• Tower Crane TC7135 ConstructionEquipment Building Machinery System 1
  • Tower Crane TC7135 ConstructionEquipment Building Machinery System 2
  • Tower Crane TC7135 ConstructionEquipment Building Machinery System 3
  • Tower Crane TC7135 ConstructionEquipment Building Machinery System 4
Tower Crane TC7135 ConstructionEquipment Building Machinery

Tower Crane TC7135 ConstructionEquipment Building Machinery

Ref Price:
get latest price
Loading Port:
China main port
Payment Terms:
TT OR LC
Min Order Qty:
1 unit
Supply Capability:
5 unit/month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

Tower Crane TC7135 Description:

1.CMAX Tower Crane TC7135  is one of the main product of CNBM company, which have competitive price and excellent quality, suitable for all kinds of construction project and can work under all kinds of work condition.

2. Tower Crane TC7135 can adopts standard section hydraulic lifting and connecting, and can decide the crane height according to the actual height of the building, and at the same time the lifting capacity will not be affected.

3. Tower Crane TC7135 has high working speed, good speed-adjusting performance, steady operation and high efficiency. Three-speed motor and mono-speed ratio decelerator are applied in the lifting struction, which enables heavy load low speed and light load high speed.

4.Tower Crane TC7135  has complete set of safety devices, which can guarantee the safe and high efficienct operation of the equipment. The machine is equipped with lifting height limiter, dolly range-change limiter, moment limiter,weightlimiter,circumgyrating limiter,and so on. 

5.Tower Crane TC7135  has scientific layout and beautiful appearance. The operator's room is set independently on one side, with good vision field. It creates a good working environment for the operato.


Tower Crane TC7135 Parameter:

 Max. working range 71m, tip lifting weight 3.5T and Max. lifting weight 16T.

Hoisting mechanism fitted with three speed motor, stable braking and less shock when shifting.

Trolleying mechanism can provide two operation speeds.

Free standing height (m) 50

Max height with attachment (m) 200

Working range can be adjusted (m) 50、55、60、65、71

Min working range (m) 2.5

Max lifting capacity (t) 16

Tip load @ 50m (t) 3.5

Tower Crane TC7135  Packaging & Delivery:

40HQ container

20~25days after deposit


Tower Crane TC7135 Diagram:

Tower Crane TC7135 ConstructionEquipment Building Machinery

Tower Crane TC7135 ConstructionEquipment Building Machinery

Tower Crane TC7135 Technical Sheet:

Tower Crane TC7135 ConstructionEquipment Building Machinery

Tower Crane TC7135 FAQ:

1.What is tower crane?

Tower crane is a modern form of balance crane that consist of the same basic parts. Fixed to the ground on a concrete foundation (and sometimes attached to the sides of structures as well), tower cranes often give the best combination of height and lifting capacity and are used in the construction site.

2. What is the meaning of the tower crane’s code?

Take Tower Crane TC7135 for example, the first two letters “TC” means Tower Crane, “71”means jib length is 71 meter, and the last two letter “35” means the tip load is :3.5 ton.

3. What is the principal to quote the right tower crane to the client?

First, we need to know clients’ requirements,for example, max lifting capacity, height, tip load and jib length.. Second, we need to know what the foundation requirement from the client is and Third if there are special needs. CNBM could suggest proposal according to clear data provided by the clients.

Q:Hi,I am looking for study for Design, Calculation and selection of Overhead Crane supporting Columns. (Not the Crane runner way beams ) Could you please suggest me the suitable references on internet?Thank You !
See okorder /
Q:I don't like the cranes that use a wired pulley systems for controlling the camera.The crane will need to carry a 7 pound camcorder.
Camera okorder /
Q:heres a picture of one
they are put up section by section with another crane
Q:What is the Tower crane Roadb track laying criteria?????????
The okorder ) track in the vertical and horizontal direction is not more than 1 / 1000. (we Should use the standard instrument, two tracks, and keep in10m range ,Measuring not less than 3 periods, respectively,taking the average).
Q:What were Henry's reasons for becoming a soldier? What about the war was so attractive to him?Why do you think it took Henry so long to begin contemplating his part in battle?How do Jim and Wilson respond to Henry's question? What does this tell you about them?Share your thoughts...
Henry begins the book as an idealistic and completely self-absorbed teenager who wants nothing more than a chance to show off and be thought of as a brave and daring male. From Shmoop
Q:What is the most amount of weight lifted by any crane?
Depends on the capacity of crane...there is no standard for it
Q:hes been here for about 3 years. i want to feed him but i don't know what it eats. is there any way i could help him eat? i think he is going to die if we destroy the last of the forest area where we live.
Want to help? Don’t feed them, which draws them deeper into dangerous urban areas. And try to keep reflective surfaces covered. Following these tips could keep these majestic citizens a little safer. In 2002, the Florida Fish and Wildlife Conservation Commission made it illegal to feed sandhill cranes. Why Is Feeding Cranes A Bad Idea? Cranes fed by humans can become aggressive toward people. In several instances, children have been attacked by cranes. Cranes fed by humans also have been known to damage window screens and do other property damage. This behavior is probably a response of the birds to seeing their reflection, bringing out a territorial defense behavior (scratching at windows or shiny automobiles). Cranes also are more likely to tangle in human garbage in areas populated by people. Cranes attracted to people's yards for feed are put at risk as they walk across roads. Many sandhill cranes are killed each year on Florida roads. Cranes are also more likely to crash into power lines in urban areas where such aerial hazards are concentrated. Attracting cranes to urban areas increases the threat of predation (especially to young cranes) by dogs or cats. Further, the cranes' diets, which normally are quite diverse, are disrupted when they eat one food item (such as corn), consistently. Heavy pesticide use in urban lawns also is of concern. Young sandhill cranes have died from pesticide poisoning. It's Never a Good Idea to Feed Wildlife People inadvertently put cranes in harms way when they attract these birds with feed. Florida sandhill cranes have an abundance of natural foods (insects and small animals) and they do not need handouts from humans. There are many reasons why cranes should not be intentionally fed by humans, so I hope this gives you a few you can communicate to these well-intentioned people. The bottom line message: For the good of the cranes, please do not feed them.
Q:It frustrates me every time I play one of those games i never win. Is there a secret? If so then what is it?
It depends which type of animal crane you are talking about. If it's the jumbo cranes that pick up the huge stuffed animals, they are actually set to give out a win every so many plays, however the number of the winning play varies based on the location. If you are talking about the average sized cranes, the key is to look for a stuffed animal that is light up on top and bottom heavy. This will allow you to grab ahold of the head or neck and pick the animal up. I've found the easiest cranes to win on are the ones that you pick up beanie baby sized stuffed toys. They seem to win, every time you aim the crane to pick up the head or neck. It's a great way to rack up a lot of stuffed animals. While they may not be huge prizes they are reasonable ones, and some of them are pretty cute.
Q:Tower crane 10-5-20 is 6T, and 10-5-21 is 8T. What do you mean by tons?
6T/8T refers to the maximum lifting capacity of a tower crane. It doesn't matter what 10-5-20 has to do with it. Maybe your list of numbers is serial number.
Q:Synopsis for the poem Lost Dances Of Cranes?
If this is the poem, you will find several comments at the link provided. Your fields are empty now. Only your ghosts dance while cranes of another kind dance cities into being. All that remain of you are a fading crackle of your energy and some grainy video footage that people in the new cities will watch to marvel at the wonders the world once held. craftygreenpoet.blogspot .uk/20...

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

Hot products


Hot Searches

Related keywords