• yuchai YC260R Rotary drilling rig. System 1
yuchai YC260R Rotary drilling rig.

yuchai YC260R Rotary drilling rig.

Ref Price:
get latest price
Loading Port:
China Main Port
Payment Terms:
TT OR LC
Min Order Qty:
-
Supply Capability:
-

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

yuchai YC260R Rotary drilling rig

Technical Specifications

Item

Parameters

Chassis

Engine Model

 

CUMMINS QSM11-C330

Rated Power/Speed

kW/rpm

246/2100

Outer Width of Crawler

mm

4400

Width of Crawler Plate

mm

800

Hauling Force

kN

520

Power Head

Maximum Torque

kN·m

260

Speed

r/min

6-26

Maximum Pressure

kN

200

Maximum Pulling Force

kN

250

Pressurized Cylinder Stroke

mm

5000

Hoist

Main Hoist

 

 

First Layer of Lifting Force

kN

280

Maximum Lifting Speed

m/min

55

Diameter of Wirerope

mm

Φ32

Auxiliary Hoist

 

 

First Layer of Lifting Force

kN

80

Maximum Lifting Speed

m/min

65

Diameter of Wirerope

mm

Φ20

Mast

Rake Angle

°

5

Left/Right Tilt Angle

°

±4

Hydraulic Pump

Maximum Pressure

Mpa

35

Hole Depth

Hole Diameter

Maximum Drilling

mm

2500

Maximum Drilling Depth

m

80

Drill Pipe

Drilling Pipe

mm

Φ508

Working Weight

t

82

Keywords:rotary drilling dig,yuchai rotary drilling dig,weichai rotary drilling rig,weichai,chinese rotary drilling rig


Q: Why levy piling
Like a chopstick, inserted into the soil is not directly on the ground than in a more stable, the pile is equivalent to the chopsticks into the earth part.
Q: How deep can a pile driver work?
As the drill wylong machinery in rotary machine is capable of hitting at least 20 meters deep
Q: But in a few days, wait for the water to ease up, and plug it directly with earth rockIs there no way directly to seal the breach?
18:30 on June 21, 2010, Nadekawa sang Kay dike burst. On the morning of June 22nd, the measured changkai dike burst width of 340 meters. 25 days 12 when monitoring data: diwai water level 36.08 meters, 35.90 meters, the water level was an average depth of 4.06 meters, the water area of 1170 square meters, the average flow of 1280 cubic meters per second, the flow rate of 1.09 meters per second. (excerpt from: Fuzhou Hydrological Bureau Author: Liu Jianming)From 18:30 on June 21st to 25, 12, that is, in 90 hours after the average flow rate of 1.09 meters per second, it is estimated that within 24 hours of the dike burst, the average flow rate should be 5~8 meters per second or higher. And the average depth of 4.06 meters, according to the wooden pile into the water 3 meters, 1 meters above the surface, the length of the stakes should be no less than 8 meters.
Q: I have been using a common type of 260 fence pile driver, I still feel good with the use of, I heard that the loading barrier, pile driver more cattle I'd like to ask if the loader guardrail is practical? What is the daily piling efficiency? What's the fuel consumption? Please let me know when I've got the trouble. I'll try to buy one if I know the right thing.
And, as I have seen, ha, five loaders have been used for more than a year since the purchase. There has been no major failure. It may be luck. Arguably, domestic engineering equipment should not be so used.I suggest, if you small quantities or steadfastly practical cost 260, the large quantity you can choose the loading type guardrail piling machine try very energeti.
Q: How many hours will it take for the 200 piles and the 1 pile drivers?
200 piles of 1 piling machine is generally need 19 day time is finished, also need 152 hours to complete.
Q: What are the types of pile drivers?
According to the structural form of diesel hammer rod and cylinder type separation.Hydraulic hammer pile driverThe utility model is a diesel belt starting, with the hydraulic pressure as the power, and can adjust the hydraulic pressure according to the different stratum soil, so as to achieve the appropriate impact force for piling, and is a new type of pile driver. Small and medium-sized hydraulic pile driver, commonly used in highway guardrail piling, highway guardrail construction.Screw pile driverSpiral pile driver (Spiral hammers) is a power driven drill head drill bit into the underground drilling machine drilling equipment. The spiral pile driver can be divided into two parts: the pile foundation and the drilling part.
Q: How many tons of pile drivers are used to hit 400X400 square piles?
Usually with 6.3 ton or 8.3 tons of guide rod, diesel hammer will be able to hit. The static pile machine is not clear.
Q: How do you pile it?According to different pile, talk about some details
There are many kinds of piling methods, and different pile drivers are chosen according to different waysIt is better to use a diesel hammer, a pile driver, or an immersed pipe filling pile on a beachThe pile can be operated or tracked
Q: Do you have a teacher with you?. I am 32 years old this year. I really want to learn this kind of machine
I just open this, there is a certain risk, high wages, the site can not enter the work, it does not enter
Q: Do you make money on building pile drivers? How long will it take to recover the cost?
To be honest, no money, no problem, it's hard to have a client.My father worked as an electrician at the construction site for three years. I just asked him.Of course, you have connections, and you won't do it.The most crucial thing is the network, there is a market, that thing good, tens of millions, smashing hands, crying dead.Sure, you have connections, when I don't say..

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

Hot products


Hot Searches

Related keywords