CMAX SWDH89A Full Hydraulic Open-pit Drill for Sale on Okorder
- Loading Port:
- Shanghai
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 1 unit
- Supply Capability:
- 1000 unit/month
OKorder Service Pledge
OKorder Financial Service
You Might Also Like
CMAX SWDH89A Full Hydraulic Open-pit Drill for Sale on Okorder
SWDH89A full hydraulic open-pit drill carriage is designed according to the operating conditions of small-medium size quarries and small open pit mines. The drill hole diameter ranges from Φ76 to Φ102mm and the maximum hole depth is 20m. It can be used in quarry, civil engineering, road engineering, open pit mines and hydropower station construction as well as other rock blasting and drilling works. It is mainly used for drilling hard and above medium hard rocks and has strong climbing ability and flexibility. It can carry out drilling operation in complex terrain. And it is low energy consumption with high drilling rate.
MAIN DATA | UNIT | SWDH89A |
---|---|---|
OPERATION PARAMETER | ||
Hole range | mm | 89~115 |
Drill rod diameter | mm | T45、T51 |
Drill rod length | m | 3.66m×6 |
Hole depth, max | m | 20 |
AIR COMPRESSOR | ||
Model | CF128R | |
Working pressure | MPa | 0.8 |
Free air delivery | m³/min | 8.3 |
ENGINE | ||
Model | QSB6.7-C220 | |
Power/Speed | kW/rpm | 164/2200 |
Fuel tank capacity | L | 350 |
FEED | ||
Length of drillrig | mm | 8000 |
Feed length | mm | 5000 |
Feed extension | mm | 1200 |
Pitch angle | ° | 140 |
Overturn Angle | ° | -20~+90 |
Feed rate, max | m/s | 0.8 |
Feed force | kN | 25 |
BOOM | ||
Boom length, total | mm | 2800 |
Lifting angle | ° | +45~-30 |
Swing angle | ° | 15(L)~55(R) |
TRAVELLING | ||
Travel speed | km/h | 3.5/2.0 |
Traction force, max | kN | 100 |
Hill climbing ability | ° | 25 |
Track oscillation | ° | ±10 |
Ground clearance | mm | 400 |
HYDRAULIC ROCK DRILL | ||
Model | DF600S | |
Impact power | kW | 20 |
Rotary torque | rpm | 1000 |
Rotary speed | N.m | 90~180 |
DIAMENSION | ||
Gross weight | t | 15 |
Transportation state( L×W×H) | m | 11×2.92×3.35 |
Working state(L×W×H) | m | 8.4×2.92×9.15 |
Advantages
1 sincere
CNBM International is a state company, now is one of the largest state-owned group cooperation in China! All the outdoor heaters produced by CNBM are compliant with the national level quality.
2 professional
Our engineers will at your services 24hours to answer your questions. Our goal is to provide the best professional services.
3 quality
CNBM International’s outdoor heater have strict quality control, only the best quality products can pass the test.
4speed
We have professional sales team to guarantee your reply within 12hours to save your precious time.
5 After sales
If the tower crane has any problems, we will solve your problems in first time.
FAQ
1.Which payment terms can we accept?
Normally we can work on T/T term or L/C.If you choose T/T,30% payment is required in advance and 70% balance shall be settled before shipment often,it rang a little.
2.How long will our price be valid?
We are friendly dealer, never greedy windfall profit, our price remains stable,except the exchange rate and the increasing labor cost and material cost.
3.What are our advantages compared with manufacturers?
a.Detailed training-We can provide training services to different users. The training sessions include product training,operating training, maintenance know-how,standard and so on to fulfill your individual needs.The training can be conducted at client’s site.
b.Available after service-With our global distributor network, you are guaranteed with fast deliveries and services if you submit your requests.
Company Information
China National Building Materials Group Corporation is the full name of CNBM, which is one of the largest state-owned group in China. In 2013, the total asset of CNBM exceeds US$60 billion dollars with a total staff of 180,000. CNBM is listed in the World Top 500 Enterprises!
CNBM International works as the international platform for CNBM Group. In 2013, our total sales income was more than US$16.8 billion dollars.Every year we import large quantity of iron ore, coking coal and thermal coal etc from India, Brazil, Australia and Russia and other countries.ld'>Our major responsibility is international marketing of different construction machinery & formwork, including lifting machinery, concrete machinery, earthmoving machinery, brick/block machinery; steel frame formwork, H20 timber beam formwork, aluminum formwork etc.
Our major responsibility is international marketing of different construction machinery & formwork, including lifting machinery, concrete machinery, earthmoving machinery, brick/block machinery; steel frame formwork, H20 timber beam formwork, aluminum formwork etc.
- Q: Which price is low for a pile driver?
- Specializing in sales of steel sheet pile, steel sheet pile construction, leasing, model complete, high quality, the construction of steel sheet pile, the price is more favorable, and exquisite design, honest and trustworthy business purposes, in full accordance with the market-oriented, large-scale, standardized operation requirements specification, through the implementation of brand strategy to build the core competitiveness of enterprises
- Q: The working principle of a pile driver ship
- The piling ship is equipped with a pile hammer, a pile stand, and auxiliary equipment.
- Q: How to use the pile driver?You're right. Contact 18961845125 before you know.
