Waterproofing and Breathable Membrane PE Film and PP Non-Woven
- Loading Port:
- Shanghai
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 2000 m²
- Supply Capability:
- 500000 m²/month
OKorder Service Pledge
OKorder Financial Service
You Might Also Like
Breathable Membrane PP Non-woven Fabric Laminated with PE Film
General Information:
We are located in National Development Zone in Nantong, with 22000 square meters area, including 7000 square meters dust free workshop.
We have equipped the most advanced pp non-woven production line and composite production lines including extrusion lamination production, hot melt lamination production line, calendar bonded production line with the technology from Italy and Germany, printing production line, cutting production line. We specialize in producing waterproof and breathable materials and heat insulation materials, pp non-woven fabric, disposable medical products, packaging materials and so on.
Specifications:
Product Name | Composite PP Non-Woven Roofing Breathable Waterproof Membrane |
Color | Grey |
Structure | PP Non-Woven/PE Film/PP Non-Woven |
Roll Width(m) | 1.5m (+/-0.5%) |
Roll Length(m) | (1)50m,100m,200m,500m,1000m (2)according to the customers' requirements |
Basic Weight | 80g/m²,90g/m²,100g/m²,115g/m² ,120g/m² ,140g/m² ,160g/m² |
Temperature Resistance | -40 °C to 100 °C |
Water Resistant | Class 1 |
SD-Value | 0.02m |
Vapor Permeability | 2250g/m²/24h |
UV Resistant | 3-6 months |
Packing | 1)each roll packed by plastic bag, then with carton or pallets 2)according to the customers' request |
Price Terms | FOB,CNF,CIF |
Payment Terms | TT,LC, |
Delivery Time | within 15 working days after received your payment in advance |
Typical Application:
Container Loading:
FAQ:
1. Where is your factory located in?
Our factory is located in Jiangsu province, close to Shanghai.
2. Have you ever been export?
Yes, our product has been exported to many countries.
3. Can we get samples?
Yes, we are free for samples, what you need to assume is freight charge.
- Q:Can acrylic materials be perforated? How to do waterproof after punching?
- Anti-corrosion nine PCT board size is greater than the size of the hole, that is, just in the hole on the nine-plate, This can play a certain role in strengthening.
- Q:Roof leakage, what materials do the best waterproof
- Therefore, rainy days should not be construction, to wait until the sun will dry the water before construction. The roof of a large area of ??leakage or a number of water leakage points, the first by the professionals to check whether the cracks, according to the previous program to deal with the cracks in the roof covered with waterproofing membrane, to enhance the waterproof effect, you can also shop On the insulation board, because the height of the insulation board in 20 cm or more, to achieve the protection of waterproof layer and thermal insulation of the double effect. Do not want to use the insulation board of the family, you can consider the use of steel mesh concrete, leak-proof effect is also very good. Wall cracks appear seepage, under normal circumstances the professional construction team will use the basket, by the maintenance staff in the external wall construction.
- Q:Finished house bathroom waterproof household acceptance should be how to accept?
- 4: coating waterproof layer coating evenly, the thickness of the product to meet the technical requirements, the general thickness of not less than 1.5mm not exposed at the end.
- Q:I would like to ask how to do in the warm water above,
- I do not do 80% of the warm water, of course, the use of good quality water pipes, waterproof water is generally done in the following to do, if done in the warm tube above will affect the heat of the floating, to warm the following covered with a Layer insulation layer and then covered with warm tube to, and then beat the water to ensure that no leakage. And finally in the above covered with wooden floor or floor tiles.
- Q:Villa roof leakage what general reasons, what materials to remedy
- First, the roof leak to find the first leak, looking for the main leak from the roof to the lower to find leakage. First look at the roof there is no crack, the original waterproof layer is not aging, the roof of the original waterproof membrane has no bubbles, there are bubbles to prove that the water has entered the bottom of the waterproof layer, and thus leaking, and roof On the gutter there is no clogging.
- Q:How does the finished ventilator manufacturer waterproof?
- do not play any silicone and tape, to avoid the silicone tape aging caused by leakage hazards. Can be done once and for all.
- Q:Hello, roof with SBS waterproof material bulk density is how much?
- As the SBS coil finished with pure asphalt is not the same, the coil includes a variety of surface material weight. The following is the different types and different thickness of the SBS coil unit area weight, due to the need to lap and pave the reinforcement layer, calculate the load in the following unit area weight, the general multiplied by 1.2 coefficient.
- Q:Do you use the waterproof material on the building to be harmful to the human body?
- If you are out of the finished line, the best anti-static that can! I plant is the production of waterproof material, in addition to the internship when I went to the workshop, and now I do not go!
- Q:Waterproof material water leakage construction should pay attention to what
- 2, wall treatment · Wall treatment to do about 300mm high waterproof coating, to prevent water infiltration wall back tide. · Bathroom between the wall and the ground (plane and elevation) brushing height should be greater than 100mm. · The height of the shower room in the bathroom is not less than 1800mm. · If there is a bathtub, the height of the wall adjacent to the bathtub should be 300mm higher than that of the bathtub. · Waterproof height of tub is not less than 800mm. · The height of the squat should be more than 900mm. For the transformation of the toilet wall and self-built light wall, the proposed height of the waterproof to do the top.
- Q:How to do waterproof bathroom, construction process is what
- First, the bathroom waterproof method: 1, brush the first time waterproof coating. Before the construction to ensure that the ground dry, waterproof coating to be painted, no omission, and the combination of solid grass, no cracks, no bubbles, no shedding phenomenon. Brushing the same height, the thickness of the product requirements to meet the requirements.
1. Manufacturer Overview |
|
---|---|
Location | |
Year Established | |
Annual Output Value | |
Main Markets | |
Company Certifications |
2. Manufacturer Certificates |
|
---|---|
a) Certification Name | |
Range | |
Reference | |
Validity Period |
3. Manufacturer Capability |
|
---|---|
a)Trade Capacity | |
Nearest Port | |
Export Percentage | |
No.of Employees in Trade Department | |
Language Spoken: | |
b)Factory Information | |
Factory Size: | |
No. of Production Lines | |
Contract Manufacturing | |
Product Price Range |
Send your message to us
Waterproofing and Breathable Membrane PE Film and PP Non-Woven
- Loading Port:
- Shanghai
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 2000 m²
- Supply Capability:
- 500000 m²/month
OKorder Service Pledge
OKorder Financial Service
Similar products
Hot products
Hot Searches