PE Waterproofing and Vapor Barrier Membrane
- Loading Port:
- Shanghai
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 2000 m²
- Supply Capability:
- 500000 m²/month
OKorder Service Pledge
OKorder Financial Service
You Might Also Like
PE Waterproofing and Vapor Barrier Membrane
Introduction:
Vapor insulation membrane is a roof membrane with three-layers, which is specially designed for application on ventilated pitched roofing, can be used under bituminous membrane as a extra protection for the attic insulation. It includes PET/PP non-woven fabric layer, PE/PP woven layer and aluminum foil layer. The three-layers structure ensure extreme resistance to tearing. Furthermore, the special stabilization additives ensure 3-month resistance to UV radiation.
Specification:
Chemical Composition | PP & PE, Aluminum Foil, Woven Fabric |
Roll Size | 1.5meter*50meter |
Density: | 60gsm~130gsm |
Tensile Strength | MD:150N/50mm; CMD:115N/50mm |
Waterproofing Rate | W1 |
Vapor Resistant Rate | 6.9g/m2 ▪ 24h |
Aging rate under hot circumstance (90℃*168h) | MD:90%; CMD:100% |
Typical Installation
Typical Application:
FAQ:
1. Where is your factory located in?
Our factory is located in Jiangsu province, close to Shanghai.
2. Have you ever been export?
Yes, our product has been exported to many countries.
3. Can we get samples?
Yes, we are free for samples, what you need to assume is freight charge.
- Q: Bathroom first leveling or do waterproof, what is the difference
- 2. Grass-roots waterproof, materials, local conditions, with particular attention to the wall and root and other vulnerable parts of the leakage, should do some special waterproof, plugging treatment. Stir the waterproof material, the first layer of the coating should be waterproof material scraper evenly coated on the base surface, the thickness of 0.6mm or more, to be uniform, the first wall after the operation, from the inside out of the operation , Can not have local deposition, leaving no bubbles, strong bonding. Ground waterproof layer should be painted out of the bathroom door outside the 300 wide, should be higher than the ground 200, shower wall waterproof layer should be higher than the ground 1800mm. The next brushing direction is perpendicular to the last time. The last time the film semi-curing, throwing coarse sand particles, easy to combine with the cement mortar in the future. To be dry after a few days to do closed water test, observe no leakage side good.
- Q: A complete set of basement waterproof construction program
- First, the basement of the external walls of water leakage project engineering basement waterproofing standard GB50108-2001 "underground engineering waterproof technical specifications" secondary waterproof rating. Basement exterior wall waterproof structure with self-waterproof concrete plus coil waterproof, 50 thick polystyrene board protective layer.
- Q: How to do waterproof bathroom, construction process is what
- 2, brush the second time waterproof coating. It should be noted that the first coating to be dry before the second brushing, the specific time depending on the product characteristics may be. If the interval is too short, the first pass of the paint has not been dry, waterproof effect will be greatly reduced.
- Q: What is the car waterproof sticker material?
- Engraving process car sticks A. knife engraving process: refers to the computer will be vector graphics input knife machine, the knife will be cut into a preset film shape, and then by hand will be different colors together Finished, and finally in the finished product posted on the surface of a layer of transparent transfer film, after the stickers to remove the stickers; due to knife car paste production process is complex, high cost of materials, currently only suitable for individual car and Che Youhui team Small customization
- Q: Find the construction steps for waterproof coatings
- 1, base surface treatment (1) roof structure After the completion of concrete pouring, should be repeated water compaction, so that the surface of the grass-roots level, the flatness with 2m to check the ruler, ruler and grass-roots gap of not more than 5 mm, and only allow gentle changes. (2) the base surface of the pores, rugged, honeycomb, gap, sand, etc., should be promptly treated, the base surface must be clean, no floating slurry, no water beads, no water; when the base surface appears more than 0.3 mm cracks , Should rush each 10 cm brushing 1 mm thick polyurethane coating waterproof layer, and then set the polyurethane cloth reinforcement layer, and finally brushing waterproof layer. (3) all the corners are used 5 × 5㎝ 1: 2.5 cement mortar for chamfering, the angle made R = 10 mm rounded corners.
- Q: What material is used for waterproofing of tarpaulin
- Cement-based waterproof paste (such as the Swiss Sika) Product category Cement-based materials non-toxic, environmentally friendly, both in the construction process also Is formed after the harmless to humans and animals.
- Q: Cabinet is to buy finished products, or directly to the decoration company to do?
- My home decoration cabinets are Haotian decorative package to do, although expensive, but still very worthwhile, all of their wood will be waterproof and moisture, in contact with the wall will do the underground waterproof and moisture, and are on-site cash Now do, timber materials can be seen directly, the amount of glue is not much, less formaldehyde, the latter part of the living is also more comfortable!
- Q: Roof for the insulation, Master roof, using two waterproof construction program
- Fourth, the finished product protection 1, has been laid the membrane waterproof layer, should be taken to protect the facilities, is strictly prohibited in the waterproof layer on the construction operations and transportation, and should be timely to do the protective layer of the waterproof layer. 2, through the roof, wall waterproof layer at the pipeline, construction and after the completion of damage shall not damage. 3, deformation joints, water, etc., before the construction of waterproof layer, should be temporary closure, waterproof layer is completed, should be cleared to ensure that the tube, sewn smooth, to meet the use of function. 4, roof construction shall not pollute the walls, cornices and other finished products.
- Q: FRP finished brush on what can be waterproof do not fade
- FRP appearance is the use of gel coat, we do the appearance of glass steel yacht are gel coat, also known as plastic shell, resin gel coat, etc., the color can be customized in the factory, Nanjing DSM company there.
- Q: Waterproof material water leakage construction should pay attention to what
- 2, wall treatment · Wall treatment to do about 300mm high waterproof coating, to prevent water infiltration wall back tide. · Bathroom between the wall and the ground (plane and elevation) brushing height should be greater than 100mm. · The height of the shower room in the bathroom is not less than 1800mm. · If there is a bathtub, the height of the wall adjacent to the bathtub should be 300mm higher than that of the bathtub. · Waterproof height of tub is not less than 800mm. · The height of the squat should be more than 900mm. For the transformation of the toilet wall and self-built light wall, the proposed height of the waterproof to do the top.
Send your message to us
PE Waterproofing and Vapor Barrier Membrane
- Loading Port:
- Shanghai
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 2000 m²
- Supply Capability:
- 500000 m²/month
OKorder Service Pledge
OKorder Financial Service
Similar products
Hot products
Hot Searches
Related keywords