- Installation operation procedure editorFirst, piling machine operators must be familiar with the structure of the machine, performance, operation essentials and safety precautions, after passing the test and obtain a certificate, you can operate alone.Two, operators must concentrate on the operation. Do not talk, laugh, play or make trouble with unrelated persons. No smoking or food is allowed during the operation.Three, strictly abide by the relevant provisions of the maintenance of pile drivers, conscientiously do all levels of maintenance, to ensure that pile drivers are often in good condition. And pay attention to the rational use, correct operation.Four, the pile driver in the work should be prepared for the following:1, to the construction staff understand the construction conditions and tasks, and construction problems found in this class should pay attention to matters.
- Q: What about the engine power of a hydraulic pile driver?
- The utility model has the advantages of stable performance and reliable use, and can be used for self loading, self unloading and moving transition. During transportation, the upper section of the main frame can be retracted and folded, thereby saving a great deal of expenses and troubles in lifting and dismounting.
- Q: Should the starting current be considered when the piling machine is in use?
- There are two main types of pile driver used at present: diesel hammer pile driver and long spiral drilling rig. Xuzhou sea GREE is specialized in piling machine manufacturing enterprises, usually some friends ask some questions about the use of pile driver, today, the sea GREE will tell you about. The following is a friend of the sea GREE encountered a question. Q: a 15KW long spiral three ring power head, the starting current is about how big, I want to plan the temporary use of electricity on the site, I do not know a temporary construction of 60000 square meters of plant, how much electricity KW? Answer: in general, long spiral ring power head motor starting current depends on the specific circumstances, if the full voltage starting with load, the starting current is 5-7 times the rated current of the power supply. The construction of their equipment. In addition to see how much power head in the face of tricyclic sticking case, two start if beyond the rated current it is easy to burn the motor, after all, a power head is not cheap, suggest you consider all hydraulic power head, the power head is three was a bit expensive, but in the face of the card when drilling, two times can start easily and smoothly, the impact of the power grid is very small. Moreover, the torque of the hydraulic power head is 2-3 times as much as that of the ordinary three ring power head. It is more suitable for complex formation than the traditional long spiral, and the construction efficiency is more efficient. Long spiral drill in the type piling machine is the use of a more extensive, and for starting current understanding, we can get better in the construction layout, so as to avoid the occurrence of the voltage is not enough at the time of construction.
- Q: How many kinds of pile driver are there?
- The cylinder type diesel hammer takes the cylinder as the hammer seat and directly uses the lengthened cylinder to guide the inner wall. The two guiding rods are omitted, and the plunger is a hammer head, which can move up and down in the cylinder. When piling, the pile cap at the bottom of the hammer block is pressed on the top of the pile, lifting the plunger with a hook, and then decoupling and downward impacting to compress the air enclosed in the cylinder. And fuel injection, explosion, shock, ventilation and other work processes. Diesel hammer work is on compression ignition diesel to start, it is necessary to ensure the closed gas cylinder reaches a certain compression ratio, sometimes piling in soft soil layer is often because the reaction is too small, the amount of compression is not sufficient to ignite the ignition, it needs to use the hook to lift a hammer from multiple impact, to start. The hammer seat of the diesel hammer is provided with a fuel injection pump, an oil tank, a cooling water tank and a pile cap. The movable gap between the plunger and the cylinder is sealed with an elastic plunger ring. Four, hydraulic hammer piling machine is a diesel belt start, to the oil pressure as the driving force, can be adjusted according to the formation of different soil pressure, in order to achieve the appropriate impact force for piling, is a new type of pile driver. Small and medium-sized hydraulic pile driver, commonly used in highway guardrail piling, highway guardrail construction. Similar pile driving equipment are: hydraulic pile driver, road pile driver, guardrail, pile driver, road drilling machine.
- Q: Why do some people need to dig the foundation and pile it up to dig a hole?
- First of all, depends on the type of your pile, prefabricated or bored pile.If it is a bored pile, then it is obvious to dig first.If it is a prefabricated pile, then pile it directly, then dig it.
- Q: What machinery is suitable for a PV pile driver?
- you can use the north Yi Machinery BY-YH250 model of small hammer piling machine, installed on excavators.
- Q: What pile driving machine should be used for the 400*400 square pile?
- When in operation, the pile hanging in place pile frame in Longmen, then put the diesel hammer at the top of the pile, the hook will lift down the cylinder, and the cylinder sleeve off hook to the whereabouts of the piston, the cylinder will be closed in the air compression cylinder rocker pin until the pressure continues to fall outside the cylinder pushing hammer on the base of the fuel pump, fuel pump will be injected into the cylinder oil mist, oil mist meet high temperature gas burning immediately above, blasting, explosive shock down pile., to push the cylinder to cylinder to rise, fall along the guide rod, and the beginning of the second impact cycle.
- Q: Which brand is better for a small pile driver?
- the configuration of the machine and customer service service, selective highest bid is the best policy, piling machine personal feeling of Shandong Lida Company can, the landlord statements of a school for reference!!
Send your message to us
CMAX SWDH89A Full Hydraulic Open-pit Drill for Sale on Okorder
- Loading Port:
- Shanghai
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 1 unit
- Supply Capability:
- 1000 unit/month
OKorder Service Pledge
OKorder Financial Service
Similar products
Hot products
Hot Searches
Related keywords