pvc doors
- Loading Port:
- China Main Port
- Payment Terms:
- TT OR LC
- Min Order Qty:
- -
- Supply Capability:
- -
OKorder Service Pledge
OKorder Financial Service
You Might Also Like
1. Packing and Delivery
Package: Hardpaper+ film package. Wooden case can be made for special care delivery. We can make other packings per your requests.
Delivery detail: Usually 25 working days for a 20 feet container.
2. Detailed Description
Double panel offers the latest in stylish home improvement.
A breeze on ventilation, especially when both doors are open, French doors offer the ultimate in elegance and access to your garden or patio area. They transform an opening into a grand entrance.
Anti lift pins to each door prevent door being illegally levered upwards to disengage locks.
Double safety glass (5mm+9A+5mm)
Facility to have both doors with fully operational handles, inward or outward opening way, luxury and beautiful and solemn appearance, with high-quality hardware, opening smooth, safe and reliable
3. Tech Data Shown Below
Acoustical insulation
36 dB
K-value of window
1.80 w/ m2. K
Wind resistance
5000 Pa
Air permeability
0.1 m 3 /h. M
Watertightness
500 Pa
4. Payment and Shipping Terms
A, FOB price, calculated depending upon the delivery place, usual price is EX-WORKS Guangzhou.
B, Payment terms: Bank transfer/ T/T, based on quotation sheet or contract.
5. Scope of Service
A, Free technique consulting, project design and estimates before sales.
B, Commitment of at least three years quality warranty.
- Q: Sun door and window frame 80-66 refers to what
- The width of the window frame profile is 80mm and the thickness dimension is 66mm
- Q: What are the steps behind the construction of the building after the closure?
- 1, parapet masonry, stucco 2, the roof to find slope 3, roof leveling layer 4, roof waterproof 5, waterproof protective layer
- Q: The first powder wall or the first door frame. What are the provisions? Or what is the reason for admiration. Questions added: the door is big and small. How to deal with. Whether the door frame is measured one by one. Uniform size will be a box does not match the problem. More
- First pink wall, after the door frame, and finally brush latex paint
- Q: Do doors and windows and curtain wall construction is carried out at the same time or cross-operation? Trouble experts to mention something
- Can also be carried out at the same time, the focus is the curtain wall and doors and windows at the mouth to deal with ~
- Q: I think the window window frame has always been white ugly ah, what other colors?
- The screens on the market are basically white in the frame, but the trittec profiles also offer different colors to suit your individuality.
- Q: Now the management of the project in a problem, the construction of the project is to rough housing delivery to the owners, then off the bridge aluminum doors and windows need to be installed in place, then broken bridge aluminum door frame how to deal with the lower part? Is reserved in accordance with the provisions of the provisions of 5-8mm? Or first consider the owner of the renovation of about 4cm and then increase 5-8mm? Early completion of the project is in accordance with the provisions of the provisions of 5-8mm reserved for the construction, the owner of the door after the renovation of the decoration of the ground less than the ground, causing the rainy season to the indoor overflow. If you choose to increase the decoration space 4cm or so to increase 5-8mm construction, the lower part of how to deal with? More
- Commercial houses are generally installed after the window is delivered, there is no such problem. Commercial housing is generally only installed outdoor door, the indoor door is not installed, so the installation of outdoor door, you can consider the owner of the renovation of the 4cm or so no longer increase 5-8mm to install, so even if the owner of the decoration than 4cm Affect the door frame or high or low, causing the rainy season to the room overflow.
- Q: My side of the wall paint 5 years of the top there are cracking the place, I want to shovel them to re-brush latex paint, but the floor of the floor I do not want to move, afraid of the construction of the workers when the workers hit bad, how can I do? Question added: the home there are a lot of furniture, it can not move, the bedroom bed closet, the living room of some have, how can I protect up ah. More
- To be protected, to the market to buy ordinary board full of shops on the floor, and between the floor to add a layer of 2MM thick foam pad, before the bubble to confirm the floor clean, no hard particles, The box is sealed with a patchwork between the plates.
- Q: How to deal with the door frame and the wall connection
- First, now the doors and windows and doors of the installation, most of the woodworking board is used to do the background, the use of wood screws and styrofoam fixed, and then the door, window sets of lines sealed; there are individual lining plate, Position and size, the use of styrofoam filled with fixed (gap must be more than 10mm) Second, the polyurethane foam is the installation of doors and windows in the current convenience of the popular process, if it is to consider the problem of seepage of the window, you can refer to the following process operation: The connection of the window to the wall shall first check the number of connectors and the right connector of the brackets and the windows. Check that there is no shaking and jogging between the frame and the wall before no capping. If you find the above phenomenon, the embedded parts to be reinforced, and around the window frame with foam polyurethane to fill, to stay 6 × 6 seam with silicone embedded real. 2. Grass-roots plastering to strictly check the location and size of the hole to prevent the installation of the window frame and then adjust the overall impact of grass-roots level, grass-roots construction must be strictly stratified construction. 3. In the surrounding block before the need to clean up the debris, and rinse, caulking with caulking tools will be embedded into the mortar, and layered embedded, embedded real, to enhance the anti-seepage effect. 4. The windowsill to make a certain out of the water, in order to quickly discharge the rain, the window frame around the outside are sealed with a sealant, the sill outside the lower mouth must be made of notch drip tank to prevent climbing.
- Q: I live in the sea, high-level, especially the wind, the window is particularly large that is not the kind of the following is the wall, the above is the kind of window, is a whole window, When the wind I see the window by the wind flicker flick back and forth, really worry about which day the window will be blown down, hit people how to do. The The In case of people who hit the responsibility ah? More
- Find a professional master to see ,,, I have not seen the actual situation, so bad to give you advice. The
- Q: What are the welding principles for steel doors and windows? Whether the vertical or vertical vertical welding, corner and doors and windows are used in what way to welding. More
- The steel frame with the doors and windows of the project that is to take dry construction, steel frame only from the middle of the connection, the steel frame with its own welding requirements are not high; but the steel frame to form a frame, horizontal or vertical length can be. Want to learn more about the doors and windows of the wall knowledge, please Google input: "Union curtain wall Forum"
Send your message to us
pvc doors
- Loading Port:
- China Main Port
- Payment Terms:
- TT OR LC
- Min Order Qty:
- -
- Supply Capability:
- -
OKorder Service Pledge
OKorder Financial Service
Similar products
Hot products
Hot Searches
Related keywords