Tower Crane CMAX TC7135 Construction Machiney
- Loading Port:
- China main port
- Payment Terms:
- TT or LC
- Min Order Qty:
- 1 set
- Supply Capability:
- 20 set/month
OKorder Service Pledge
OKorder Financial Service
You Might Also Like
Introduction:
Tower Crane is a machinery used for vertical lifting and horizontal delivering of building materials and any other heavy items during construction process. It can lift and lay down, horizontally shift, and rotate, so it has large working range.
Features:
1. It has high working speed, good speed-adjusting performance, steady operation and high efficiency. Three-speed motor and mono-speed ratio decelerator are applied in the lifting struction, which enables heavy load low speed and light load high speed.
2. The range-change structure drives the dolly to change range on the horizontal arm, with good positioning performance. Planet gear decelerator is applied in the circumgyrating structure, together with moment-limiting hydraulic coupler, which can relize high load capacity, steady starting and reliable operation.
3. The crane has complete set of safety devices, which can guarantee the safe and high efficienct operation of the equipment. The machine is equipped with lifting height limiter, dolly range-change limiter, moment limiter, weight limiter, circumgyrating limiter, etc.
4. The operator's room is set independently on one side, with good vision field. It creates a good working environment for the operator.
5. Provide stepless speed regulation. Outstanding in working efficiency, operating stability and reliability,
6. The height can accordign to the actual height of the building and at the same time unchange the lifting capacity.
Specifications:
- Q:electromagnetic crane
- How A Crane Works
- Q:a crane lifts load of 500kg mass to a distance f 20m in 10s at a constant velocity. how much work is done?
- a lot
- Q:Question says it all. On the Yahoo homepage, there is a breaking story that you can not click on, stating the NY fire department are responding to a building collapse, but when you try searching it, only a story about a crane comes up in Yahoo search engine. Anyone know if it's 2 different stories or the same thing?
- Building did collapse.
- Q:I read a book a year ago about sadako sasaki who tried to make all 1000 paper cranes to live. Do you have to keep saying your wish over again when your making them, and when you finished making all 1000 how long did you wait until your wish came true??
- you make your wish once your done cause you only get the wish if you have 1000 cranes right so saying your wish when you only have 6 won't do anything. it can come true the next day till the next year or ten years it not something definite. I've never made 1000 but I think I will.
- Q:heres a picture of one
- There are a few types. Some more modern cranes jack themselves up and then back down after wards. There is a large mis-conception about tower cranes. Many people think they can handle larger loads than portable jib cranes. This is not the case. The advantage of a tower crane is its cost and ability to see. The ones that are not capable of jacking themselves up are erected and taken down by large jib cranes with many times the lifting capacity and cost.
- Q:method how to assemble tower crane?
- Generally tower cranes are self erecting. The first mast and jib sections are assembled at ground level. The mast and jib are then jacked up and another mast section inserted. If the tower crane is not self erecting then mobile cranes have to be used to assemble the crane.
- Q:a. its season of migrationb.the route it followsc.how is it guidedd.distance it travels in a yeare.reason behind migrationplz help me..ill be highly grateful!!!!
- This species breeds in arctic Russia in Yakutia and western Siberia. It is a long distance migrant. The eastern population winters on the Yangtze River in China, the central population at Keoladeo National Park, India and the western population in Fereidoonkenar and Esfahan in Iran. It breeds and winters in wetlands, where it feeds on the shoots, roots and tubers of aquatic plants. This is a large white crane. Large males can exceed 140 cm (55 inches) in length and weigh over 10 kg (22 lbs). Adults are all white, except for a dark red mask extending from the bill to behind the eye. It has a yellow iris and reddish legs. The male is slightly larger than the female. Juveniles have a feathered mask and buff or cinnamon plumage. The voice is flute-like and musical. The status of this crane is critical, as it is expected to undergo a rapid population decline in the near future. The wintering site in China holding 95% of the population is threatened by hydrological changes caused by the Three Gorges Dam. Historic records from India suggest that a number of them wintered there in the past. This number has steadily declined and the birds are no longer found there. Mr. Rutledge of Entally told me that for twenty years he tried unsuccessfully to get live specimens of this crane, but did not succeed till a few years ago, when he and one of the native dealers got so many that the market was quite glutted, and many were sent to Europe. Since then the bird got scarce again, so this was evidently only a temporary invasion. —Frank Finn, Frank Finn in How to know the Indian waders. 1906 The Siberian Crane is one of the species to which the Agreement on the Conservation of African-Eurasian Migratory Waterbirds (AEWA) applies and is subject of a Memorandum of Understanding concluded under the Bonn Convention. =]
- Q:This is for a school project, we need a crane with yydraulics to pick up things for science.. Any ideas ?!
- Get your answer from here
- Q:are parts availble for shop crane? Hydraulic ram plunger o rings has split....need part?
- may have one, or try a tractor supply shop in your area. You can try matching the ring at an auto parts store that has balk parts behind the counter.
- Q:(a)What is the power output of the crane. (ignoring losses)?(b)If it takes the cran2 2 minutes to raise the payload to its final height, how far above the ground is this?(c)If the cable were to break as the payload reaches its final height, how fast would it be traveling as it hit the ground?
- a) As the crane is lifting at constant speed, there is no acceleration on the payload, therefore the net forces on the payload are equal to 0. Therefore the crane overcomes just the force of gravity = 500*9.81 = 4905 N Power = force * velocity = 4905 * 0.7 = 3433.5 W b) distance = speed * time = 0.7 * (2 * 60) = 84 m c) assuming that the cable breaks while it is still going up at 0.7 m/s, therefore initial velocity upwards = 0.7 m/s. using v? = u? + 2as: v? = 0.7? + 2(-9.8)(-84) = 1646.89 v = √(1646.89) = 40.9 m/s the payload will be travelling at 40.9 m/s when it hit the ground.
1. Manufacturer Overview |
|
---|---|
Location | |
Year Established | |
Annual Output Value | |
Main Markets | |
Company Certifications |
2. Manufacturer Certificates |
|
---|---|
a) Certification Name | |
Range | |
Reference | |
Validity Period |
3. Manufacturer Capability |
|
---|---|
a)Trade Capacity | |
Nearest Port | |
Export Percentage | |
No.of Employees in Trade Department | |
Language Spoken: | |
b)Factory Information | |
Factory Size: | |
No. of Production Lines | |
Contract Manufacturing | |
Product Price Range |
Send your message to us
Tower Crane CMAX TC7135 Construction Machiney
- Loading Port:
- China main port
- Payment Terms:
- TT or LC
- Min Order Qty:
- 1 set
- Supply Capability:
- 20 set/month
OKorder Service Pledge
OKorder Financial Service
Similar products
Hot products
Hot Searches
Related keywords