• ZYC series ZYC240B-B multi-functional Hydraulic Static Pile Driver System 1
  • ZYC series ZYC240B-B multi-functional Hydraulic Static Pile Driver System 2
  • ZYC series ZYC240B-B multi-functional Hydraulic Static Pile Driver System 3
  • ZYC series ZYC240B-B multi-functional Hydraulic Static Pile Driver System 4
ZYC series ZYC240B-B multi-functional Hydraulic Static Pile Driver

ZYC series ZYC240B-B multi-functional Hydraulic Static Pile Driver

Ref Price:
$200,000.00 - 500,000.00 / unit get latest price
Loading Port:
Shanghai
Payment Terms:
TT or LC
Min Order Qty:
1 unit
Supply Capability:
1000 unit/month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

 ZYC series multi-functional Hydraulic Static Pile Driver 


ZYC series ZYC240B-B multi-functional Hydraulic Static Pile Driver

Features

Main product: ZYC series multi-functional Hydraulic Static Pile Driver Self-developed with 5 up-to-date patents.

The working principle is using hydraulic pressure to clamp precasted pile, H shape or other shape steel pile, and then driving the pile into ground by hydraulic pressing.

Suitable for piling precast round & square concrete pile, H shape steel pile and other irregular-shaped pile in clay, soft soil and sandy ground.

It has characteristics of no noise, no vibration, no pollution, clear ground with high speed of pile driving, reliable construction quality and environmental protection, high efficiency, energy saving. It is welcomed by the customers with wide market prospect.

ZYC series ZYC240B-B multi-functional Hydraulic Static Pile Driver

Flexible connection technology

Novel flexible connection technology of central axis, won national practical patent 

ZYC series ZYC240B-B multi-functional Hydraulic Static Pile Driver

Multi-functional piling technology

Original combination clamping piling and top piling won invention patent


ZYC series ZYC240B-B multi-functional Hydraulic Static Pile Driver

Inverted cylingder technology

Structure design of inverted cylinder changes strained condition of cylinder and increases the service life of cylinder, won national practical patent


ZYC series ZYC240B-B multi-functional Hydraulic Static Pile Driver

Integrative side and corner piling technology

Particular side and corner piling mechanism increasing the capability of side & corner piling and won national practical patent 

ZYC series ZYC240B-B multi-functional Hydraulic Static Pile Driver


Self-adaptive clamping mechanism

Original self-adaptive clamping mechanism won national practical patent 


Parameters:

Rated piling pressure(tf)240suitable pile & specification(mm)300-400  ¢300-400
Max. Piling speed(m/min)7.5Max. Crane lifting weight(t)12
Piling stroke(m)1.8Hanging pile length(m)14
Max. Longitudinal pace(m)3.3Minimum side piling space(mm)1200
Max. Transverse pace(m)0.6Minimum corner piling space(mm)2400
Max. Rise stroke(m)1.0Intensity of pressure(tf/m²)9.9/10.1
Max.rotation angle per time(°)15°Weight composition(t) Machine weight89±2
Rated hydraulic system pressure(mpa)23(20)Added water weight(t)130
Hydraulic Pump (Unit × Ml/Turn)2×63+1×80Counter weight(t)24
Motor power (Unit × kw)

  2×22+1×30  

Total weight(t) ≥240


FAQ

To provide customers with professional and technical services, to meet the demands of customers for construction efficiency and cost control, to achieve value for customers, which is the constant pursuit of Toppile, Toppile implant this concept in the whole process of sales and services.

Before sales

Research market with customers; provide technical advice, customized design and production.

 

On sales

Always communicate and adjust of design with customer to ensure the product satisfy all requirements.

 

After sales

Provide installation, adjustment, maintenance service, create customers files, following up machine working situation, provide customer a whole set of “Butler” and “Gapless”services.

 

Value added services

Redesign and upgrade the hydraulic system of piling machine, upgrade structure components.

Provide high quality and lower price components.

Toppile is the agent of many components factories, including cylinders, pumps, seals, hydraulic elements.


Company Information

China National Building Materials Group Corporation is the full name of CNBM, which is one of the largest state-owned group in China. In 2013, the total asset of CNBM exceeds US$60 billion dollars with a total staff of 180,000. CNBM is listed in the World Top 500 Enterprises!

CNBM International works as the international platform for CNBM Group. In 2013, our total sales income was more than US$16.8 billion dollars.Every year we import large quantity of iron ore, coking coal and thermal coal etc from India, Brazil, Australia and Russia and other countries.ld'>Our major responsibility is international marketing of different construction machinery & formwork, including lifting machinery, concrete machinery, earthmoving machinery, brick/block machinery; steel frame formwork, H20 timber beam formwork, aluminum formwork etc.

Our major responsibility is international marketing of different construction machinery & formwork, including lifting machinery, concrete machinery, earthmoving machinery, brick/block machinery; steel frame formwork, H20 timber beam formwork, aluminum formwork etc.




Q:How much is the hydraulic pile driver?
LZ, look, you are layman, and now blue ocean machinery hydraulic pile drivers are considered cheap, about fifty thousand or sixty thousand of the way
Q:Why levy piling
Because the foundation bearing capacity of the building is low, it can not meet the load requirements of the upper building. Piling is to pass the weight of the building to the soil with high bearing capacity of the foundation. Not all buildings are piling, and if the bearing capacity of the foundation meets the requirements, the pile can not be piled completely. Like Beijing, few piles are used because of the good bearing capacity of the foundations.
Q:What is the noise level of site construction (piling)?
The construction is divided into several stages, and the noise limits are as follows:Earth stage, daytime noise limit is 75 dB, the night noise limit is 55 dBPiling stage, daytime noise limit is 85 dB, prohibit the construction of the night
Q:The impact of drilling pile driver how much money
See how big you want to play, I want to hit a big pile on your point
Q:What is the noise of a static pile and a diesel pile driver?
The noise of the static pile is small, so it is suitable for the construction in the city and the construction cost is higher.
Q:How many hours will it take for the 200 piles and the 1 pile drivers?
Because there is a piling process: measurement line - out pile connection - send pile inspection -- moving pile pile machine in place -- the original check -- prefabricated pile precast pile lifting pile stabilizing pile -- -- --.It depends on what kind of pile, the diameter of the pile, the geological condition, the construction site, the construction organization and so on.Taking prestressed pipe pile of 18M as an exampleAbout 20 per day, about 10 hours / day, and that is exactly every half an hour. This refers to the "stability, pressure, connection and delivery" critical progress, because other schedules can be arranged in parallel. While not completely parallel arrangement, the efficiency drops by half, that is, it takes 1 hours to hit a pile.So it takes a lot of skilled workers to finish the job faster.
Q:Track excavator truck model, preferably material, and some are sent to the mailbox thank you very much
Hello, have you found it? I also want a blender model. Could you send me a , please?
Q:Under the high voltage line, within two meters on both sides, no pile driver shall be installed
No piling machine shall be installed within 10m on both sides of high tension line. In case of special circumstances, the safety technical measures must be taken and the installation can be installed after the approval of the higher technology supervisor.
Q:Do you make money on building pile drivers? How long will it take to recover the cost?
Can make money, in the case of business, half a year time will be able to recover costs!
Q:Why are pile driving boring often deflected?
Because of the address, it's better to fix it and then fix it on the steel plate pile.

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

New products

Hot products


Hot Searches

Related keywords