CMAX Rotary drilling rig for Sale on OKORDER
- Loading Port:
- Shanghai
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 1000 unit
- Supply Capability:
- 1000 unit/month
OKorder Service Pledge
OKorder Financial Service
You Might Also Like
A solution to problems with cast-in-place pile construction of 400~600m housing construction
![]() | Easier transportation, lower cost and higher efficiency |
![]() | High stability and anti-tipping capacity Arranging the main and auxiliary winches at the lower end lowers the center of gravity of the drilling machine during operation and transportation, and improves the stability of the complete machine. The steel wire rope is used to hoist the drilling stem and drilling rigs directly through the goose head pulley. This can prolong the service life of the steel wire rope. |
![]() | Compact, flexible and highly maneuverable Compact machine body ensures a satisfactory passage capacity and can accommodate pile pore construction in narrow space. It is a truly buster at the construction site. |
Stable and reliable
![]() | Special chassis The self-made special hydraulic flexible chassis structure suitable for the actual load is adopted. Meanwhile, the main and auxiliary winches are installed on the rotating platform, which remarkably reduces the tipping load and guarantees the stability of the complete machine fundamentally. The position of the gravity center of the complete machine is optimized, with the stability angle increased from 10° to 15°. This guarantees operation stability on all dimensions of 360°. |
![]() | Square-shaft casing structure The box type square shaft casing structure is used for the mast deflection seat. The force of mast is directly transferred onto the trolley traveling mechanism, thus eliminating the stress of the rotary frilling force on weak links of the deflection seat and improving the structural stability and reliability. |
![]() | Mast structure The high-strength anti-deform design is used for the drilling stem. The rectangular mast section is even wider on the guide rail direction. This can effectively reduce the structural stress of the mast and make it more suitable for the in-rock construction conditions with high-strength variable and constant load. |
![]() | Winch The main and auxiliary winches are installed on the platform, which greatly reduces the tipping torque of the operation device and the revolving inertia of the upper part of the platform and improves the stability of the complete machine. |
![]() | Auxiliary landing leg The standing leg hidden below the lower mast can not only act as the auxiliary support for drilling construction, but can also help you with other unimaginable matters. |
High-grade configuration ensures high efficiency
The efficient and reliable engine is equipped with efficiency hydraulic transmission system, and this guarantees the strong power of the machine. The advance intelligent electronic control system can give full play to the efficiency of the machine. Meanwhile, the reasonable local structural design noticeably reduces the wearable and consumable.
![]() | Complete machine system The engine of world-well-known brand is equipped with high-efficiency hydraulic transmission system. The advanced intelligent electronic control system can give full play to the efficiency of the machine. The complete machine system boasts advantages such as high reliability, fuel economy and high reserve power. The engine emission meets the European EPAC3 standard, which means the engine is environmental friendly. In addition, it can operate regularly even in alpine and high-altitude areas. |
![]() | Power head The compact machine has a large-torque power head and boasts high speed. This ensures high construction efficiency. |
Hydraulic elements
The hydraulic system has been developed in joint efforts with a world first-class element manufacture to improve the hydraulic energy conversion rate of the element and reduce the transmission loss of pipelines of the system.
