Access Panel For Ceiling Corrosion Proof
- Loading Port:
- Shanghai
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 500 pc
- Supply Capability:
- 500000 pc/month
OKorder Service Pledge
OKorder Financial Service
You Might Also Like
Description:
•The frame are high quality extruded aluminum sheet construction with advantages of corrosion resistance and rigidity.
•It consists out frame and inner frame. The inner frame is fixed to the out-frame by hinges on one side and by screw on the other side..with elephant nose lock. With gypsum board
•The frame can be easily open to allow for maximum flexibility in the installation, maintenance.
Construction:
•Inner frame: High quality extruded aluminum alloy(A6063).
•Out frame: High quality extruded aluminum alloy(A6063)
•With gypsum board
Attributes:
1.Easy and quick installation,fixing by screws or clips.
2.High-class quality, perfect design, light weight but strong bearing capacity,
3.Mildew resistant, does not change color,corrosion proof,long life,light weight, no weld, and low cost.
Description:
•The frame are high quality extruded aluminum sheet construction with advantages of corrosion resistance and rigidity.
•It consists out frame and inner frame. The inner frame is fixed to the out-frame by hinges on one side and by screw on the other side..with elephant nose lock. With gypsum board
•The frame can be easily open to allow for maximum flexibility in the installation, maintenance.
Surface Finish:
•Powder coated color finish as per RAL color---- standard color: RAL9016
Character
Easy and quick installation
Continuous one-piece frame with feathered edge
High-class quality, perfect design, light weight but strong bearing capacity, no rusting and keeping forms.
Mildew resistant.
FAQ
1. Is OEM available?
Re: Yes, OEM service is available.
2. Are you factory?
Re: Yes. we are the largest factory in China.
3. Can we get sample?
Re: Yes, sample is free for our customer.
4. How many days for production
Re: usually 2 weeks after receiving of downpayment
Picture
- Q: Whether it is possible to take a new root
- This is the framework of the structure of the wall filled with the window frame quite a 'structural column', different from the masonry structure of the seismic structure of the structural column must be up and down the pass, this 'structural column' can be used to install the bar or reserved Tendons and other methods of timely rooting.
- Q: How to construct the outdoor rock wool insulation board
- Adhesive mortar point sticky or full of sticky, and then insulation nails fixed, or slotted with T-card fixed pad sealant.
- Q: Bathroom, washbasin (door) face paste mosaic, what is the material is better plate? What is the construction process? More
- Washing table (cabinet door) face mosaic, had to use woodworking board to do the base layer because it is necessary to always open, if not open, then available cement pressure board hanging plaster stickers mosaic.
- Q: Plastic window is not also called plastic doors and windows, how to explain is a kind
- Plastic doors and windows are made of polyvinyl chloride (PVC) resin as the main raw material, plus a certain proportion of stabilizers, colorants, fillers, UV absorbers, etc., by extrusion, and then by cutting, welding or screw Made of doors and windows frame fan, equipped with sealing tape, tops, hardware, etc., at the same time to enhance the rigidity of the profile, more than a certain length of the cavity needs to fill the steel lining (stiffeners), through the doors and windows made Called steel doors and windows steel is relatively popular and nice to say, in fact, is the strength and flame resistance of relatively high plastic
- Q: Broken bridge aluminum screens how to go up
- There is a hand drill, to fix the screw 1
- Q: EPS line is good or GRC line is good? Villa facade, doors and windows frame.
- I am doing GRC from the time that GRC is the time from the test of the EPS light but time long material stability do not know how
- Q: Just do not understand the information, please take care of the older generation, and then this Xianxie! More
- Sub-box, lightning protection, waterproof, the main frame and the sub-frame connected to the screws, these are hidden, to cover the acceptance records, the rest do not need to attach the form, the main frame is installed, with inspection batch form, glass ibid.
- Q: How to count the amount of window works
- 1, the drawings will have windows and doors table, according to the plan and the number of doors and windows window number of doors and windows. Sometimes, the number of doors and windows table is not correct. 2, check the doors and windows of the door and window size calculation door and window frame of the external dimensions in square meters. 3, each side minus 15mm on each side, for example: 1200 * 1000 window calculation: (1200-15 * 2) * (1000-15 * 2) =; 900 * 2400 of the door calculation: (900-15 * 2) * (2400-15 * 1) =
- Q: Rough room provided by the heat of the aluminum alloy doors and windows frame color is dark green, hoping to change to white or black. Do not know what method can be achieved? 1, paint? Will it fall off? 2, see someone online that can change the color foil, do not know what kind of film? More
- You can change the color of the film, but before the installation can be made, or only paint.
- Q: Rough leveling how to use?
- Before the construction should measure the wall to determine the thickness of the wall leveling layer, if the wall flatness is very good, you can reduce the leveling layer thickness, do not have to worry about whether the material can meet the strength, because the Pratt thick rough construction thickness from 5mm To 50mm are suitable. Determine the thickness of the leveling layer should be in the wall for the elevation of the line, the spacing between each tendons in the 1.2-1.5m or so, according to the experience of construction workers to determine the vertical arrangement of tendons from the corner position in turn arranged. Prades without formaldehyde rough leveling is a one-component powder products, according to the requirements of the amount of water (about 45%) can be used evenly stirred. Base surface requirements solid clean without powder, no sand, no peeling, surface attached debris, oil should be clear, the hole should be filled in advance. Check whether the doors and windows frame is securely connected and fill the gap between the door frame and the wall with a good "paste". Adjust the "slurry" should be within 30 minutes on the wall, in the grassroots first thin scraping again, the purpose is to make the material and the grass-roots contact between the full. And then approved on the wall enough to adjust the "slurry" with a 2m long by a one-time scratch can be. Indoor pillars, the location of the wall angle should be increased Prades Corner, the height of not less than 2m.
Send your message to us
Access Panel For Ceiling Corrosion Proof
- Loading Port:
- Shanghai
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 500 pc
- Supply Capability:
- 500000 pc/month
OKorder Service Pledge
OKorder Financial Service
Similar products
Hot products
Hot Searches
Related keywords