Tower Crane TC7135 ConstructionEquipment Building Machinery
- Loading Port:
- China main port
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 1 unit
- Supply Capability:
- 5 unit/month
OKorder Service Pledge
OKorder Financial Service
You Might Also Like
Tower Crane TC7135 Description:
1.CMAX Tower Crane TC7135 is one of the main product of CNBM company, which have competitive price and excellent quality, suitable for all kinds of construction project and can work under all kinds of work condition.
2. Tower Crane TC7135 can adopts standard section hydraulic lifting and connecting, and can decide the crane height according to the actual height of the building, and at the same time the lifting capacity will not be affected.
3. Tower Crane TC7135 has high working speed, good speed-adjusting performance, steady operation and high efficiency. Three-speed motor and mono-speed ratio decelerator are applied in the lifting struction, which enables heavy load low speed and light load high speed.
4.Tower Crane TC7135 has complete set of safety devices, which can guarantee the safe and high efficienct operation of the equipment. The machine is equipped with lifting height limiter, dolly range-change limiter, moment limiter,weightlimiter,circumgyrating limiter,and so on.
5.Tower Crane TC7135 has scientific layout and beautiful appearance. The operator's room is set independently on one side, with good vision field. It creates a good working environment for the operato.
Tower Crane TC7135 Parameter:
Max. working range 71m, tip lifting weight 3.5T and Max. lifting weight 16T.
Hoisting mechanism fitted with three speed motor, stable braking and less shock when shifting.
Trolleying mechanism can provide two operation speeds.
Free standing height (m) 50
Max height with attachment (m) 200
Working range can be adjusted (m) 50、55、60、65、71
Min working range (m) 2.5
Max lifting capacity (t) 16
Tip load @ 50m (t) 3.5
Tower Crane TC7135 Packaging & Delivery:
40HQ container
20~25days after deposit
Tower Crane TC7135 Diagram:
Tower Crane TC7135 Technical Sheet:
Tower Crane TC7135 FAQ:
1.What is tower crane?
Tower crane is a modern form of balance crane that consist of the same basic parts. Fixed to the ground on a concrete foundation (and sometimes attached to the sides of structures as well), tower cranes often give the best combination of height and lifting capacity and are used in the construction site.
2. What is the meaning of the tower crane’s code?
Take Tower Crane TC7135 for example, the first two letters “TC” means Tower Crane, “71”means jib length is 71 meter, and the last two letter “35” means the tip load is :3.5 ton.
3. What is the principal to quote the right tower crane to the client?
First, we need to know clients’ requirements,for example, max lifting capacity, height, tip load and jib length.. Second, we need to know what the foundation requirement from the client is and Third if there are special needs. CNBM could suggest proposal according to clear data provided by the clients.
- Q: Does anyone know where I can order Sugar Crane to grow?
- Crane? anyway,, if your store has those little pieces you can buy to eat? or if you know someone with canes,, you strip off the hard outer covering,, this has the seed buds,, plant these in 3 inches of soil and wait,, cane is slow growing!! if you google sugar cane growing or go to wikipedia you will find plenty of info google buy sugar cane seeds you will find sites to order!!
- Q: Just wondering i am so confused
- It's a crane thing. Seriously though - overhead crane, gantry or polar crane!
- Q: Are tower cranes the same as tower cranes?
- Tomato, you tomato, potatoes, you potatoTalent exchange of tower crane and tower crane
- Q: What can paper crane symbolize?
- the crane is for the life that goes on after you leave earth
- Q: how does the power electronic drives employed in cranes?
- The primary function of an electronic drive is to provide for operation at various speeds. Slow speed operation is used when moving a load into position. Faster speeds are used for moving loads over longer distances. When the operating speed is steplessly adjustable, ramped acceleration and deceleration control is easily provided as well. Controlled acceleration provides smoother operation because acceleration at a constant rate means accelerating with a constant force or torque. Electronic drives control torque and current during starting. They perform a function similar to a reduced voltage motor starter, but they do it steplessly, more efficiently, with more complete control of applied torque. They provide more torque per ampere of current than any other starting method. This is very beneficial for the frequent starting and stopping often required for cranes. Electromechanical motor controls for cranes require additional contactors, relays and other components to perform functions such as reversing, motor overload protection and braking. These functions are incorporated into the electronic controls with electronic drives. Electronic braking can return energy to the power supply and bring the load to nearly a complete stop before a friction brake is applied. For holding the load in position, an electromechanical brake is still required. Electronic drives can be used on bridge, trolley and hoist applications.
- Q: Information of distributor or manufacturer for Crane Lake Cellars will be helpful too.
- There okorder /... There are two other Crane wineries. Crane Family and Crane Canyon, but they are independant wineries and have no connection to Crane Lake Cellars. (as far as I know). You can give Bronco Wine Company a call and check - they have a toll-free number. and should be able to tell you a distributor.
- Q: When making 1000 origami cranes, do all of them have to be the same size? I already made some of varying sizes. Does it matter? I hope not.Thank you.
- I don't believe there are any size restrictions, the main requirement is that there be 1000 of them. Since a lot of origami paper is prohibitively expensive to buy in large amounts, you'll probably be better off folding with whatever is convenient to you. This also frees you up to fold wherever and whenever you like, without having to lug around a certain size paper or a ruler and scissors. For instance, Sadako Sasaki, the famous Japanese school girl who attempted to fold 1000 cranes before her death from raditation-induced leukemia, had to fold with whatever paper was close to her - spare bits of medicine wrappings, napkins, candy wrappers, and wrapping paper from get-well presents.
- Q: A heavy concrete panel is being lifted into position in a building by means of a crane (see figure below). The tension of 1.78 x 10^4 N in the supporting cable produces a torque with respect to point O. (Let L = 46.3 m.)
- The crane contributes a torque of 495,979.8 Newton-meters. 1.78e+4 * 46.3 * cos(53.0) = 495,979.8 ...but this is not the total (net) torque. There is also a torque due to the weight of the concrete slab - torque we are ignoring since we do not know the weight of the slab.
- Q: I can't find anything about this online, and I've never heard of it before.... I'm looking nearby for a Karate club to join, and came across this.I've heard of white crane kung fu, but not karate...
- Frank and Mito are right IMHO. It is probably a style linking itself to the past. Hopefully, it isn't just linking itself to the Karate Kid..ha ha. And it probably is on the up and up... but I would be careful anyways. This decision can affect your training for years. Good luck!
- Q: do they start with the crane house and keep adding sections underneath it? Or do they build they tower and then somehow top it with the actual crane?
- I'm sorry, but there is no way that a crane can lift another section of itself up in the manner described by the first person (lift another 20-foot mast section into the gap opened by the climbing frame). Can you lift yourself off the ground by pulling up on your own collar? I was told that the crane is jacked up from the bottom, and they slide another section below the jacked up crane. Then they lower and bolt the crane to the new section that was inserted under the bottom.
Send your message to us
Tower Crane TC7135 ConstructionEquipment Building Machinery
- Loading Port:
- China main port
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 1 unit
- Supply Capability:
- 5 unit/month
OKorder Service Pledge
OKorder Financial Service
Similar products
Hot products
Hot Searches
Related keywords