Model | Unit | SWDM04 | ||
---|---|---|---|---|
Machine Height | m | 8.79 | ||
Machine Weight | t | 16 | ||
Max. Drilling Diameter | Drill Bucket Method | mm | 900 | |
Max. Drilling Depth | m | 23 | ||
Engine | Brand | Perkins | ||
Model | 1104-44T | |||
Rated power | kW/rpm | 74.5/2200 | ||
Hydraulic System | Max.working pressure | Main pump | MPa | 34.3 |
Auxiliary pump | MPa | / | ||
Max.oil flow rate | Main pump | L/min | 2×110 | |
Auxiliary pump | L/min | / | ||
Rotary Head | Max. torque | kN.m | 40.8 | |
Rev | rpm | 6~54 | ||
in-off speed | rpm | / | ||
Crowd System | Max. crowd push | kN | 60 | |
Max. crowd pull | kN | 70 | ||
Max. stroke | mm | 1500 | ||
Main Winch | Max. crowd pull | kN | 60 | |
Max. line speed | m/min | 66 | ||
Auxiliary Winch | Max. crowd pull | kN | 15 | |
Max. line speed | m/min | 50 | ||
Mast Inclination | Left and Right tilt | ° | ±3 | |
Forward tilt | ° | 5 | ||
Undercarriage | Max. travel speed | km/h | 3 | |
Max. grade ability | ° | 20 | ||
Overall width of crawle | mm | 500 | ||
Extendable crawler width | mm | 2420 | ||
Width of track shoes | mm | 3415 | ||
Grounding pressure | kPa | 59.6 |
Advantages
1 sincere
CNBM International is a state company, now is one of the largest state-owned group cooperation in China! All the outdoor heaters produced by CNBM are compliant with the national level quality.
2 professional
Our engineers will at your services 24hours to answer your questions. Our goal is to provide the best professional services.
3 quality
CNBM International’s outdoor heater have strict quality control, only the best quality products can pass the test.
4speed
We have professional sales team to guarantee your reply within 12hours to save your precious time.
5 After sales
If the tower crane has any problems, we will solve your problems in first time.
Others
1.Reply your inquiry in 24 working hours.
2.Experienced staffs answer all your questions in professional and fluent English.
3.Customized design is available. OEM is welcome.
4.Exclusive and unique solution can be provided to our customer by well-trained and professional engineers and staffs.
5.Special discount and protection of sales area provided to your distributor.
6.Do the best reliable heavy-duty single drum vibratory road roller in China.
7.Warranty period is 1-year or 1500 working hours against Bill of Lading.
Company Information
China National Building Materials Group Corporation is the full name of CNBM, which is one of the largest state-owned group in China. In 2013, the total asset of CNBM exceeds US$60 billion dollars with a total staff of 180,000. CNBM is listed in the World Top 500 Enterprises!
CNBM International works as the international platform for CNBM Group. In 2013, our total sales income was more than US$16.8 billion dollars.Every year we import large quantity of iron ore, coking coal and thermal coal etc from India, Brazil, Australia and Russia and other countries.ld'>Our major responsibility is international marketing of different construction machinery & formwork, including lifting machinery, concrete machinery, earthmoving machinery, brick/block machinery; steel frame formwork, H20 timber beam formwork, aluminum formwork etc.
Our major responsibility is international marketing of different construction machinery & formwork, including lifting machinery, concrete machinery, earthmoving machinery, brick/block machinery; steel frame formwork, H20 timber beam formwork, aluminum formwork etc.
FAQ
1.Which payment terms can we accept?
Normally we can work on T/T term or L/C.If you choose T/T,30% payment is required in advance and 70% balance shall be settled before shipment often,it rang a little.
2.How long will our price be valid?
We are friendly dealer, never greedy windfall profit, our price remains stable,except the exchange rate and the increasing labor cost and material cost.
3.What are our advantages compared with manufacturers?
a.Detailed training-We can provide training services to different users. The training sessions include product training,operating training, maintenance know-how,standard and so on to fulfill your individual needs.The training can be conducted at client’s site.
b.Available after service-With our global distributor network, you are guaranteed with fast deliveries and services if you submit your requests.
e. To provide customers with professional and technical services, to meet the demands of customers for construction efficiency and cost control, to achieve value for customers, which is the constant pursuit of Toppile, Toppile implant this concept in the whole process of sales and services.
Before sales
Research market with customers; provide technical advice, customized design and production.
f. On sales
Always communicate and adjust of design with customer to ensure the product satisfy all requirements.
