• yuchai YC260R Rotary drilling rig System 1
yuchai YC260R Rotary drilling rig

yuchai YC260R Rotary drilling rig

Ref Price:
get latest price
Loading Port:
China Main Port
Payment Terms:
TT OR LC
Min Order Qty:
-
Supply Capability:
-

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

yuchai YC260R Rotary drilling rig

Technical Specifications

Item

Parameters

Chassis

Engine Model

 

CUMMINS QSM11-C330

Rated Power/Speed

kW/rpm

246/2100

Outer Width of Crawler

mm

4400

Width of Crawler Plate

mm

800

Hauling Force

kN

520

Power Head

Maximum Torque

kN·m

260

Speed

r/min

6-26

Maximum Pressure

kN

200

Maximum Pulling Force

kN

250

Pressurized Cylinder Stroke

mm

5000

Hoist

Main Hoist

 

 

First Layer of Lifting Force

kN

280

Maximum Lifting Speed

m/min

55

Diameter of Wirerope

mm

Φ32

Auxiliary Hoist

 

 

First Layer of Lifting Force

kN

80

Maximum Lifting Speed

m/min

65

Diameter of Wirerope

mm

Φ20

Mast

Rake Angle

°

5

Left/Right Tilt Angle

°

±4

Hydraulic Pump

Maximum Pressure

Mpa

35

Hole Depth

Hole Diameter

Maximum Drilling

mm

2500

Maximum Drilling Depth

m

80

Drill Pipe

Drilling Pipe

mm

Φ508

Working Weight

t

82

Keywords:rotary drilling dig,yuchai rotary drilling dig,weichai rotary drilling rig,weichai,chinese rotary drilling rig


Q: Will the crawler auger / pile driver dig out the soil and put it aside or can it be removed far away?
According to the length of the pole of the pile driver, the distance is different.
Q: 18 how much money piling machine
Blue ocean road pile drivers, 180 models, usually range from 5 to 70 thousand
Q: I have learned how to drive a pile driver. I want to know what the salary is. How can I find a job in the future?
Into the company, there will be no worry about work, such as the construction of the railway these big projects, you need such talent, but it will be very hard, and wages than other drivers of high wages
Q: A pile driver 1 team can play many 12mI36b steel sheet pile
According to the geological conditions are different450 pile driverThe number of 9m Larson steel sheet piles is about 100 a day300 times the pile driver
Q: How many hours will it take for the 200 piles and the 1 pile drivers?
Because there is a piling process: measurement line - out pile connection - send pile inspection -- moving pile pile machine in place -- the original check -- prefabricated pile precast pile lifting pile stabilizing pile -- -- --.It depends on what kind of pile, the diameter of the pile, the geological condition, the construction site, the construction organization and so on.Taking prestressed pipe pile of 18M as an exampleAbout 20 per day, about 10 hours / day, and that is exactly every half an hour. This refers to the "stability, pressure, connection and delivery" critical progress, because other schedules can be arranged in parallel. While not completely parallel arrangement, the efficiency drops by half, that is, it takes 1 hours to hit a pile.So it takes a lot of skilled workers to finish the job faster.
Q: How much is piling foundation for pile driving machine?
Piling machine prices from more than ten million to millions of, and the specific depends on how big you hit the pile, the specific configuration. Selection of models requires selection according to use.
Q: How much voltage does a tower crane need, and how much voltage does the 160A meter equal?
The site of the hydraulic piling machine and crane are in need of three-phase power supply of 380/220V, the general piling machine power is about 40KW, the crane power is about 70KW, so probably need 110~130KW power, three-phase 160A meter can take 105KW, general electric meter overload ability than the wall, with 1 sets of hydraulic piling machines and 1 sets of tower crane very reluctantly can.
Q: How do you pile it?According to different pile, talk about some details
Diesel pile hammer is the use of diesel hammer pile and cement pile has made a hammer a hammer to break into the underground, to determine the pile length and diameter according to the needs of geology, precast pile length is generally divided into three meters, six meters, nine meters and fifteen meters.
Q: What safety measures should be taken when assembling a pile driver?
4, mechanical equipment installation and transportation safety mattersThe mechanical equipment should be installed in a safe place, not in the rock slope landslide, or may be installed by flood invasion and flying stone in place, to ensure personal safety and machinery.The room layout shall be constructed according to the mechanical instructions or actual needs. Room to ensure mechanical windproof and rainproof, antifreeze and other requirements, to the appropriate area, convenient operation and maintenance, and adequate lighting, good ventilation, shutdown protection facilities for temporary use of machinery should be necessary.Mechanical equipment shall be installed according to the instruction manual and relevant regulations. After installation, safety inspection and performance test shall be carried out, and may be put into use after the test operation has been qualified.When the mechanical equipment is transported, make sure the binding is firm, the center of gravity is reliable, the brake is reliable, and the traffic safety is ensured.When mechanical equipment is unloaded, be sure to handle with care, forbid to throw and throw off from the car, use dump truck to transport machinery, forbid dumping with dumping method.
Q: How can I find a pile driver?
Go to the construction site, it is better to have known the construction team, or the construction company pull!

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

Hot products


Hot Searches

Related keywords