• Tower Crane TC7135 ConstructionEquipment For Building Machinery System 1
  • Tower Crane TC7135 ConstructionEquipment For Building Machinery System 2
  • Tower Crane TC7135 ConstructionEquipment For Building Machinery System 3
  • Tower Crane TC7135 ConstructionEquipment For Building Machinery System 4
  • Tower Crane TC7135 ConstructionEquipment For Building Machinery System 5
  • Tower Crane TC7135 ConstructionEquipment For Building Machinery System 6
Tower Crane TC7135 ConstructionEquipment For Building Machinery

Tower Crane TC7135 ConstructionEquipment For Building Machinery

Ref Price:
get latest price
Loading Port:
China main port
Payment Terms:
TT OR LC
Min Order Qty:
1 unit
Supply Capability:
5 unit/month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

Tower Crane TC7135 Description:

1.CMAX Tower Crane TC7135  is one of the main product of CNBM company, which have competitive price and excellent quality, suitable for all kinds of construction project and can work under all kinds of work condition.

2. Tower Crane TC7135 can adopts standard section hydraulic lifting and connecting, and can decide the crane height according to the actual height of the building, and at the same time the lifting capacity will not be affected.

3. Tower Crane TC7135 has high working speed, good speed-adjusting performance, steady operation and high efficiency. Three-speed motor and mono-speed ratio decelerator are applied in the lifting struction, which enables heavy load low speed and light load high speed.

4.Tower Crane TC7135  has complete set of safety devices, which can guarantee the safe and high efficienct operation of the equipment. The machine is equipped with lifting height limiter, dolly range-change limiter, moment limiter,weightlimiter,circumgyrating limiter,and so on. 

5.Tower Crane TC7135  has scientific layout and beautiful appearance. The operator's room is set independently on one side, with good vision field. It creates a good working environment for the operato.


Tower Crane TC7135 Parameter:

 Max. working range 71m, tip lifting weight 3.5T and Max. lifting weight 16T.

Hoisting mechanism fitted with three speed motor, stable braking and less shock when shifting.

Trolleying mechanism can provide two operation speeds.

Free standing height (m) 50

Max height with attachment (m) 200

Working range can be adjusted (m) 50、55、60、65、71

Min working range (m) 2.5

Max lifting capacity (t) 16

Tip load @ 50m (t) 3.5

Tower Crane TC7135  Packaging & Delivery:

40HQ container

20~25days after deposit


Tower Crane TC7135 Diagram:

Tower Crane TC7135 ConstructionEquipment For Building Machinery

Tower Crane TC7135 ConstructionEquipment For Building Machinery

Tower Crane TC7135 Technical Sheet:

Tower Crane TC7135 ConstructionEquipment For Building Machinery

Tower Crane TC7135 FAQ:

1.What is tower crane?

Tower crane is a modern form of balance crane that consist of the same basic parts. Fixed to the ground on a concrete foundation (and sometimes attached to the sides of structures as well), tower cranes often give the best combination of height and lifting capacity and are used in the construction site.

2. What is the meaning of the tower crane’s code?

Take Tower Crane TC7135 for example, the first two letters “TC” means Tower Crane, “71”means jib length is 71 meter, and the last two letter “35” means the tip load is :3.5 ton.

3. What is the principal to quote the right tower crane to the client?

First, we need to know clients’ requirements,for example, max lifting capacity, height, tip load and jib length.. Second, we need to know what the foundation requirement from the client is and Third if there are special needs. CNBM could suggest proposal according to clear data provided by the clients.

