• yuchai YC260R Rotary drilling rig. System 1
yuchai YC260R Rotary drilling rig.

yuchai YC260R Rotary drilling rig.

Ref Price:
get latest price
Loading Port:
China Main Port
Payment Terms:
TT OR LC
Min Order Qty:
-
Supply Capability:
-

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

yuchai YC260R Rotary drilling rig

Technical Specifications

Item

Parameters

Chassis

Engine Model

 

CUMMINS QSM11-C330

Rated Power/Speed

kW/rpm

246/2100

Outer Width of Crawler

mm

4400

Width of Crawler Plate

mm

800

Hauling Force

kN

520

Power Head

Maximum Torque

kN·m

260

Speed

r/min

6-26

Maximum Pressure

kN

200

Maximum Pulling Force

kN

250

Pressurized Cylinder Stroke

mm

5000

Hoist

Main Hoist

 

 

First Layer of Lifting Force

kN

280

Maximum Lifting Speed

m/min

55

Diameter of Wirerope

mm

Φ32

Auxiliary Hoist

 

 

First Layer of Lifting Force

kN

80

Maximum Lifting Speed

m/min

65

Diameter of Wirerope

mm

Φ20

Mast

Rake Angle

°

5

Left/Right Tilt Angle

°

±4

Hydraulic Pump

Maximum Pressure

Mpa

35

Hole Depth

Hole Diameter

Maximum Drilling

mm

2500

Maximum Drilling Depth

m

80

Drill Pipe

Drilling Pipe

mm

Φ508

Working Weight

t

82

Keywords:rotary drilling dig,yuchai rotary drilling dig,weichai rotary drilling rig,weichai,chinese rotary drilling rig


Q:What machinery is used for piling?
In fact, in some places with artificial, you can go to buy a wylong machinery piling machine equipment is good, driving fast and convenient and money
Q:But in a few days, wait for the water to ease up, and plug it directly with earth rockIs there no way directly to seal the breach?
The width of 340 meters, so excited water, so a wide breach, the water is so deep, the boat stopped, so how long pile up? Where is the man standing? People have no place to stand. How can the pile driver be put into the wooden pile? Under such circumstances, even if there is a pile driver, what's the use? This is the changkai dike breach after there are no reasons for piling piling machine.Answer to your supplementary question:Closure of crevasse is a system engineering, it should include: pile, piling machine, operating platform, platform connection between the anchor pile, etc.. Not only one or two of them can be done.The following is the Liyang Ding Ding Mini piling equipment factory produced dragon dragon brand dam information, hoping to help answer your questions, if you do not see clearly, you can click on the map to see the original picture.First, dragon Ding card dam mapSorry, I'm only level one now. I can't upload pictures. If necessary, go to the website of the new tripod piling equipment factory in LiyangTwo, the Dragon Dingpai dam burst when the working drawing of pluggingThree, dragon card blocking effect after the burst dam closure graphWhen all of the pile are good, can seal the 90% water, finally burst all filled with debris, if there is enough manpower, also can be in front of the pile at the same time, immediately behind the embankment filling. Crevasse sealing is completed, will pull out all the repeated use of pile.
Q:I have learned how to drive a pile driver. I want to know what the salary is. How can I find a job in the future?
I drive a pile driver. What kind of pile driver do you learn?
Q:How many prestressed concrete pipe piles can a pile driver hit in a day?
In general, it takes about half an hour for 18M's prestressed pipe pile to enter the soil. One day, you can use the time to do it
Q:I have two pile drivers, followed by engineering piling, what qualifications do you need?
Hang on it, for qualification trouble. You can contact me if you need to buy piling equipment.
Q:What is the maximum CPU of a pile driver? What about the performance of graphics will be piling machine CPU?
AMD pile driver FX8350 performance similar to 640 graphics cardsAMD's new series, CPU, has a core code called Bulldozer, and the Chinese translation is bulldozer.
Q:I heard that the operation of the pile driver can make about ten thousand a month, is it possible? It sounds a bit dodgy. Who knows about this job? Please tell me how much you can make it for a month
Generally similar, but if the site is more, then more than this money
Q:With the hd62 hammer machine, the last three strikes are 10 strikes, and the control is within 5 centimeters. Is that the height of the hammer fall?
Depends on what pile you're playing. How big is it?. High strength prestressed pipe pile is about 300 if the drop is 1.8-2.0 meters, hammering 2CM (can slightly relax, because 62 300 large heavy hammer hammer); high strength prestressed pipe pile is about 400-600 if the drop is 1.8-2.0 meters, hammering 2CM.
Q:A screw driver pile diameter 400mm depth of not less than 12 meters, 24 hours a day non-stop, how much can be hit?
A screw driver pile diameter 400mm depth of not less than 12 meters, 24 hours a day non-stop, how much can be hit?
Q:Why is AMD's CPU name a pile driver or something?
Just like before the Sempron, Athlon, Duron, pterosaur, AMD CPU style is quite interesting.

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

Hot products


Hot Searches

Related keywords