CMAX 150 Augered Pile Rig for Sale on Okorder.com
- Loading Port:
- Shanghai
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 1 unit
- Supply Capability:
- 1000 unit/month
OKorder Service Pledge
OKorder Financial Service
You Might Also Like
CMAX series spiral pile drill rig is a new type of simple drilling equipment with independent innovation, ideal for pile construction in solar panels, billboards, street lamp, fences, flagpoles, traffic signs, isolation net and simple houses, giving strong stratum adaptability and high efficiency.
◆ The rig is equipped with a large torque rotary head for strong power, which provides strong adaptability in stratum.
◆ The hydraulic system adjusts rotation and feed to the stratum conditions accurately, which ensures high drilling efficiency.
◆ The rig is equipped with a pile guide device to guarantee pile verticality and quality.
◆ The rig can be equipped with various pile connecting devices according to the pile structure and size, which makes pile insertion flexible and efficient.
◆ In different stratum condition, the rig can be equipped with down-the-hole percussion, cutting, short spiral and other tools to achieve full stratum drilling.
MAIN DATA | UNIT | SWDL150 |
---|---|---|
OPERATION PARAMETER | ||
Pile diameter | mm | 76 |
Pile depth | m | 1.8 |
CHASSIS | ||
Track base | mm | 1430 |
Gauge | mm | 1150 |
Crawler width | mm | 250 |
Ground clearance | mm | 280 |
Blade length | mm | 1400 |
ENGINE | ||
Model | YANMAR-3TNV82A | |
Displacement | L | 1.331 |
Power/Speed | kW/rpm | 16/2200 |
Fuel tank capacity | L | 42.5 |
FEED | ||
Length of drillrig | mm | 3400 |
Feed length | mm | 2000 |
Feed speed | m/min | 2 |
Feed force | kN | 15 |
TRAVELLING | ||
Travel speed | km/h | 4.7/2.6 |
Traction force, max | kN | 19 |
Hill climbing ability | ° | 20 |
ROTARY | ||
Rotary speed, max | rpm | 40 |
Rotary torque, max | Nm | 1500/3000 |
ENSION | ||
Gross weight | t | 3 |
Diamension(L×W×H) | m | 5.65×1.4×2.6 |
Advantages
1 sincere
CNBM International is a state company, now is one of the largest state-owned group cooperation in China! All the outdoor heaters produced by CNBM are compliant with the national level quality.
2 professional
Our engineers will at your services 24hours to answer your questions. Our goal is to provide the best professional services.
3 quality
CNBM International’s outdoor heater have strict quality control, only the best quality products can pass the test.
4speed
We have professional sales team to guarantee your reply within 12hours to save your precious time.
5 After sales
If the tower crane has any problems, we will solve your problems in first time.
FAQ
1.Which payment terms can we accept?
Normally we can work on T/T term or L/C.If you choose T/T,30% payment is required in advance and 70% balance shall be settled before shipment often,it rang a little.
2.How long will our price be valid?
We are friendly dealer, never greedy windfall profit, our price remains stable,except the exchange rate and the increasing labor cost and material cost.
3.What are our advantages compared with manufacturers?
a.Detailed training-We can provide training services to different users. The training sessions include product training,operating training, maintenance know-how,standard and so on to fulfill your individual needs.The training can be conducted at client’s site.
b.Available after service-With our global distributor network, you are guaranteed with fast deliveries and services if you submit your requests.
- Q: Working principle of pile driver
- The guide frame can also be extended downward along the tower and used to fetch water along the embankment or pier. The pile can move and move. The basic technical parameters of a pile driver are impact weight, impact kinetic energy and impact frequency. According to the motion of the pile hammer power source can be divided into hammer, hammer, diesel hammer, hydraulic hammer etc..The pile driver also has a rotary pile driver, which is dug into the ground with a screw and then filled with piles.
- Q: With the hd62 hammer machine, the last three strikes are 10 strikes, and the control is within 5 centimeters. Is that the height of the hammer fall?
- Depends on what pile you're playing. How big is it?. High strength prestressed pipe pile is about 300 if the drop is 1.8-2.0 meters, hammering 2CM (can slightly relax, because 62 300 large heavy hammer hammer); high strength prestressed pipe pile is about 400-600 if the drop is 1.8-2.0 meters, hammering 2CM.
- Q: What is the starting current for a 55 kW pile driver? What's the big leakage switch, please?
- 250A circuit breaker startup selection step-down start cannot be launched directly, or may cause voltage drop greatly,
- Q: Rural housing foundation, piling machine generally can play how deep?
- In a spiral track Matlock advantage:1 、 simple operation, one hole forming,2, fast, 3-5 minutes can become holes 5 meters3, the maximum diameter of the hole 800mm, the maximum hole depth of 10m, suitable for housing construction, highway, high-speed rail slope protection and other pile foundation construction4, special, mobile convenient, 360 degrees of free rotation5, firewood and electricity dual-use, reduce cost expensesA Hui Omron caterpillar rotary drilling rig advantage:1, the fastest 20 minutes, you can dig 5-8 meters of earth drilling2, drilling can break strong weathering rock layer3, the well-known brand of the engine, "Yuchai, Weichai, fuel consumption of 40-50 yuan per hour.4 、 selection of multi-functional parts, such as: Clay bit, sand fishing drill, bottom drill bit, easy to change, practical.
- Q: Want to mortgage a hydraulic pile driver?. Excuse me, what brand, what tonnage is more competitive?.Could you introduce the profit, expense, cash flow of piling machine, the more detailed, the better.
- Qingyuan Xin Feng Machinery Factory production of 2 Taiwan good ~ we are the brand ~ I just listen to my father said that the specific amount should be 200 thousand ~ a ~ details of your advice of high manager soldiers accounted for ~ should Baidu can be found in the.
- Q: All say that it is a solid foundation, anti settlement, but what is the specific principle of the ah? To the ground where a few concrete pillars will be able to prevent settlement?
- It supports the whole building. (some very it takes long, the friction between the pile and soil to provide capacity, do not need to enter the good earth.)And in the composite foundation pile, cement mixing pile, such as fly ash gravel pile, equivalent is used to reinforce the foundation.
- Q: How much is the average cost of piling a metre?.Construction Engineering piling machine how much money? (can be more than 30) piling generally hit a meter, what is the cost?. How much can I pay for a metre? What's the procedure for piling operators?
- Need fifty or so, a twenty meters stake will not exceed one thousand dollars, the operation of pile machine need pile machine driver's license, also can hang some of the company's account.
- Q: How much money piling machine, which is good
- Depends on how big you buy, Shandong force strong pile driving function to play within 20 meters deep, within a meter of aperture, online direct search can find him
- Q: What machinery is used for piling?
- In fact, in some places with artificial, you can go to buy a wylong machinery piling machine equipment is good, driving fast and convenient and money
- Q: Is the lever of the pile driver fast?
- Wylong machinery piling machine organic lock rod, have lock rod grinding machine, the lock rod piling machine stone concrete ground relatively quickly, the lock rod grinding play the soil faster.
Send your message to us
CMAX 150 Augered Pile Rig for Sale on Okorder.com
- Loading Port:
- Shanghai
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 1 unit
- Supply Capability:
- 1000 unit/month
OKorder Service Pledge
OKorder Financial Service
Similar products
Hot products
Hot Searches
Related keywords