• Diffusion Roofing Foils System 1
  • Diffusion Roofing Foils System 2
  • Diffusion Roofing Foils System 3
Diffusion Roofing Foils

Diffusion Roofing Foils

Ref Price:
get latest price
Loading Port:
China Main Port
Payment Terms:
TT OR LC
Min Order Qty:
-
Supply Capability:
-

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

Specifications

ceiling roof material1.5mx50m
Waterproof Class W1
SD-value 0.02m
Vapor permeability: 2250g/m2/24h
UV re

1) Introduction of  ceiling roof material

  1.    Breathable Membrane is a water resistant membrane but with high vapour permeability, use as diffusion open roofing felts under pitched roof tile or vapour permeable barrier housewraps on timber frame walls

  2.    Breather membrane functions as a weather-resistant barrier, preventing rain from getting into the roof or wall assembly while allowing water vapor to pass to the exterior.

  3.    Breather membrane may also serve as an air barrier if it is sealed carefully at seams.

  4.    Breathable Membrane have good "water resistance", good "water vapor permeability", and good "air barrier properties".

2) ceiling roof material Specification
13-layers laminatedPP nonwoven+PE film+PP nonwoven
2Products range80g,90g,100g,120g,140g,160g/m2.
3Roll size1.5m x 50m
4Water resistantClass W1
5SD-value0.02m
6Vapor permeability>2250g/m2/24h
7UV resistant>3month
8Test to EN13859-1Pass -- CE mark available

3)Key Features of ceiling roof material

1CE certificated, high quality with competitive price
2Waterproof & vapour permeable
3Excellent tensile and nail tear strength
4Good flexibility and ductility
5Light weight and thin, slip-resistant surface
6Simple handling and easy to use
7Energy saving
8Long term durability
9Totally recyclable
10For both wall and roof applications


Q: Slope roof drains do not need to be waterproof
The overall rigid waterproof layer is often due to these small structural nodes handled properly, resulting in the failure of the entire roof waterproof.
Q: A complete set of basement waterproof construction program
First, the basement of the external walls of water leakage project engineering basement waterproofing standard GB50108-2001 "underground engineering waterproof technical specifications" secondary waterproof rating. Basement exterior wall waterproof structure with self-waterproof concrete plus coil waterproof, 50 thick polystyrene board protective layer.
Q: How to do waterproof bathroom, construction process is what
3, shop protective layer. In order to prevent the subsequent construction damage to the waterproof layer, the need to cover the surface of the waterproof coating protective layer. Protective layer to completely cover the waterproof layer, no missing, with the grass-roots combination of solid, no cracks, no bubbles, no shedding phenomenon.
Q: What decoration materials, light and water, and the wall, the perfect combination of glass
Five, scraping gum The excess residue of the material to be scratched, scraping plastic tool angle consistent, at one go, scraping gum immediately after the completion of tearing tape or grain pattern paper. Remove the excess glass compound, if stains, can be removed with a damp cloth. Six, finished product protection Do not touch within 24 hours, do not press within 48 hours.
Q: Find the construction steps for waterproof coatings
2, waterproof layer construction sequence and methods (1) base surface treatment and acceptance of qualified, and now Yin, Yang angle and construction joints and other special parts brushing waterproof coating layer, strengthen the layer 1 mm, strengthen the layer after brushing, immediately paste fiberglass cloth or 30 ~ 40g / ㎡ polyester cloth reinforcement layer, is strictly prohibited to strengthen the surface layer and then paste the reinforcement layer material. (2) to strengthen the layer of hard work, began to brush a large waterproof layer, waterproof layer using multi-channel (3 to 5) brushing, brushing the upper and lower coating should be perpendicular to each other. When the surface of the coating is completely cured (not sticky hands) before the next curtain coating construction. (3) polyurethane coating waterproofing layer after the completion of the experience of acceptance, the timely application of the waterproof layer of the protective layer, the plane protective layer with 7 cm thick fine stone ㎝, in the pouring of fine stone before the need to cover the waterproof layer A layer of 350 # paper tire linoleum insulation layer. Facade waterproof layer (such as anti-beam facade) with a thick 6 mm polyethylene foam protection (expansion ratio of not more than 25 times).
Q: Do you use the waterproof material on the building to be harmful to the human body?
Of course harmful, not just this particle, there are auxiliary materials are also toxic.
Q: Oriental rain rain waterproof how to
Strict selection and the pursuit of excellence in product performance of the East Rainbow waterproof coating long-term waterproof material in the market leading the main reason. In order to test product performance, the East Rainbow company to the product to the plateau, desert, alpine, high temperature and other areas for testing.
Q: Roof leakage, what materials do the best waterproof
First, the roof leak to find the first leak, looking for the main leak from the roof to the lower to find leakage. The first is to see if there is no cracks in the roof, the original waterproof layer is not aging, the roof of the original SBS waterproofing membrane has no bubbles, there are bubbles to prove that the water has entered the bottom of the waterproof layer, and thus leaking. There is a block on the roof of the gutter is not blocked in the countryside, there are still a large number of tile-roofed house, when the tiles due to damage caused by the roof leakage, as long as the replacement of tiles can be, this step is also known as "
Q: Roof for the insulation, Master roof, using two waterproof construction program
Construction of roof waterproofing membrane First, the process (hot melt construction) Clean up the grass-roots → brushing the primary treatment agent → paving the film additional layer → paving the film → hot melt sealing side → water test → protective layer
Q: Villa roof leakage what general reasons, what materials to remedy
Fourth, the roof of a large area of ??leakage or a number of water leakage points, the first by the professionals to check whether the cracks, according to the previous program to deal with the cracks in the roof covered with waterproof membrane, to enhance the waterproof effect, but also And then covered with insulation board, because the height of the insulation board in 20 cm or more, to achieve the protection of waterproof layer and thermal insulation of the double effect. Wall cracks appear seepage, under normal circumstances the professional construction team will use the basket, by the maintenance staff in the external wall construction.

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

Hot products


Hot Searches

Related keywords