PVC sliding doors
- Loading Port:
- China Main Port
- Payment Terms:
- TT OR LC
- Min Order Qty:
- -
- Supply Capability:
- -
OKorder Service Pledge
OKorder Financial Service
You Might Also Like
PVC sliding doors /Glass sliding windows
VC(vinyl, plastic) material, 60mm, 80mm series
A. Color: Mainly white and Green, other color is also acceptable.
B. Size: As for your need
C. Glass: Single glass, Insulated glass, Low-e glass, Argon glass, Tempered glass
D. Hardware: Chinese top brand
E. Packing: Standard Export packing
F. Function:
1. Good appearance
2. Can give you more space
3. Good Air Infiltration and Water Resistance
4. Sun resistance and Durable
5. Easy Install and Easy Maintain
Long-lasting durability, energy-saving, sound-proof
Certified quality by national and international institutions.
1.Package and Delivery:
Package: standard export packaging. We can make other packings per your requests.
Delivery detail: usually 25 working days for a 20 feet container.
2.Payment and Shipping Terms
a, FOB price, calculated depending upon the delivery place, usual price is EX-WORKS.
b, Payment terms: T/T, based on quotation sheet or contract.
3.Scope of Service
You are welcomed to visit our factory any time when you are convenient. We would always supply you with best quality and best after-sale service.
- Q: Red TV background wall, white wall, juvenile window frame with what color curtains nice, living room, bedroom, son room
- Curtain color as much as possible in the same color to find light, such as large windows with pale pink, small windows can be appropriate than the color deep. Or select the point of contrast is also OK, a small area, mainly used to embellishment.
- Q: Whether it is possible to take a new root
- This is the framework of the structure of the wall filled with the window frame quite a 'structural column', different from the masonry structure of the seismic structure of the structural column must be up and down the pass, this 'structural column' can be used to install the bar or reserved Tendons and other methods of timely rooting.
- Q: What is the size of the doors and windows of the building? Like M1021 or C1520 height is from the amount of the above? What about the above beams?
- After the installation of doors and windows, M1021--1030 wide, 2130 high. C1520--1530 wide, 2030 high. From the bottom of the beam down the amount.
- Q: Broken bridge aluminum screens how to go up
- The first step: the yarn box, air slot, bottom assembled, and then use six screws to twist it to make it a square box. The second step: the screen on the installation site, pay attention to the left and right air duct and the door window frame to the left and right symmetry, bottom position from the door frame frame to be about 5cm lower, put the left and right with the clip, Doors and windows so that they can not move. The third step: with electric drill with 3.2mm drill bit in the door window frame inside the puncture. Step 4: According to the need in the left and right air trough and below the bottom of the corresponding place marked with 6 to 14 eyes, and then screw the screw is installed. Installation Notes: 1, the yarn box to be vertical fixed, broken bridge aluminum doors and windows at both ends to occupy the upper and lower border prevail. 2, up and down the slide with the location of the parallel box fixed, to avoid skid inside and outside skew. 3, the base position to close the pull beam, placed in the sliding window swoop to close and then draw lines and fixed, so as not to fixed position too far or too far. 4, if the parts of the fixed nail is too long, will prevent the normal sliding sliding window slick, broken bridge aluminum doors and windows can be self-nail with a shears cut short can be.
- Q: Just do not understand the information, please take care of the older generation, and then this Xianxie! More
- 1, hidden engineering acceptance 2, the approval and so on
- Q: Do doors and windows and curtain wall construction is carried out at the same time or cross-operation? Trouble experts to mention something
- Can also be carried out at the same time, the focus is the curtain wall and doors and windows at the mouth to deal with ~
- Q: It should be renovated in 2000, the quality of the wall is still very good, is a bit dirty, the windowsill paint has been completely sunburn, polished and then paint it? Question added: in the end which first? Answer how it is the opposite
- Can ah, if the wall is also complete, then re-latex paint on it. First brush the wall, in the brush window frame, brush the window when you use the protective paper to the surrounding wall will not paint the paint on the wall. The window with sandpaper to the old paint polished clean and then on the new paint is ideal.
- Q: What are the welding principles for steel doors and windows? Whether the vertical or vertical vertical welding, corner and doors and windows are used in what way to welding. More
- The steel frame with the doors and windows of the project that is to take dry construction, steel frame only from the middle of the connection, the steel frame with its own welding requirements are not high; but the steel frame to form a frame, horizontal or vertical length can be. Want to learn more about the doors and windows of the wall knowledge, please Google input: "Union curtain wall Forum"
- Q: Doors and windows should be used to set aside the hole to install, do not use the edge of the installation side of the mouth or the first installation of the construction method What is the meaning, which can explain in detail
- 2 can only be the installation method is different from the actual measurement of the end of the gray processing of the installation of the expansion screw installation ~ no plaster is the size of the doors and windows is smaller than the hole 20MM has a fixed connection
Send your message to us
PVC sliding doors
- Loading Port:
- China Main Port
- Payment Terms:
- TT OR LC
- Min Order Qty:
- -
- Supply Capability:
- -
OKorder Service Pledge
OKorder Financial Service
Similar products
Hot products
Hot Searches
Related keywords