• Bitumen Roofing Felt For Waterproofing System 1
  • Bitumen Roofing Felt For Waterproofing System 2
  • Bitumen Roofing Felt For Waterproofing System 3
Bitumen Roofing Felt For Waterproofing

Bitumen Roofing Felt For Waterproofing

Ref Price:
get latest price
Loading Port:
China Main Port
Payment Terms:
TT or LC
Min Order Qty:
4000 Square Meter m²
Supply Capability:
300000 Square Meter per Month m²/month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

                                                

Asphalt roofing felt is conformity with ASTM standards of the USA.

 

The roofing felt is widely used as underlayment which is under asphalt shingles. Its saturation rate is 100%,that’s to say, both water and air cannot enter.

 

 

Detailed Specification of Asphalt roofing felt:

 

 

Model

Width

Length

Thickness

Weight 

Qty/pallet

Qty/40'GP

ASTMD4869#15

36inch

144feet

0.5mm

38lbs

39rolls

1560rolls

ASTMD4869#30

36inch

72feet

0.7mm

30lbs

52rolls

1924rolls

ASTMD226 #15

36inch

144feet

0.7mm

45lbs

30rolls

1110rolls

ASTMD226 #30

36inch

72feet

1.2mm

48lbs

30rolls

1110rolls

 

 

 

Pictures of of Asphalt roofing felt:

 

 

 

 Asphalt roofing felt

 

 

 Asphalt roofing felt

 

 

 

 

 

 

 

 

Q: A complete set of basement waterproof construction program
Second, the basement of the external walls of water leakage construction preparation 2.1 Technical preparation 2.1.1 Selection of construction methods Waterproof engineering is related to the use of the project an important indicator, it is the construction process of a key project, difficult engineering. The choice of construction methods and programs has a direct impact on the quality of construction. The underground wall of the project SBS waterproofing membrane with hot melt method full construction. 2.1.2 before the start of the project, the first organization of engineering and technical personnel to enter the construction site, to understand the situation, to further understand the characteristics of the project to solve the contradiction between the construction technology and the implementation process. 2.1.3 technology before the end of the construction of waterproofing works by the professional foreman in accordance with the construction drawings and the existing national norms require the actual situation of the project to the construction team in writing to the end. The contents include construction site, construction sequence, construction technology, construction level, node fortification method, enhancement site and practice, project quality standard, guarantee the quality of technical measures. And after the field technical person in charge of the strict implementation of the audit.
Q: How to ensure the waterproof quality of the underground shear wall (retaining wall)?
2, when the basement depth is large, it is impossible to dig a place in time, you can use the reverse construction method, that is, dig a certain depth, then finished a section of retaining wall, to be a certain strength, and then open Dig, do the next retaining wall, and in this order until the construction to the specified design depth.
Q: What decoration materials, light and water, and the wall, the perfect combination of glass
Second, cover the surrounding surface With the tape or the US profile of paper to cover the surface of the interface surface, according to the width of the gap to keep the gap width, width uniformity to ensure that the sealing of the work lines neat and perfect;
Q: What material waterproofing can be mixed with cement sand
Waterproof layer used in the cement label of not less than 32.5MPa, the thickness of cement mortar should be 2-3cm, the surface clean and solid without cracks; mortar leveling layer of cement should not be less than 32.5MPa, leveling layer to smooth compaction, finished product maintenance is not low In 5 days.
Q: Hello, roof with SBS waterproof material bulk density is how much?
Similar to styrene-butadiene rubber, SBS can be in contact with water, weak acid, alkali, etc., with excellent tensile strength, surface friction coefficient, low temperature performance, excellent electrical properties, good processing properties, as the current consumption of the largest thermoplastic Elastomer.
Q: Nanning building waterproof material market where
Nanning this building waterproof coating does not seem to have a special market, waterproof materials like fast ring building materials market, Wan Tai Long have to sell, as well as Mingxiu Road and Mingxiu Road on both sides of the road have a heavy focus on waterproof materials and companies
Q: There is no formaldehyde in the finished putty
In addition, the addition of redispersible latex powder in the putty powder will make the putty have stronger adhesion and mechanical properties, outstanding water resistance, permeability, as well as excellent alkali resistance, abrasion resistance, and can improve water retention Sex, increase the opening time, enhance the durability.
Q: Roof for the insulation, Master roof, using two waterproof construction program
Third, security measures 1, firmly establish the "safety first, prevention first" safety production policy. Before the operation, the site management personnel must be to the operation team to carry out security technology to the end, and actively carry out pre-class security activities, security personnel check, supervise. 2, the roof around the poles outside the scaffolding (protective railings), roof construction is strictly prohibited removal. 3, roof construction, debris and other materials is strictly prohibited from the roof directly down throwing. 4, storage of coils and adhesives warehouse or site to prohibit the fireworks, for the use of fire, there must be fire prevention measures, and should set a certain number of fire extinguishers and sand bags. 5, oil drums should be flat, not two carrying, in the transport process, pay attention to balance, the spirit to focus, to prevent accidental fall caused harm. 6, transported to the roof of the material, should be scattered on average, with the use of transport, not concentrated stacking. 7, the use of torch, you should clear the surrounding flammable items, must be away from the base of oil, is strictly prohibited in the brush base oil area using the torch. Torch petrol should not be over full, cheer should not be too much, in the fire site must be equipped with fire equipment.
Q: Developers have done waterproof, decoration house also have to do it
so, in your house When the decoration, or should do a waterproof treatment.
Q: Rigid (concrete) waterproof roofing shop SBS coil can brush a layer of waterproof paint before?
Second, the completion of the construction of the membrane and the acceptance of qualified, should do the protection of finished products, it is recommended to use cement mortar to do protective layer, construction should pay attention to the surface should be smooth pressure, and set the surface sub-grid, 1 m2. If the use of block material to do the protective layer, the sub-grid area should not be greater than 100 square meters, sub-grid width should not be less than 20mm; if the use of fine stone concrete protective layer, the sub-grid area should not be greater than 36 square meters. Note: Regardless of which protective layer is used, a separation layer should be provided between the waterproofing layer and the protective layer.
We are specialized in the production and marketing of Waterproofing Materials and Machinery.

1. Manufacturer Overview

Location Hebei, China
Year Established 2004
Annual Output Value Above US$ 100 Million
Main Markets America; Europe; Asia; the middle east
Company Certifications ISO 9001

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a) Trade Capacity
Nearest Port Tianjin
Export Percentage 50% - 100%
No.of Employees in Trade Department 6 - 10 people
Language Spoken: English; Chinese
b) Factory Information
Factory Size: 20000 square meters
No. of Production Lines Above 5
Contract Manufacturing OEM Service Offered; Design Service Offered
Product Price Range

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

Hot products


Hot Searches

Related keywords