• Plie Hammer Hydraulic Pile Hammer for Sale System 1
  • Plie Hammer Hydraulic Pile Hammer for Sale System 2
Plie Hammer Hydraulic Pile Hammer for Sale

Plie Hammer Hydraulic Pile Hammer for Sale

Ref Price:
$100,000.00 - 500,000.00 / unit get latest price
Loading Port:
Shanghai
Payment Terms:
TT or LC
Min Order Qty:
1 unit
Supply Capability:
1000 unit/month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

Plie Hammer Hydraulic Pile Hammer for Sale

Plie Hammer Hydraulic Pile Hammer for Sale

Product Features:

 

1.Leader: three-point support,vertical degree of the leader could adjust around,the contrapuntal of leader can adjust around.

2.Drive mode: external power supply, full hydraulic pressure drive, high efficiency, protect environmental and save energy.

3.Movement: adopt long boat,short boat and support leg mechanism, good stability, move flexible, chassis contact large area, especially suitable for the place that is easy to sink machine.

4.Adaptability: to be hanged diesel pile hammer, hydraulic piling hammer, vibratory hammer, bored pile drilling rig, triaxial linkage SMW.

5.Operation mode: all the actions adopted in manual manoeuvring valve,speed of movement can controlled by the hand feel, safety performance is high, not easy to failure.

6.Transition,transport: the leader could down and up through the amplitude cylinder, packing convenient.



Parameter
Rotary angle360°        
Leader incline

Front inclination 10°,Back inclination 3°                                                                           

Leader oriented center distance 、diameter                                                                 600×102 mm
Rated pressure of hydraulic system20 Mpa
Max lifting force300 KN
Working dimension: L×W11.7 m×8.5 m
Total weight60 T
PaceShort boat pace700 mm
Long boat pace2400 mm
Supporting leg pace1300 mm
Distance from long boat to ground400 mm
Distance from short boat to ground900 mm
Leader diameter720 mm
Main winchSingle pulling force 60KN×2 set, max lifting 30t
Piling winchSingle pulling force 40KN×2set, max lifting 27t
Long boat contact area18.7 m2
Short boat contact area16.7 m2
Motor power22×2=44 KW

FAQ

1.Which payment terms can we accept?

  Normally we can work on T/T term or L/C.If you choose T/T,30% payment is required in advance and 70% balance shall be settled before shipment often,it rang a little.

2.How long will our price be valid?

We are friendly dealer, never greedy windfall profit, our price remains stable,except the exchange rate and the increasing labor cost and material cost.

3.What are our advantages compared with manufacturers?

a.Detailed training-We can provide training services to different users. The training sessions include product training,operating training, maintenance know-how,standard and so on to fulfill your individual needs.The training can be conducted at client’s site.

b.Available after service-With our global distributor network, you are guaranteed with fast deliveries and services if you submit your requests.

Company Information

China National Building Materials Group Corporation is the full name of CNBM, which is one of the largest state-owned group in China. In 2013, the total asset of CNBM exceeds US$60 billion dollars with a total staff of 180,000. CNBM is listed in the World Top 500 Enterprises!

CNBM International works as the international platform for CNBM Group. In 2013, our total sales income was more than US$16.8 billion dollars.Every year we import large quantity of iron ore, coking coal and thermal coal etc from India, Brazil, Australia and Russia and other countries.ld'>Our major responsibility is international marketing of different construction machinery & formwork, including lifting machinery, concrete machinery, earthmoving machinery, brick/block machinery; steel frame formwork, H20 timber beam formwork, aluminum formwork etc.

Our major responsibility is international marketing of different construction machinery & formwork, including lifting machinery, concrete machinery, earthmoving machinery, brick/block machinery; steel frame formwork, H20 timber beam formwork, aluminum formwork etc.




Q:In what type of terrain can the survival machine be used to strike minerals?
Good character on the line, there must be a high mountain mines, coal, iron less.Chasing the answerCopper is also possible
Q:I heard that the operation of the pile driver can make about ten thousand a month, is it possible? It sounds a bit dodgy. Who knows about this job? Please tell me how much you can make it for a month
Generally similar, but if the site is more, then more than this money
Q:Does the diesel pile driver use electricity?
Q: a 15KW long spiral three ring power head, the starting current is about how big, I want to plan the temporary use of electricity on the site, I do not know a temporary construction of 60000 square meters of plant, how much electricity KW? Answer: in general, long spiral ring power head motor starting current depends on the specific circumstances, if the full voltage starting with load, the starting current is 5-7 times the rated current of the power supply.
Q:What type of machine is needed for highway foundation piling machine? Price?
This series of drilling machines is a new type of pile foundation construction machinery, which adopts hydraulic walking, electric control and long auger drilling. Hydraulic drive chassis can achieve 360 degrees of full swing, in place, move, tune, equal action, fast and accurate. The utility model can be used for carrying out the drilling operation, and the steel cage can be lifted by itself and the grouting operation can be carried out by adopting two electric control winches. The output shaft of the power head is hollow, and besides the general long spiral dry method, the deep mixing method can also be applied.
Q:How many meters per day can a foundation shovel in Luoyang be 80 centimeters in diameter? Is it easy to damage?
According to the different soil layers, if silt if one hour is 8 meters, if encountered in geological almost but also to add some water, general soil clay, the clay soil mainly depends on pull speed hit the car with no follow on, Luoyang has specialized in the production of large caliber. Peony motor Luoyang shovel, one hour fast hit 35 meters, average 20 meters.
Q:How to use the pile driver?You're right. Contact 18961845125 before you know.
Installation operation procedure editorFirst, piling machine operators must be familiar with the structure of the machine, performance, operation essentials and safety precautions, after passing the test and obtain a certificate, you can operate alone.Two, operators must concentrate on the operation. Do not talk, laugh, play or make trouble with unrelated persons. No smoking or food is allowed during the operation.Three, strictly abide by the relevant provisions of the maintenance of pile drivers, conscientiously do all levels of maintenance, to ensure that pile drivers are often in good condition. And pay attention to the rational use, correct operation.Four, the pile driver in the work should be prepared for the following:1, to the construction staff understand the construction conditions and tasks, and construction problems found in this class should pay attention to matters.
Q:The impact of drilling pile driver how much money
See how big you want to play, I want to hit a big pile on your point
Q:I can drive an excavator and a hammer, but I want to learn how to drive a pile driver. How long will it take to learn?
Very quickly, understand the working principle, work methods, basically on the line
Q:I have been using a common type of 260 fence pile driver, I still feel good with the use of, I heard that the loading barrier, pile driver more cattle I'd like to ask if the loader guardrail is practical? What is the daily piling efficiency? What's the fuel consumption? Please let me know when I've got the trouble. I'll try to buy one if I know the right thing.
And, as I have seen, ha, five loaders have been used for more than a year since the purchase. There has been no major failure. It may be luck. Arguably, domestic engineering equipment should not be so used.I suggest, if you small quantities or steadfastly practical cost 260, the large quantity you can choose the loading type guardrail piling machine try very energeti.
Q:How to hit a pile of photovoltaic power generation?
Hello, at present there are two kinds of photovoltaic power station pile production process, the first is to buy the prefabricated pile already,

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

Hot products


Hot Searches

Related keywords