Mobile Hydraulic Dock Ramp
- Loading Port:
- Tianjin
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 1 unit
- Supply Capability:
- 500 unit/month
OKorder Service Pledge
OKorder Financial Service
You Might Also Like
Hydraulic mobile dock ramp is cargo handling auxiliary equipment,is used together with the forklift.
Only need one person operate, can realize the rapid loading and unloading goods.It makes the enterprise to reduce a large number of labor force, improve work efficiency, and gain greater economic benefit.
Model | Capacity | Lifting height | Table size | Total dimension | Weight | Opertaion |
YDCQ-5 | 5T | 1-1.8m | 10*2m | 10.5*2.08*1.0m | 2800kg | Manual/ Electric |
YDCQ-6 | 6T | 1-1.8m | 10*2m | 10.5*2.08*1.0m | 2900kg | Manual/ Electric |
YDCQ-8 | 8T | 1-1.8m | 10*2m | 10.5*2.08*1.0m | 3000kg | Manual/ Electric |
YDCQ-10 | 10T | 1-1.8m | 10*2m | 10.5*2.08*1.0m | 3100kg | Manual/ Electric |
YDCQ-12 | 12T | 1-1.8m | 10*2m | 10.5*2.08*1.0m | 3200kg | Manual/ Electric |
YDCQ-15 | 15T | 1-1.8m | 10*2m | 10.5*2.08*1.0m | 3300kg | Manual/ Electric |
★Platform uses special diamond mesh plate,has reliable strength,can ensure the long term use without deformation. It is antiskid steel nets which benefit for forklift to climb even meets rain or snow.
★Operation: manual or electric, battery can be installed on it;
★Option of Italy imported advanced hydraulic system, with great performance.
★Heavy duty mobile tyre,Mobile wheels adopt solid tyres, need not inflatable, durable, cooperate to brake pad, guarantee the operation safety.
★Safety crack-proof valve on pump station.
- Q:What kind of aptitude does ZLp overhead job basket use?
- Two, basket mounting qualification (such as: lifting machinery qualification three or more, ABC, three categories, security, construction, electricians and other personnel, etc.)
- Q:How to grasp the proper use of basket
- Second. Control the approach of equipment. Must be consistent with the equipment scheme, absolutely not different types of construction basket equipment mixed, so as to avoid the construction of fire. Third, to strengthen the monitoring of ZLP630 type construction basket installed, is also in order to ensure the safety of the construction process, the installation construction basket must monitor whether the correct assembly of construction basket, place is safe and reliable.
- Q:Construction basket required data
- A basket, production license, product certification, product registration certificate copy; two, operating personnel safety operation procedures; three, construction site temporary power equipment; four, the construction site is equipped with fire fighting equipment; five, operating personnel and management personnel list list; six, special safety construction scheme;
- Q:What are the kinds of basket?
- 1, Phnom Penh Chlorophytum plant Description: golden leaf edge.2, Chlorophytum plant leaf Center Description: Yellow longitudinal stripes.3, silver edge Chlorophytum plant Description: leaf margin for white.4, Chlorophytum comosum plant Description: silver white vertical stripes around the main vein of leaves.
- Q:How to transplant basket?
- There is no soil transplant is not a problem, the problem is that after transplanting soil, must be compacted. Don't leave any space. Water it for the first time.
- Q:Basket installation unit qualification?
- To more stringent management norms Jiangsu Sheng Zhejiang Province, for example, the height of the operating basket of the normal use of two main categories of qualifications, first, production and production qualifications
- Q:Request a basket construction quota
- The use of construction basket wall repair and brushing the wall paint, how to calculate the cost of measures (experts). According to the actual situation, the selected quotations, such as scaffolding construction, construction measures should apply scaffolding quota items. Such as hanging basket construction, it should be calculated by the use of basket construction measures
- Q:How much money one day rental basket
- The rent has now transparent basket, unless the standard requirements and special construction environment is difficult, the general term of three months rent by 50 to 70 yuan / day, plus installation and disassembly fee (according to the site environment and the height and the auxiliary facilities set), freight by distance meter, according to the amount of testing fee by region. One month per month, 5 dry basis, two monthly, 7 thousand base
- Q:What are the basic components of the overhead hanging basket?
- Gondola structure: the structure is divided into three parts: suspension platform, wire rope, sling suspension platform containing platform, elevator, safety lock and limit switch, the control box containing suspension frame, weight lifter
- Q:630 basket counterweight should be how many KG?
- The drawbacks of concrete counterweight counterweight general electric basket factory configuration for each cantilever beam 500kg, according to different manufacturers, weight 25kg/ block or a 50kg/ block two specifications, the counterweight material is generally plain concrete, which has a hole, using steel or steel tubular laminated bearing on bearing welding.
1. Manufacturer Overview |
|
---|---|
Location | |
Year Established | |
Annual Output Value | |
Main Markets | |
Company Certifications |
2. Manufacturer Certificates |
|
---|---|
a) Certification Name | |
Range | |
Reference | |
Validity Period |
3. Manufacturer Capability |
|
---|---|
a)Trade Capacity | |
Nearest Port | |
Export Percentage | |
No.of Employees in Trade Department | |
Language Spoken: | |
b)Factory Information | |
Factory Size: | |
No. of Production Lines | |
Contract Manufacturing | |
Product Price Range |
Send your message to us
Mobile Hydraulic Dock Ramp
- Loading Port:
- Tianjin
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 1 unit
- Supply Capability:
- 500 unit/month
OKorder Service Pledge
OKorder Financial Service
Similar products
Hot products
Hot Searches
Related keywords