• CMAX SWDH90 Hydraulic Rock Drill Sale on Okorder System 1
  • CMAX SWDH90 Hydraulic Rock Drill Sale on Okorder System 2
CMAX SWDH90 Hydraulic Rock Drill Sale on Okorder

CMAX SWDH90 Hydraulic Rock Drill Sale on Okorder

Ref Price:
get latest price
Loading Port:
Shanghai
Payment Terms:
TT OR LC
Min Order Qty:
1 unit
Supply Capability:
1000 unit/month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

CMAX SWDH60Hydraulic Rock Drill Sale on Okorder

1. Equipped with hydraulic rock drill of international famous brand with reliable performance and high efficiency.

2. Key components are produced in the same platform as that of the cutting drill, which faciliates the mutual modification with cutting drill, thus to realize multifunction of one machine.

3. It is as flexible and convenient in amplitude adjustment, upper swing, walking ability as that for the excavator.

4. Equipped with the independently developed drilling logic block, and self-adjustment can be achieved for the work parameters with the change in rock conditions, thus to effectively extend the drill life.

MAIN DATAUNITSWDH 90
OPERATION PARAMETER 
Drill rod
T38
Drill rod lengthmm3660
Hole rangemm64~89
Hole depth, maxm10
speedm/min1
Dust collection device
Dry
AIR COMPRESSOR

Model
SA30-SW
Working pressureMPa0.7
Free air deliverym³/min5
PowerkW30
ENGINE

Model
6BT5.9-C150
Power/SpeedkW/rpm110 / 2200
Fuel tank capacityL300
FEED

Length of drillrigmm5400
Feed lengthmm4000
Feed speedm/s0.06
Feed force, maxkN10~15
TRAVELLING

Travel speedkm/h5.0 / 3.0
Traction force, maxkN65
Hill climbing ability°25
Ground clearancemm348
Ground pressurebar0.425
ROCK DRILL

Model
HC50
Shank adapter specification
T38
Rotary speed, maxrpm195
Rotary torque, maxNm415
Percussion pressurebar130
Impact powerJ210
DIAMENSION

Gross weightt9
Transportation state( L×W×H)m9×2.6×3.15
Working state( L×W×H)m6.4×2.6×5.85




Advantages

1 sincere

CNBM International is a state company, now is one of the largest state-owned group cooperation in China! All the outdoor heaters produced by CNBM are compliant with the national level quality.

2 professional

Our engineers will at your services 24hours to answer your questions. Our goal is to provide the best professional services.

3 quality

 CNBM International’s outdoor heater have strict quality control, only the best quality products can pass the test.

4speed

 We have professional sales team to guarantee your reply within 12hours to save your precious time.

5 After sales

If the tower crane has any problems, we will solve your problems in first time.

 

FAQ

1.Which payment terms can we accept?

  Normally we can work on T/T term or L/C.If you choose T/T,30% payment is required in advance and 70% balance shall be settled before shipment often,it rang a little.

2.How long will our price be valid?

We are friendly dealer, never greedy windfall profit, our price remains stable,except the exchange rate and the increasing labor cost and material cost.

3.What are our advantages compared with manufacturers?

a.Detailed training-We can provide training services to different users. The training sessions include product training,operating training, maintenance know-how,standard and so on to fulfill your individual needs.The training can be conducted at client’s site.

b.Available after service-With our global distributor network, you are guaranteed with fast deliveries and services if you submit your requests.



 


Q: Which price is low for a pile driver?
Specializing in sales of steel sheet pile, steel sheet pile construction, leasing, model complete, high quality, the construction of steel sheet pile, the price is more favorable, and exquisite design, honest and trustworthy business purposes, in full accordance with the market-oriented, large-scale, standardized operation requirements specification, through the implementation of brand strategy to build the core competitiveness of enterprises
Q: Will the crawler auger / pile driver dig out the soil and put it aside or can it be removed far away?
According to the length of the pole of the pile driver, the distance is different.
Q: What is a pile driver used for?
As the name suggests, of course, piling is used, such as building houses, foundations, bridges, foundations and so on. For soft foundation construction site, the design of concrete prefabricated pile or steel pipe pile made of pile, use a pile driver to hit the ground until the design of the formation.
Q: How much can a pile driver make in a year?
Hello Can contact Huilong spiral drill, rotary drilling is burning diesel, the average is 40 or so, to see what much of the diesel engine, what brand of Oh ~ what needs, you can consult a wylong machinery in Hunan!
Q: Code for installation and operation of pile drivers
4. Check whether the voltage of the power supply meets the requirements.5, according to the daily maintenance project to each department lubrication, maintenance.Five, pile driver in the work safety precautions:1, when the piling machine work, there should be special command. The conductor and operator should check each other's signals before they work. Work closely together.2, at the start of the bell signal or other applications, notify the staff around to leave.3, hammer and pile cap, pile cap and column (or pile) plane to pad, a connecting bolt should be tightened, and should always check whether there is loose.4. The starting of the pile driver should be adjusted from low gear to high speed.5, the pile driver in the work should be closely observed on the control panel current, voltage instructions. If abnormal sound or other abnormal conditions are found, stop inspection immediately.6, always check the temperature of the bearing and the bearing cover screws is loosening, should strictly examine the eccentric block coupling screw loosening, prevent the occurrence of accidents.7, sink, column (or pile) prohibited to stand around.8, piling machine with water, mud suction sink, should contact in advance with the relevant personnel, and take care of each other at work.9, long pipe column or pile and the installation of pile cap, the staff must wear safety belts.10 、 in the process of sinking, it is strictly prohibited to do mechanical maintenance work.Six after the stop of the piling machine, the power shall be cut off immediately, and the pile driver and motor shall be inspected and maintained.Seven, piling machine long-term disabled, should be kept in storage, the motor should be good moisture-proof protection, the control panel of the instrument, should be removed, storage, storage.
Q: What's the difference between a pile driver and a boring pile driver?
Piling machine generally refers to prefabricated prefabricated pile hoisting, with heavy hammer into the underground or static pressure into the underground machinery. The bored pile machine is the first hole, the next steel cage, and then pouring concrete machinery.The difference is that the pile in the construction of the pile driver is prefabricated.The bored pile machine is a cast-in-place pile on the spot
Q: How much is piling foundation for pile driving machine?
I was in Guizhou, bought the first 11 years, 14 years and bought 2 units, 3 units are now everywhere, run the project, if the driver what is wrong, in a Matlock service team would hasten to help you solve!
Q: Why is AMD's CPU name a pile driver or something?
Just like before the Sempron, Athlon, Duron, pterosaur, AMD CPU style is quite interesting.
Q: Does the pile driver belong to special equipment?
It's special equipment. I'm driving the pile driver. Buy the machine and contact me with the workers
Q: How do I maintain the hydraulic pile driver I bought?
the workload of the project; the geographical environment of the project; and the price the boss expects.

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

Hot products


Hot Searches

Related keywords