Access Panel Manufacturer In China Lowest Price
- Loading Port:
- Shanghai
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 500 pc
- Supply Capability:
- 500000 pc/month
OKorder Service Pledge
OKorder Financial Service
You Might Also Like
Construction:
•Inner frame: High quality extruded aluminum alloy(A6063).
•Out frame: High quality extruded aluminum alloy(A6063)
•With gypsum board
Description:
•The frame are high quality extruded aluminum sheet construction with advantages of corrosion resistance and rigidity.
•It consists out frame and inner frame. The inner frame is fixed to the out-frame by hinges on one side and by screw on the other side..with elephant nose lock. With gypsum board
•The frame can be easily open to allow for maximum flexibility in the installation, maintenance.
Surface Finish:
•Powder coated color finish as per RAL color---- standard color: RAL9016
Character
Easy and quick installation
Continuous one-piece frame with feathered edge
High-class quality, perfect design, light weight but strong bearing capacity, no rusting and keeping forms.
Mildew resistant.
FAQ
1. Is OEM available?
Re: Yes, OEM service is available.
2. Are you factory?
Re: Yes. we are the largest factory in China.
3. Can we get sample?
Re: Yes, sample is free for our customer.
4. How many days for production
Re: usually 2 weeks after receiving of downpayment
Picture
- Q: The installation method of color steel activity room
- Caigang activity board room and building almost the same, will be around and the wall foundation leveling, the best use of reinforced concrete, more solid; and then column, with the beam will be linked to the skeleton, the partition, the outer wall and the door window frame; Followed by laying the floor, and then put a layer of upward, and then on the roof and roof panels; the final installation of doors and windows, pull vertical support. There is sanitary ware, ah, hardware and the like. In fact, this is the light steel structure, and the heavy steel structure plant is very similar to the color of steel activities room hidden project is in the construction process, after the completion of a process, will be covered by the next process, all can not be completed after the inspection site , Do the room decoration, "hidden project" is the key, if the "hidden project" is not done, the surface decoration was beautiful, but also in vain. "Hidden project" can be divided into water installation, electrical installation and moisture, water and other projects. Each of which can not be ignored, if any link is a problem, may bring serious economic losses, and even harm to personal safety. Waterproof construction of the construction process and material identification, to avoid unnecessary economic losses and injuries.
- Q: What are the key points for the production and installation of wooden doors and windows?
- The production of good icu you and the size of the hole to the size of what accessories, i sealed ah! and many more
- Q: What is the difference between a window and a beam and a ring beam?
- Doors and windows over the beam at the top of the door and window lanterns, because the doors and windows can not withstand the load of doors and windows, so set the doors and windows to withstand the part of the load. Common types of windows and doors are: brick arch over the beam (including the flat arch and arc arch), reinforced brick beams, reinforced concrete beams. Ring beam more common in brick and concrete structure, usually arranged in the floor plane, along the brick wall through the whole plane, so called ring beam. The beam width of the beam is generally the same as the wall thickness, and the beam height is generally a multiple of the modulus of the brick. Ring beam is not necessarily used for load-bearing, its role is to strengthen the overall structure of the structure, conducive to seismic and control uneven settlement, with the use of structural column better. The difference between the above is the difference between the two.
- Q: I would like to ask, the interior wall plaster door window frame a few centimeters ah, the external wall insulation board wiping the surface of the door window frame a few centimeters ah?
- Interior wall plastering door frame 5 mm or so, elegant approach should be silicone edge (where you are rough delivery). External wall insulation board wiping the surface of the laminated window frame is not greater than 1 cm, pay attention to the edge of the silicone must be, here is the weak water seepage.
- Q: Just do not understand the information, please take care of the older generation, and then this Xianxie! More
- Sub-box, lightning protection, waterproof, the main frame and the sub-frame connected to the screws, these are hidden, to cover the acceptance records, the rest do not need to attach the form, the main frame is installed, with inspection batch form, glass ibid.
- Q: What do all the walls make gypsum board grasses mean
- Done to prevent the house wall crack!
- Q: For example, C-1 drawings of the hole size of 1800 × 1500 and the construction unit sent the size of the settlement sheet 1185 × 1675 which is why. The More
- The main calculation rules and the formula: 1, aluminum doors and windows, color plate group angle windows and doors, steel doors and windows installed by hole area in square meters. Purchase of finished wood doors installed, according to the purchase of the net area of ??the calculation. 2, all kinds of wooden doors and windows production and installation of the amount of windows and doors according to the window area of ??the square meter. 3, even the amount of windows and doors should be calculated, apply the corresponding door, window quota, the width of the window counted to the outside of the door frame. 4, frameless window by the fan's peripheral area calculation. 5, roll gate installation by its hole height plus 600MM multiplied by the actual width of the door in square meters. Install the electric device to set the calculation, the shutter door on the door to install the fan calculation, small door area should be deducted. 6, doors and windows fan package galvanized iron, according to the door, window hole area in square meters; doors and windows box package galvanized iron, nail rubber, nail felt according to the size of the door and window openings to extend the meter. 7, the windows and doors on the package of stainless steel plate according to the expansion of stainless steel plate area in square meters. The metal surface or soft side of the wooden door is calculated as the net area of ??the door. 8, the upper part of the ordinary doors and windows have semi-circular window, the amount of engineering should be calculated according to ordinary windows and semi-circular window, calculated by ordinary windows and semi-circular window between the horizontal line on the boundary line. 9, frameless glass door according to its hole area calculation, which part of the fixed door, part of the door to open the door, the amount of work should be calculated separately.
- Q: Four-wheel positioning adjustment screw how to install
- Big Brother, four wheel positioning need to tilt and tie, you say which ah
- Q: Rough leveling how to use?
- Before the construction should measure the wall to determine the thickness of the wall leveling layer, if the wall flatness is very good, you can reduce the leveling layer thickness, do not have to worry about whether the material can meet the strength, because the Pratt thick rough construction thickness from 5mm To 50mm are suitable. Determine the thickness of the leveling layer should be in the wall for the elevation of the line, the spacing between each tendons in the 1.2-1.5m or so, according to the experience of construction workers to determine the vertical arrangement of tendons from the corner position in turn arranged. Prades without formaldehyde rough leveling is a one-component powder products, according to the requirements of the amount of water (about 45%) can be used evenly stirred. Base surface requirements solid clean without powder, no sand, no peeling, surface attached debris, oil should be clear, the hole should be filled in advance. Check whether the doors and windows frame is securely connected and fill the gap between the door frame and the wall with a good "paste". Adjust the "slurry" should be within 30 minutes on the wall, in the grassroots first thin scraping again, the purpose is to make the material and the grass-roots contact between the full. And then approved on the wall enough to adjust the "slurry" with a 2m long by a one-time scratch can be. Indoor pillars, the location of the wall angle should be increased Prades Corner, the height of not less than 2m.
Send your message to us
Access Panel Manufacturer In China Lowest Price
- Loading Port:
- Shanghai
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 500 pc
- Supply Capability:
- 500000 pc/month
OKorder Service Pledge
OKorder Financial Service
Similar products
Hot products
Hot Searches
Related keywords