After sales
Provide installation, adjustment, maintenance service, create customers files, following up machine working situation, provide customer a whole set of “Butler” and “Gapless”services.
g. Value added services
Redesign and upgrade the hydraulic system of piling machine, upgrade structure components.
Provide high quality and lower price components.
Toppile is the agent of many components factories, including cylinders, pumps, seals, hydraulic elements.
- Q: Piling machines need to how much money??
- Hello, this is not necessarily, because the configuration is not the same, so the charge is not the same!
- Q: The impact of drilling pile driver how much money
- See how big you want to play, I want to hit a big pile on your point
- Q: What kind of pile driver, rotary drilling machine can drill under medium weathering rock layer?
- The Xugong power head, wylong machinery mechanical lock rod rotary drilling rig Yuchai engine and can be weathered rock and sediment layer in the layer below, backfill soil drilling construction
- Q: What are the preparations for the piling site?
- 1, the pile position determination: according to the project provided by the construction unit and the pile axis location map of pile location, pile location must be accurate, and in the pile position by a soldering iron drilling, hole depth is 15~20cm, filled with lime, prevent in the process of driving the wrong pile.2. Pile up(1) pile stacking shall be determined by pile driving route and pile driving sequence(2) the site shall be level and level with three passes and one leveling. Remove obstacles in the ground, underground and air in the range of the moving of the pile driver. The wooden posts and the pile rings shall be of the same position, except for the contact between the pile and the pile, and nothing else shall be in contact with the pile so as to prevent cracks in the pile.(3) the strength of reinforced concrete precast piles must be up to 100% before they can be transported and piled3, the selection of pile machineAccording to the design of single pile bearing capacity and pile length, this project intends to use hammer weight 2.5t track type diesel pile driver.
- Q: How to realize the remote control of pile driver (machine)?
- Hello,Piling machine (Mechanical) are generally used for CAN-bus communication, similar to the traditional automobile communication scheme is using twisted pair as a communication medium,
- Q: How to maintain the pile driver daily?
- Daily maintenance of pile driver1 、 maintenance of each shift (after class, after class)(1) before the daily operation, the operator should clean the surface of the pile driver. Parts that need oiling must be lubricated 1-3 times a day to keep the lubricated parts lubricated. (2) remove dirt and dirt from the equipment. (3) check and fasten the connecting bolts of each department, check the lubrication and wear of main clutch, steering pump, fan bearing, high pressure oil pump, load wheel and idler pulley. If there are any problems, they should be dealt with in time.
- Q: Why do some people need to dig the foundation and pile it up to dig a hole?
- Digging foundation, piling and digging, piling are twoGenerally after the first pile driving, dig the foundation, you think, I pile is to pile machine back and forth, you dug the pit, how the machine down to pit how to walk, the foundation pit bearing capacity is not enough or the foundation pit is disturbed,
- Q: My home behind the plant in piling, the distance is about 25 meters, when piling not only hear the sound, even the house seems to be in the earthquake, how many distance from the house safe?
- We also met this kind of situation, homeowners simply forced the construction team construction method (modified by rotary drilling operation).
- Q: How many types of piles are there in the site? What procedures are usually used for piling? Such as eyes open what kind of..
- Precast pile, artificial dig hole pile, sinking pipe filling pile, spiral drilling pouring pile and powder spraying pile.
- Q: Clean the dirt and grease piling machine how much money
- The pile foundation is a steel structure tower with a windlass at the back of which is used to lift the pile and hammer. A guide frame consisting of two guide rods is used in front of the pile to control the direction of the pile driving so that the pile can be accurately penetrated into the formation in accordance with the design orientation.
Send your message to us
CMAX Rotary drilling rig for Sale on OKORDER
- Loading Port:
- Shanghai
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 1000 unit
- Supply Capability:
- 1000 unit/month
OKorder Service Pledge
OKorder Financial Service
Similar products
Hot products
Hot Searches
Related keywords