sincere
CNBM International is a state company, now is one of the largest state-owned group cooperation in China! All the outdoor heaters produced by CNBM are compliant with the national level quality.
2 professional
Our engineers will at your services 24hours to answer your questions. Our goal is to provide the best professional services.
3 quality
CNBM International’s outdoor heater have strict quality control, only the best quality products can pass the test.
4speed
We have professional sales team to guarantee your reply within 12hours to save your precious time.
5 After sales
If the tower crane has any problems, we will solve your problems in first time.
FAQ
1.Which payment terms can we accept?
Normally we can work on T/T term or L/C.If you choose T/T,30% payment is required in advance and 70% balance shall be settled before shipment often,it rang a little.
2.How long will our price be valid?
We are friendly dealer, never greedy windfall profit, our price remains stable,except the exchange rate and the increasing labor cost and material cost.
3.What are our advantages compared with manufacturers?
a.Detailed training-We can provide training services to different users. The training sessions include product training,operating training, maintenance know-how,standard and so on to fulfill your individual needs.The training can be conducted at client’s site.
b.Available after service-With our global distributor network, you are guaranteed with fast deliveries and services if you submit your requests.
- Q: Will the crawler auger / pile driver dig out the soil and put it aside or can it be removed far away?
- The pile driver can be placed alongside or extended to 2 or 3 meters.
- Q: Is there a pile driver in it?
- There's one in the neighborhood. Can find other counterparts to learn, skilled in their own open. However, the piling machine is not stable, but also a team together. And we're going out of town, this month, ten days.
- Q: In what type of terrain can the survival machine be used to strike minerals?
- Any terrain. As long as you dare to go down
- Q: How to operate the excavator pile driver?
- 6, advanced circuit design, make the card pile and vibration synchronization, improve efficiency, pile, better protection of the main oil system of excavator, the new design of safety device, when the shock operation safety device enables automatic stepping with sheet pile chuck, loose, safe and efficient;7, imported Japanese cylindrical rod bearings, low noise, high speed, high reliability, the whole machine quality is better;8, when hitting and pulling out the pile, the speed and vibration frequency can be adjusted to meet the requirements of different working conditions;9 、 optimization design device, protection of both ends of the pile is not easy to damage, the building in close distance operation will not damage the building itself;10 、 adopt famous brand shock absorber to reduce vibration and noise, meet the requirement of environmental protection, and improve the reliability of the machine.Note: in the underwater operation, we need to add the exhaust pipe.
- Q: How to select the configuration of the pile driver, which parts are the key concerns?
- Code of practice for safety operation of pile drivers(1) all operators of piles and machines should be trained and passed the examination, and obtain special operation personnel's operation certificate. Undocumented operation is strictly prohibited.(2) the pile shall be vertical and the pile forward shall not exceed 5 degrees, and the back shall not exceed 18 degrees.(3) the angle between the steel wire rope and the guide rod shall not be greater than 30 degrees, and the lifting stake shall be operated according to the operation rules of the lifting operation. It is strictly prohibited to tilt or tilt when lifting precast piles.(4) the hammer of the wire rope should be slightly relaxed after instrumentation, to prevent the hammer lay wire rope, tug, hammer head hook should be locked.
- Q: How to maintain the pile driver daily?
- (4) dealing with leakage and damage of hydraulic system in time. (5) count the tools and scrub them clean. Fill in the equipment operation record, and make the writing clear, neat, complete and accurate.First level maintenance: (120~150 hours per work) on the basis of the completion of the maintenance of the whole work of each class.
- Q: What about a dry digger, a pile driver? How much money? What's the speed?
- Shanghai Zhonglian second-hand excavator market professional solution for you:1, the dry piling machine can be refitted by excavator, but in fact it is very convenient.
- Q: What safety measures should be taken when assembling a pile driver?
- This thing must have the safety, rules and regulations, but the key is to have this awareness, the following for your reference, I hope to help you.1 、 safety management system of mechanical equipmentLeaders at all levels should strengthen the safety work of mechanical equipment often carry out safety production leadership, ideological education and safety education of workers, the leaders at all levels included in the safety target management schedule, prohibited illegal command, illegal operation, violation of labor discipline and reckless ignorance and other unsafe behavior, leaders should regularly organize relevant personnel go to the scene, the supervision and inspection of mechanical safety work, to correct the problem, promptly eliminate hidden dangers, make the mechanical equipment to achieve safety, high quality, high efficiency and low energy consumption operation, the long-term safe production and take measures to eliminate hidden dangers and prevent accidents of personnel should be commended and rewarded.Urge all kinds of machinery and equipment operators to seriously study safety technical operation procedures, and those who violate safety technical procedures must be stopped, and can be continued before improvement. After the arrival of the new model, there is no safety technical operating procedures, it must be in accordance with the requirements of the instructions, first formulate safety operation procedures and precautions before they can be put into use.
- Q: How much is it to put a pile driver on the tractor?
- RMB is enough for ten million eyesAskI reckon it's about the sameChasing the answerUh huh ha ha
- Q: How can I find a pile driver?
- 1, and housing units in charge of the link. Party A has the final say that the foundation works are usually separate from the superstructure.2. Keep in touch with the construction contractor, who will be required to subcontract after work.3, keep in touch with the design unit so that they may design more projects with piles.4, keep in touch with geological prospecting units and collect information.All this has been done and your business can't be done.
Send your message to us
CMAX SWDH90 Hydraulic Rock Drill Sale on Okorder
- Loading Port:
- Shanghai
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 1 unit
- Supply Capability:
- 1000 unit/month
OKorder Service Pledge
OKorder Financial Service
Similar products
Hot products
Hot Searches
Related keywords