aluminum sliding door windows
- Loading Port:
- China Main Port
- Payment Terms:
- TT OR LC
- Min Order Qty:
- -
- Supply Capability:
- -
OKorder Service Pledge
OKorder Financial Service
You Might Also Like
aluminum sliding door windows model in house
Product description:
1
Good Air Tightness,Water-Proof,Sound Insulation ,Thermal Insulation,Anti-aging Etc.
Easy to Clean and Maintain, Durable and Strong
Environmental Protection Elegant Appearance .Varies Color for Option
Opening Type:Casement, Sliding, Floding, tilt-turn,tilt-sliding,ect
European standard tank system design, , Beautiful and delicate
sealing property: Multi-point lock structure with two sealed effectively guarantee the air tightness and water tightness
Unique way of composite profile wind resistance and earthquake resistance stronger
Can use single or double open, diverse styles, design and easy grace, Door plank and the combination of laminated glass can effectively as outdoor use, anti-theft performance is superior
ProductsName | HongTai aluminum casement / sliding window and door aluminum window and door |
Main material | aluminium alloy +glass +hardware |
Profile | 1 Construction: Thermal Break or Non-Thermal Break,Automatic or Manual 2 Thickness: 1.2-2.5mm, usually 1.2-2.0mm thick for windows,1.6-2.5mm thick for doors |
Glass | 1 Type:Tempered glazing, Laminated Glass LOW-E Glass Hollow Glass etc. 2 Thickness:Single 6mm, Double 5/6/6F+6A/9A+5 etc |
Hardware | High quantity made in China/ Germany/our standard hardware use Germany Siegenia and Noto brand . Customers' stipulated brands are available. |
Frame thickness | 50-150mm |
Applicable place | Schools, Restaurants, Commercial Buildings and Government Buildings,Family,sunroom bathroom,ETC. |
- Q: The installation method of color steel activity room
- What kind of structure to look at the drawings to say
- Q: My house is not yet in the house, but now in the decoration stage, but found the north of the bedroom windows (plastic windows) on both sides and both sides of the phenomenon of rainwater (rain 2 days or so there is water), developers have worked once but did not improve , Now looking for him to repair, but also an excuse for rainy day construction has been dragging, worried that I brush a good wall paint repair, affecting the decoration, so I want to repair their first solution. I do not know how to repair it? Thank you. : Figure more
- I see your picture, I see the external walls of water leakage, the windows are generally in the window below the water, your upper and sides, as well as the left side of the window so far, there are leaking, should be the wall leakage, I suggest you Buy waterproof treasure (liquid) on the outside brush 2 - 3 times, the window on the four sides made waterproof plastic, can only be the case
- Q: Paving mosaic construction process
- Double gull nostalgic mosaic can be used for indoor and outdoor floor and wall decoration. For construction paving, the most critical job is to prepare the surface of the site. Tiles must be in the horizontal and vertical angle are accurate and accurate paving, so as to avoid problems. Paving the surface must be clean and dry. Paving materials: the market has a professional mosaic tile adhesive and sealing agent, there are two-in-one tile glue. Color is also a variety of points, according to different needs with the use of cement and sealant. The most widely used is white and black. Paving tools: grouting floating, large bucket, V-shovel, hammer, small bucket, pliers. Paving steps: 1. In the vat inside the mixed powder-like mosaic tile glue, stirring at the same time by adding water until peanut butter to achieve similar viscosity. 2. In the construction of the wall, then use the v-type shovel. Each post a paste From the middle of the patch area to start paving out. In the wall with the horizontal line and the vertical line for the mark, you can make the gap between each paste evenly. Hand the appropriate force to the mosaic into the tiles inside, so that mosaic and ceramic tile full contact. 3. Paste finished or close the mosaic, you need to paste a paste on the match mosaic. With a piece of wood and a hammer, gently tapping to adjust the position of the mosaic. Need to pay special attention to the edge and connection of each mosaic. 4. If necessary, adjust the mosaic position in time before the mud is dry. 5. Allow the mud to have a 24 hour posture before filling. 6. Dry the sealant for 10-20 minutes, then gently wipe the mosaic surface with a piece of wet sponge. 7. Finally, wipe with a piece of lint-free cloth out of the mosaic surface of the remaining cement and caulking agent.
- Q: What are the key points for the production and installation of wooden doors and windows?
- It depends on what you use the wood.
- Q: Can ordinary sliding windows be installed with stealth screens?
- There is no problem with the technology, can be installed; the problem is to be installed in the window outside, that is, the top of a window outside the top, after the end of the window can not be moved, the sealing effect is no problem, but the biggest drawback is paint Glass when the inconvenient, the inside of a window can not be completely applied to; you can choose "Lu Cheng" brand can be demolition cleaning, or with the flat;
- Q: EPS line is good or GRC line is good? Villa facade, doors and windows frame.
- If it is a private villa that I am responsible to tell you GRC better than the EPS on the grounds that: GRC is made of high-strength cement, glass fiber, steel, sand and sand can be the same life and housing, and EPS is a grid , Interface agent, made of foam, which is a bubble, the outside is a cement slurry. Both grades are not the same.
- Q: What are the problems with the installation of windows?
- Wall plaster and hole whether there is a gap?
- Q: Do you want to eat the windows and doors?
- Door and window out of the plaster is to eat a little window frame, probably the principle is: the wall plastering door frame 5 mm or so, elegant approach should be silicone edge (where you are rough delivery). Wiping the surface of the laminated window frame is not greater than 1 cm, pay attention to the edge of the silicone must be, here is the weak water seepage.
- Q: Now the general situation of the site is: the floor is the floor tile floor, doors and windows are wooden doors and windows, plaster has been in the door window when the mouth of the box and other boxes installed after the mouth. Down, do not know how to run well, mainly the door frame of the problem. Now is the first installation of doors and windows box and then shop tiles, or the first floor tiles and then install the door frame? If it is the latter, or do not keep the door of the floor tiles, such as the door frame after the installation, after the package? The first dry this, stuck here, the teachers to help, how to do down What experience to tell the little brother, not Sheng grateful. More
- First lay the floor and then install the sliding glass door or room door
- Q: Engineering materials inside the windows and doors hidden when to do? Is done in the main construction, or do the decoration when the doors and windows to do the decoration?
- Is the main body after the end of the construction to do, after the main body, according to the actual situation of the project, generally at the same time outside the wall, interior walls, ceiling painting, while the installation of doors and windows, and then floor, and then the interior wall and ceiling paint , Wood partition, door and window fan installation, construction generally from top to bottom.
Send your message to us
aluminum sliding door windows
- Loading Port:
- China Main Port
- Payment Terms:
- TT OR LC
- Min Order Qty:
- -
- Supply Capability:
- -
OKorder Service Pledge
OKorder Financial Service
Similar products
Hot products
Hot Searches
Related keywords