• Access Panel For Ceiling High-Class Quality System 1
  • Access Panel For Ceiling High-Class Quality System 2
Access Panel For Ceiling High-Class Quality

Access Panel For Ceiling High-Class Quality

Ref Price:
get latest price
Loading Port:
Shanghai
Payment Terms:
TT OR LC
Min Order Qty:
500 pc
Supply Capability:
500000 pc/month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

Construction:
•Inner frame: High quality extruded aluminum alloy(A6063).
•Out frame: High quality extruded aluminum alloy(A6063)
•With gypsum board

 

Attributes:

 1.Easy and quick installation,fixing by screws or clips.

 2.High-class quality, perfect design, light weight but strong bearing capacity,

 3.Mildew resistant, does not change color,corrosion proof,long life,light weight, no weld, and low cost.

 

Description:
•The frame are high quality extruded aluminum sheet construction with advantages of corrosion resistance and rigidity.
•It consists out frame and inner frame. The inner frame is fixed to the out-frame by hinges on one side and by screw on the other side..with elephant nose lock. With gypsum board
•The frame can be easily open to allow for maximum flexibility in the installation, maintenance.

 

Surface Finish:
•Powder coated color finish as per RAL color---- standard color: RAL9016

 

Character

Easy and quick installation
Continuous one-piece frame with feathered edge
High-class quality, perfect design, light weight but strong bearing capacity, no rusting and keeping forms.
Mildew resistant.

 

FAQ

1. Is OEM available?

Re: Yes, OEM service is available.

2. Are you factory?

Re: Yes. we are the largest factory in China.

3. Can we get sample?

Re: Yes, sample is free for our customer.

4. How many days for production

Re: usually 2 weeks after receiving of downpayment

Picture

Access Panel For Ceiling High-Class Quality

Access Panel For Ceiling High-Class Quality

 

Q:Construction technology to pay how to write ah? Best to give a text, thank you
The format shall be in accordance with the provisions of the local administrative department of construction
Q:What are the key points for the production and installation of wooden doors and windows?
It depends on what you use the wood.
Q:How to construct the outdoor rock wool insulation board
Garbage product waste system, early stop production
Q:Plastering and doors and windows installed in the order
Before plastering, you should (at least) install the doors and windows in place so that the mason can paint the walls (holes) around the doors and windows at the same time. This is the basic step in the construction.
Q:Do you have the order to install the floor and window? What order is it right?
This is not the absolute order of the two, mainly to see their own preferences it
Q:Now the management of the project in a problem, the construction of the project is to rough housing delivery to the owners, then off the bridge aluminum doors and windows need to be installed in place, then broken bridge aluminum door frame how to deal with the lower part? Is reserved in accordance with the provisions of the provisions of 5-8mm? Or first consider the owner of the renovation of about 4cm and then increase 5-8mm? Early completion of the project is in accordance with the provisions of the provisions of 5-8mm reserved for the construction, the owner of the door after the renovation of the decoration of the ground less than the ground, causing the rainy season to the indoor overflow. If you choose to increase the decoration space 4cm or so to increase 5-8mm construction, the lower part of how to deal with? More
Broken bridge aluminum door window frame how to deal with: a large number of doors and windows before installation, should first install the sample doors and windows, after passing the acceptance, before a large number of installed. For the same type of doors and windows and their adjacent upper, lower, left and right openings should be kept line, the hole should be horizontal and vertical. Doors and windows should be placed in a clean, flat place, and to avoid sun and rain, and shall not be in contact with the corrosive; doors and windows shall not be directly touch the ground, the lower part of the placement of wood should be placed, and should be placed, vertical angle should not be less than 70 degrees , And should take anti-dumping measures. Should be measured in the middle of the window, and one by one to make a mark, multi-storey building, from a high-level hanging; installation window frame should be aligned with the center line.
Q:I would like to ask the doors and windows to install the master, the frame installed after the glue is good, or wait until the next glass together with plastic?
Box installed after filling the expansion agent, there is no gap can not fight, with the latter loaded a glass of money relationship is not. Glass is made of glass
Q:Plastic window GB8814-88 what it means
GB8814-2004 (PVC doors and windows).
Q:What are the problems with the installation of windows?
Wall plaster and hole whether there is a gap?
Q:Paving mosaic construction process
Double gull nostalgic mosaic can be used for indoor and outdoor floor and wall decoration. For construction paving, the most critical job is to prepare the surface of the site. Tiles must be in the horizontal and vertical angle are accurate and accurate paving, so as to avoid problems. Paving the surface must be clean and dry. Paving materials: the market has a professional mosaic tile adhesive and sealing agent, there are two-in-one tile glue. Color is also a variety of points, according to different needs with the use of cement and sealant. The most widely used is white and black. Paving tools: grouting floating, large bucket, V-shovel, hammer, small bucket, pliers. Paving steps: 1. In the vat inside the mixed powder-like mosaic tile glue, stirring at the same time by adding water until peanut butter to achieve similar viscosity. 2. In the construction of the wall, then use the v-type shovel. Each post a paste From the middle of the patch area to start paving out. In the wall with the horizontal line and the vertical line for the mark, you can make the gap between each paste evenly. Hand the appropriate force to the mosaic into the tiles inside, so that mosaic and ceramic tile full contact. 3. Paste finished or close the mosaic, you need to paste a paste on the match mosaic. With a piece of wood and a hammer, gently tapping to adjust the position of the mosaic. Need to pay special attention to the edge and connection of each mosaic. 4. If necessary, adjust the mosaic position in time before the mud is dry. 5. Allow the mud to have a 24 hour posture before filling. 6. Dry the sealant for 10-20 minutes, then gently wipe the mosaic surface with a piece of wet sponge. 7. Finally, wipe with a piece of lint-free cloth out of the mosaic surface of the remaining cement and caulking agent.

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

Hot products


Hot Searches

Related keywords