Tower Crane TC7135 Construction Machiney
- Loading Port:
- China main port
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 1 set
- Supply Capability:
- 15 set/month
OKorder Service Pledge
OKorder Financial Service
You Might Also Like
Introduction:
Tower crane is used to lift, lower and horizontally move materials in construction and other industry. It has large lifting capacity and lifting height, wide moving range, and can rotate. It basically consists of base foundation, mast, slewing unit, working jib, counter jib, counterweight, hook, and operating cabin.
Features:
1. It has high working speed, good speed-adjusting performance, steady operation and high efficiency. Three-speed motor and mono-speed ratio decelerator are applied in the lifting struction, which enables heavy load low speed and light load high speed.
2. The range-change structure drives the dolly to change range on the horizontal arm, with good positioning performance. Planet gear decelerator is applied in the circumgyrating structure, together with moment-limiting hydraulic coupler, which can relize high load capacity, steady starting and reliable operation.
3. The crane has complete set of safety devices, which can guarantee the safe and high efficienct operation of the equipment. The machine is equipped with lifting height limiter, dolly range-change limiter, moment limiter, weight limiter, circumgyrating limiter, etc.
4. The operator's room is set independently on one side, with good vision field. It creates a good working environment for the operator.
5. Provide stepless speed regulation. Outstanding in working efficiency, operating stability and reliability,
6. The height can accordign to the actual height of the building and at the same time unchange the lifting capacity.
Specifications:
- Q:With hi-rise buildings being constructed left and right, i was just wondering, how do they raise cranes? this has really been bugging me for a time now..
- Tower cranes are usually erected in one of two ways. You could lift the parts into place with a mobile crane with a telescopic boom which is taller than the crane being built. Some people ask why you dont just use the mobile crane all the time, but the tower crane has higher lifting capacity, longer reach and is cheaper. Some tower cranes are assembled at ground level. The long boom, cab and counter weight are assembled and then jacked up off the ground. A small bit of tower is then sliped in beneath the assembly and attached. The crane is the jacked up again and another portion of the tower sliped in. This is repeated until the desired height is reached. The first method is the most common.
- Q:from the legend of sleepy hollow, his background, characater, personality, life etc.
- uhh...by reading sleepy hollow?
- Q:The special equipment specified by the state is a periodical inspection cycle, wherein the crane is carried out every many years
- Special equipment including boilers and pressure vessels (including gas cylinders), pressure piping, elevator, crane, field (factory) in special vehicles, large recreation facilities, passenger ropeway, regular inspection period of their different. The periodic inspection period of hoisting machinery is usually two years.
- Q:please help i need it for a project
- Ichabod Crane is a fictional character in Washington Irving's short story The Legend of Sleepy Hollow
- Q:did stephen crane win any awards?
- Stephen Crane (November 1, 1871 – June 5, 1900) was an American novelist, short story writer, poet and journalist. Prolific throughout his short life, he wrote notable works in the Realist tradition as well as early examples of American Naturalism and Impressionism. He is recognized by modern critics as one of the most innovative writers of his generation.
- Q:I just wonder they use cranes at such heights, how do they carry the cranes at such height? Helicopter or something? This is a picture of what I'm talking
- The cranes are jack-up cranes. They have their own self-contained jacks. As one floor is completed, they jack up to the next level. The cranes are on top of the buildings. They are designed by structural and mechanical engineers to loift a given weight.
- Q:A crane lifts a 425 kg steel beam vertically a distance of 117m. How much work does the crane do on the beam if the beam accelerates upward at 1.8 m/s^2? Neglect frictional forces.a.) 3.4 x 10^5 Jb.) 4.0 x 10^5 Jc.) 5.8 x 10^5 Jd.) 4.9 x 10^5 JSolved as W= mgh but obviously that is wrong. Where do I go wrong?
- Force=mass x (acceleration) -Gravity must be taken into account F=425 x (1.8 -(-9.8)) F=4930 w= F x deltay w= 4930 x 117 w=576810J
- Q:please tell me thats not what i think it is O_O
- Omg! What primer is it? That sounds really fishy...
- Q:I have a question about cranes...does anyone know what the maiximim weight is that they can lift. A friend and I were discussing this and i was just wanting to know if anyone might have the answer. Thanks guys
- Do not know where you live but I worked in a Shipyard in South Mississippi That had Cranes which picked up Modules which weighed 100 tons. Most were in the range of 50 to 70 tons the limiting factor was the range of the lift away from the crane. The further away from the Crane the less the load limit but the Cranes were rail mounted so they could traverse and carry the load anywhere. We had one Crane capable of handling 500 tons, a real monster. These are all located at Pascagoula Mississippi. Most were imported from Germany.
- Q:i am looking for the schematic wiring diagram for GANTRY CRANE AC GENERATOR. thanks a lot
- it sounds like you want to run a gantry crane with a generator the generator should have a wire diagram in side the cover. the gantry crane should have the power requirements on the electric motor there should be a tag on the motor. If you are not sure then you need to get an electrician out there to look at the two components and should be able to get you straight
1. Manufacturer Overview |
|
---|---|
Location | |
Year Established | |
Annual Output Value | |
Main Markets | |
Company Certifications |
2. Manufacturer Certificates |
|
---|---|
a) Certification Name | |
Range | |
Reference | |
Validity Period |
3. Manufacturer Capability |
|
---|---|
a)Trade Capacity | |
Nearest Port | |
Export Percentage | |
No.of Employees in Trade Department | |
Language Spoken: | |
b)Factory Information | |
Factory Size: | |
No. of Production Lines | |
Contract Manufacturing | |
Product Price Range |
Send your message to us
Tower Crane TC7135 Construction Machiney
- Loading Port:
- China main port
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 1 set
- Supply Capability:
- 15 set/month
OKorder Service Pledge
OKorder Financial Service
Similar products
Hot products
Hot Searches
Related keywords