Waterproofing Materials For Concrete Roof
- Loading Port:
- China Main Port
- Payment Terms:
- TT OR LC
- Min Order Qty:
- -
- Supply Capability:
- -
OKorder Service Pledge
OKorder Financial Service
You Might Also Like
Specifications
ceiling roof material1.5mx50m
Waterproof Class W1
SD-value 0.02m
Vapor permeability: 2250g/m2/24h
UV re
1) Introduction of ceiling roof material
Breathable Membrane is a water resistant membrane but with high vapour permeability, use as diffusion open roofing felts under pitched roof tile or vapour permeable barrier housewraps on timber frame walls
Breather membrane functions as a weather-resistant barrier, preventing rain from getting into the roof or wall assembly while allowing water vapor to pass to the exterior.
Breather membrane may also serve as an air barrier if it is sealed carefully at seams.
Breathable Membrane have good "water resistance", good "water vapor permeability", and good "air barrier properties".
3)Key Features of ceiling roof material
- Q: Bathroom first leveling or do waterproof, what is the difference
- Is the first water and then leveling. Home improvement toilet ground specific process practice: 1. The base layer, and which layer with the structural board, with cement mortar wipe. It is recommended to set the floor drain, the grassroots level should be flat and the direction of the leak to the slope. Against the wall and the root of the root should be wiped rounded.
- Q: Find the construction steps for waterproof coatings
- 3, note (1) rain weather and five wind above the weather shall not be construction. (2) coating waterproof layer shall not have bottom leakage, cracking, holes and other defects and peeling, bubbling, carcassing and wrinkle phenomenon. Coating waterproof layer and the base should be bonded between the solid, no hollowing, trachoma, delamination and so on. (3) the coating site should be continuous, solid, shall not appear Alice, hollowing parts. (4) rigid protective layer before the completion of any personnel shall not enter the construction site, so as not to damage the waterproof layer; coating of the overlapping parts should be care by the staff. (5) roof should be used lime soil, clay or sub-clay for backfill, thickness 50 cm, backfill shall not contain stones, gravel, ash and organic matter. Artificial compaction of each layer 25 cm, mechanical compaction of each layer 30 cm, rammed to prevent damage to the waterproof layer. In the backfill thickness of more than 50 cm, it is allowed to use mechanical backfill rolling.
- Q: Waterproof mortar expensive or dry mortar expensive
- Cationic neoprene latex is a polymer modified polymer anti-corrosion system. By the introduction of imported epoxy resin modified latex by adding the domestic neoprene emulsion and polyacrylate, synthetic rubber, various emulsifiers, modified latex and other components of the polymer latex.
- Q: What material is used for waterproofing of tarpaulin
- Polypropylene Coil is only suitable for use in the top, waterproofing membrane is mainly used for building walls, roof, and tunnels, highways, landfills, etc., to resist the external rain, if it is home improvement Waterproof with this is not good, with tar ingredients, pollution of the environment.
- Q: Home improvement waterproofing problem
- 3, waterproof as to do more than 2 centimeters of closed water 24 hours or more closed water test, check whether there is leaking and dampness downstairs phenomenon.
- Q: Can Henkel have water against him?
- Add a small amount of water is possible because the premise of waterproofing should also be wet before the grassroots
- Q: Js waterproof coating without powder can brushing
- 5. Coating maintenance: JS cement-based waterproof emulsion coating construction after 24 hours after the end with a damp cloth to cover the coating or spray water to maintain the coating, usually 2-3 days; air humidity, poor ventilation of the local dry The time period may be longer, and vice versa; 6. Check the construction of JS waterproof coating (closed water test): bathroom, pool and other parts in the JS cement-based waterproof emulsion waterproof layer after dry (at least 24 hours in summer, at least 48 hours in winter) stored water for 48 hours to see the water Construction is not qualified. Light wall must do the water test. JS waterproof coating See the amount of: under normal circumstances, the amount of about 0.6-1kg / ㎡, the actual amount from the use, the use of parts, rough surface roughness, environmental factors such as the decision.
- Q: Roof leakage, what materials do the best waterproof
- First, the roof leak to find the first leak, looking for the main leak from the roof to the lower to find leakage. The first is to see if there is no cracks in the roof, the original waterproof layer is not aging, the roof of the original SBS waterproofing membrane has no bubbles, there are bubbles to prove that the water has entered the bottom of the waterproof layer, and thus leaking. There is a block on the roof of the gutter is not blocked in the countryside, there are still a large number of tile-roofed house, when the tiles due to damage caused by the roof leakage, as long as the replacement of tiles can be, this step is also known as "
- Q: What are the key points and contents of the quality control of waterproof material?
- 2, ordinary two-component polyurethane: A material is similar to the appearance of edible oil translucent yellowish curing agent from polyether and isocyanic acid by polycondensation of polyurethane prepolymer (about 20,000 yuan / t), B material For the plasticizer, coagulant, fillers and other components of the black liquid (about 3900 yuan / t), after mixing the polyurethane coating is also black. But also because of A, B material of the huge spread so often the following two kinds of fraud: ① with a very cheap black oil (priced at only about 1,200 yuan / t), diluted with xylene after thin coating twice. Cold oil is not easy to dry after the coating, after each coating must be drying a few days, in the winter with roasted, and then do not sprinkle dry powder cement, so a long time paint are dry. ② is often used to expand the proportion of A, B components such as 1: 4-6 (usually 1: 2), but also in the polyurethane mixing process by adding cement powder as a filler, if the stirring is not added xylene diluted Agents and other methods of fraud.
- Q: Developers have done waterproof, decoration house also have to do it
- Secondly, before the waterproof layer may be done in the house decoration, paving tiles or other equipment when the installation was destroyed, so that the waterproof layer is no longer a whole,
Send your message to us
Waterproofing Materials For Concrete Roof
- Loading Port:
- China Main Port
- Payment Terms:
- TT OR LC
- Min Order Qty:
- -
- Supply Capability:
- -
OKorder Service Pledge
OKorder Financial Service
Similar products
Hot products
Hot Searches
Related keywords