Q: I am going to make 1000 paper cranes like Sadako Sasaki did. I am doing it to remember the victims of hiroshima and nagasaki and all the others who died as a result of wwii. especially sadako sasaki who, though she died in 1955, she was poisoned by the toxic gases in hiroshima. what do you think of my project, and got any tips to help?
Aw, it somewhat is particularly stunning! And the attempt will raise your spirits, i'm particular. From what i can discover, they are oftentimes strung at the same time, 25 strings of 40 cranes each and each. Then the 25 strings are tied at the same time and the mass would be hung up. putting them interior the water is a foul concept for the water. that is an incredible form of soggy, colored paper polluting the water, so i wouldn't try this. purely a tenet, i could string them as is classic, and while your mom has enjoyed them a jointly as, donate them to an area charity like a infant's wellness facility. wish your mom has extra stable days than undesirable, and that if she would be able to be cured, she's cured quickly! Oh, no, they do no longer take in an incredible form of room. bypass examine the wiki article on 1000 cranes and you will see %.. They carry at once down, and take in little or no room.
Q: What does tower crane jacking up mean?
Attached tower crane upper work structure and the lifting sleeve frame connected to the lifting sleeve frame is installed on the lifting jack.
Q: 3years after I quit a job,I am once again looking toward the same field it's just that in my old job they helped me get a crane license when I left the job they kept my certification .How can i get that info without asking my old work for it,or would i have to take the course over?
There is actually no such thing as a crane operators licence - you should tell your new employer that you had undertaken a course in your previous employment and were authorised by them to operate their cranes. The new employer will most likely then send you on another course and issue you with their operators authorisation. The authorisation from your old employer is not transferable to the new one so not having the certificate is not a major problem. It is however good practice for employees to receive a copy of the certificate for their own records.
Q: Are tower cranes the same as tower cranes?
Tomato, you tomato, potatoes, you potatoTalent exchange of tower crane and tower crane
Q: Lifting tower crane tower more than 45 meters, the demolition cost and how to adjust the field Sinotrans transportation fees?
Self lifting tower crane tower 45 meters high to prevail, such as height of over 45 meters, each increased to 10 meters (less than 5 meters, excluding) demolition costs increase 20%, off-site transportation costs increased by 10%.
Q: The mansion I'm talking about is made in the American colonial architectural style, it is made from red bricks and has a colossal white, Doric octastyle portico. There are many windows and French doors at the front and it is situated at the top of a neatly manicured hill.
the okorder /... i hope you find the name after all .
Q: I've been watching Passions for years and I don't understand what in the world is going on between Fancy and Pretty Crane... what did Pretty do to her??
It has something to do with Fancy taking a boy away from Pretty that she liked a lot when they were younger. You know Fancy used to be a *****.
Q: this is a little of a random question but why do you think that we should save the crested cranes of uganda? and what do you know about the crested cranes???
Because man is a reasoning being he has the capability of saving things. It is in our nature. Secondly, if man's activities are the cause of the Crane's extinction - destroyed its habitat or food source, then man should help reverse this.
Q: In the Bride comes to Yellow Sky, Stephen Crane uses symbolism to evoke in readers a sense of the “old west”. However, the knowledge of the “old west” that the average person holds in his or her mind is false and nothing more than a Hollywood created myth. By using the symbols inherent in Hollywood’s old western myth Crane manipulates the reader’s misconceptions only to leave them feeling stupid when he reveals a hole in that way of thinking with the irrational ending.This is actually a thesis i'm working on for an analytical essay on the piece.I need to know if anyone has ever read the story and gotten the same feeling Crane was having fun at the reader's expense or perhaps poking fun at the old western I have very good points from the text to support my thesis but i cannot find anything online that touches on the possability of this being a parody. Anyone else think Crane's having fun or is a bit condescending in this piece?
I have to say no. Your question erred in a significant way. Hollywood didn't create this false image of the West. The false image was created a long time before by people living in the age of the incidents. It didn't take publishers long to notice that people living back East enjoyed these gritty depictions of the West. Dime novels were a big seller in the 18th and 19th centuries. Look at Stephen Crane. He died in 1900. Hollywood was non-existent as the facet of American life that it holds now. Crane would have been writing this story with the idea that he was depicting a real slice of the wild West that was becoming more civilized.
Q: I was interested in the Japanese legend of folding a thousand cranes. It was said that if a person was able to fold 1 000 cranes, you get to make a wish.I'm just wondering; let's say I'm done with all 1 000. What do I do next? One of my friends told me you had to burn all one thousand cranes, while another suggested to put the last one in a bottle and set it out in sea.Did it ever state what to do in the end, after folding all the cranes? If it does, please enlighten me :3Thank you :)
I've only heard of putting them up on strings and you could give them as gifts .. Oh and you could also frame them by laying them flat

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

Hot products


Hot Searches

Related keywords