• Luffing Tower Crane TCD6029 16T manufacturer System 1
  • Luffing Tower Crane TCD6029 16T manufacturer System 2
  • Luffing Tower Crane TCD6029 16T manufacturer System 3
  • Luffing Tower Crane TCD6029 16T manufacturer System 4
  • Luffing Tower Crane TCD6029 16T manufacturer System 5
Luffing Tower Crane TCD6029 16T manufacturer

Luffing Tower Crane TCD6029 16T manufacturer

Ref Price:
$40,000.00 - 200,000.00 / unit get latest price
Loading Port:
China main port
Payment Terms:
TT or LC
Min Order Qty:
1 unit
Supply Capability:
30 unit/month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

 Quick Details of TCD6029  Luffing Tower Crane


Feature: Tower Crane                          

Condition: New                                          

Max.Lifting Load: 16T

Place of Origin: China(Mainland)          

Model Number: TCD6029       

 

Packaging & Delivery of TCD6029  Luffing Tower Crane


Packaging Detail: Nude package          

Delivery Detail: 25-30days


Images of TCD6029  Luffing Tower Crane

 

 

FAQ of TCD6029  Luffing Tower Crane

 

Q: What is the principal to quote the right tower crane to the client?

A: First, we need to know clients’ requirements. Normally the following information should be clarified by the client: max lifting capacity, height (height under hook), tip load and jib length.

Second, we need to know what the foundation requirement from the client is. (Fixed/undercarriage/ undercarriage with traveling system), mast section type (panel/integrated), power supply source (voltage, ampere and frequency), the distance between the machine and power supply……

Third if there are special needs, we could suggest proposal according to clear data provided by the clients. End-user, as construction machinery buyer, knows the site situation well and should make decision, such as the machinery specification, type…….

 

Q: What about our tower crane's warranty?

A: Usually there is one-year quality warranty including main electronic parts (not including consumable parts). There are consumable spare parts together with whole machine and normally they are enough for one year.

 

Q: What is 3 main mechanism of the tower crane?

A: there are trolleying mechanism/ slewing mechanism/ hoisting mechanism.

 

Q: Can you equip with light on tower crane jib, monitor, remote control and anemometer?

A: Sure. All of these could be provided with extra cost upon the clients’ requirements. But according to general practice, remote control is not suggested because most of the operator feedback operation in the cabin will provide a wide working view.



 

To Lead The Revoluation of International Trade


Q:I'm a bit confused as to what happened to him. I guess I skimed a bit at a certain important part of the book. When Seneca Crane's name was written on the dummy during training, why did the people gasp at the name written in berry juice? What happened to him? PS. I am at the begining of Mockingjay. So no spoilers please. (:
Seneca Crane was the head gamemaker in for the 74th Hunger Games. President Snow had him hung because he changed the rules to allow both Katniss and Peeta to win.
Q:What are the four major moving mechanisms of a tower crane?
The metal structure includes the tower, the boom and the base. The working mechanism has four parts, lifting, luffing, turning and walking.There are many types of tower crane, if according to whether the walking mechanism, there is a fixed type and operation type; according to the tower structure is divided into rotary, inferior type, attached itself three; if divided by the amplitude, a trolley type, luffing type and folding arm luffing type three; according to the weight division, with light and medium and heavy three.
Q:Yeah, I think I know what cranes are used for. But in the context of building an apartment and so on, what is the role derricks there. And why is called cranes and derricks - What is the correlation between them.
Cranes are used for lifting heavy equipment. Derricks are used to drill for oil. They are two different things.
Q:some people call it a crane, others say claw but the point is...where can i get one? i dont want a huge one, and i dont want a small one. A medium size one. the shops have to get them from somewhere right? oh, and i'd rather not get one from Ebay. is there a business or something? thank you!
You can buy that stuff at gamig stores that sells alot of gaming equipment
Q:Do they need another crane to get the concerete blocks to the top? And how do they move the blocks from one end of the crane to another. This has been bothering me for some time so anyone who knows the answer I would love to hear it!
Its simple man, The company produces the concrete blocks called as hollow blocks also, they are lifted up using man power or lifts or cranes, dont know what was difficult to you in understanding that.
Q:What makes a crane so strong?
Cranes are built using a structural technique called a truss which is characterized by looking like a series of triangles connected together. That structure prevents the members from having to resist any bending loads. All of the truss members experience only tension and compression, no bending. That is an extremely efficient structure which is why they can be so strong without being monstrously heavy. Or if you prefer the short answer, engineers make the crane so strong.
Q:What should be included in the disassembly plan of the tower crane?
- 2 - (1)Project and safety supervisor with safety certificate and mechanical management personnel.(2)Construction crane with qualification certificate for construction operationMachinery installation, disassembly, lifting, signal workers, electricians, lifting drivers, cable operators and other special operations personnel.The above constructors shall fill in the name, type of work and qualification number of the constructors.11 、 installation procedure and safety quality requirement;In strict accordance with the tower crane product specifications, installation procedures and safety quality requirements of the implementation of the organization of safety construction technical disclosure and signature confirmation.12, installation self-test;After installation, the installation of the unit with the installation quality testing, debugging safety device and complete self-test report.13, major sources of risk and safety technical measures14, emergency plans and so on
Q:I am sick and tired of sitting in my room scared looking at a crane fly bouncing around mu walls like its on crack , is there anything i can do to keep the c*nts out
Yeah i know what you mean regarding these flying critters as i get them all the time ;-( All you can do is keep your windows closed and hope for the best ....but 1 or 2 always seem to find a way in.....and then when its dark and your in bed they can even flutter around your face..... If you do find a way to stop them.................................let me know ;-) www.fcps.edu/islandcreekes/ecolog...
Q:science project
hydraulic
Q:for example: erection, technical data...
Well now Slartybardfast may be tried lol but he is correct give him the points lol.

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

Hot products


Hot Searches

Related keywords