Our factory is divided into twelve production lines. We use production equipment from Germany including mixers and double screw rod extruding machines. Our monthly capacity is 500 tons of wood plastic composites--80% of which we export.

  We have an R&D department with 5 engineers who have an average of 10 years of experience. They research and develop our equipment, including the mixer, assembly line, QUV experiment meter, multi-purpose impact reflectoscope, dresser and knurling machine. We develop at least one new product every month and can prepare OEM samples for you with a lead time of one month.

  We have a QC department with five engineers who have an average of four year's experience. They examine products before export using reflectosopes and ensure our facilities conform to ISO 9001 and ISO 14000 certification standards. The products was tested by third party(INTERTEKS, SGS), meet REACH’S regulations.

Our company adheres to “Quality first, Customer first” philosophy, in line with “The good faith management” principle of service, looking forward to cooperating with you.

Q: Plastic window GB8814-88 what it means
GB8814-2004 (PVC doors and windows).
Q: What is the gap between the window and the wall?
If the mouth is installed, the expansion joints are 15 to 20 mm, and the net mouth is installed with a 10 to 15 mm expansion joint
Q: How to calculate the cross section of the door frame, there is no picture or schematic, the problem added: window frame, sash section how to determine? More
A cross section of a door frame or window frame. A door frame or window frame. Is the excessive part of the window and the wall. Usually rectangular. The door and window frame is fixed on the wall where the wall is left. Doors and windows on the windows and doors frame. Section refers to: the profile of the object, can reflect the details of the internal structure of the object. Door frame section generally refers to the cross-section structure or structure of the material constituting the door frame.
Q: My house is duplex building, fourth floor, the floor is 4.5 meters high, the window is from the top to the windowsill 4 meters high, 4.5 meters wide, is the aluminum plastic, the middle of a standing aluminum plastic column, width 5 cm Maintenance team before the repair of shaking, especially the performance of the wind is very obvious, the middle of the window shaking the trip is about 10 cm, usually hand effortless push the windows on the shaking. Will the windows there is no national standard, so you can shake the windows
The national standard of the specific values do not know, but the shaking of 10 cm absolutely unqualified, like your home so big windows should belong to the curtain wall structure, and ordinary window frame can not afford, there are curtain wall frame, and the window construction unit to Responsible for the design, unless you are asking to do so, then he must meet the technical requirements of the curtain wall, and the glass block is greater than 1.5 square meters to use tempered glass, curtain wall requirements than ordinary windows a lot of strict.
Q: Aluminum alloy window frame is installed after all around to play foaming agent? There is no mouth does not play foaming agent Some people say that after the mouth blowing foam will be seepage? More
Aluminum doors and windows frame installed after the only need to play in the left, right and above the three sides to play on the line, the mouth not to fight, to use cement mortar can be filled, and the left and right sides of the bottom 10cm also use cement mortar Fill in.
Q: Aluminum doors and windows production, installation need to pay attention to what? What are the technical requirements?
In the process of making the technical staff to do every standard process, because the aluminum alloy doors and windows waterproof performance itself is not waterproof profiles, it must be used for each connection point waterproof film, glass must be sealed with glass glue inside and outside
Q: Do you want to eat the windows and doors?
Door and window out of the plaster is to eat a little window frame, probably the principle is: the wall plastering door frame 5 mm or so, elegant approach should be silicone edge (where you are rough delivery). Wiping the surface of the laminated window frame is not greater than 1 cm, pay attention to the edge of the silicone must be, here is the weak water seepage.
Q: Building interior decoration (construction) construction time node, for example, the wall putty putty, spray latex paint and doors and windows frame installation, paving tile order The
Step 3: the wall of the demolition; the second step: the transformation of water and electricity; the third step: paving the kitchen bathroom wall; waterproof; tiles fourth step; woodworking approach; fifth step; Six steps; installation, etc. follow-up work
Q: We have a new brush on the walls and floors of the house, can we live on the balcony of the floor where the floor tile is not painted? We have a balcony on the door can be closed Thank you big
Daily life can be completely cut off I think nothing, like other people in the decoration, you live the same. Of course, the door was tight, the window was open.
Q: The installation of the horizontal lines, vertical lines and out of the line, respectively, what is the use of what in the end
In the measurement, the hole in the same horizontal line should be measured on a horizontal line to measure the height of the hole, and the width of the hole in the same vertical line is measured, whichever is the minimum (the minimum value of which is negligible, Doors and windows through the repair hole alone) as the same specifications of the doors and windows of the design guidelines for the external walls of the wall is not clear water or cement mortar exterior decoration, should be the construction axis and the horizontal line as the benchmark window and the horizontal axis, to measure the doors and windows The minimum width and height of the hole, and should be based on building outside the row of rulers to determine the final size of the doors and windows processing. The determination of the gap between the construction hole and the doors and windows, in excluding the architectural design error, by measuring the minimum horizontal height and minimum vertical width of the hole as the design criteria for the size of the doors and windows, do not have to consider the size of the building openings in Table 1 allowable deviation To consider the table 2 and Table 3 doors and windows when the deviation occurs when the measurement occurs when the positive deviation of the probability that the measurement of the size of the phenomenon is too large, doors and windows under the effect of temperature expansion and decorative surface layer thickness and other factors, Should be determined in accordance with Table 4, the gap between the doors and windows theoretical gap.