German High Quality Energy Saving UPVC door and window profiles
- Loading Port:
- Qingdao
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 10 m.t.
- Supply Capability:
- 2000 m.t./month
OKorder Service Pledge
OKorder Financial Service
You Might Also Like
We own a good reputation in Europe and all over the world. Our brand is one of the most famous Door & Window profile brand in Germany.
At present, after three phases of capacity expansion, Our brand have a production capacity of 20,000 tons per year for manufacturing first-class profiles. A complete set of German material-mixing system, extrusion lines and high speed molds are imported, which ensure high quality products.
60AD Casement Window Series,
60MD Four-cavity three-sealed Casement Window Series,
65MD Four-cavity three-sealed Casement Window Series,
60/88 Sliding doors and windows series,
70/127 Sliding doors and windows series and 108 sliding doors and windows series;
Color available: White high ultraviolet, Entire colorful, Co-Extrusion and Colorful Laminated Profiles;
Appearance and technical design of lotus sliding and AD series products are designed for Asia and hot-summer and cold-winter zone in China, MD products are suitable for climate characteristic of cold regions.
The heat transfer coefficient of each specifications are as follows.
Three-cavity Casement Window Frame Uf =1.7W/m2.K、
Four-cavity Casement Window Frame Uf =1.6W/m2.K;
Five-cavity Casement Window Frame Uf =1.5W/m2.K;
Please feel free to contact me if any inquiry about the products we offer. We will try to do the best for you.
- Q: Lead alloy doors and windows of the joints how waterproof
- First, the aluminum alloy windows and doors water seepage analysis 1. doors and windows of their own water seepage 1.1 their own closed lax; 1.2 own drainage system drainage is poor; 2. doors and windows installed improperly generated cracks, resulting in seepage 2.1 windows and doors frame deformation caused by the wall with the The gap between the windows and doors and the wall between the wall of the filler is not uniform, and the resulting gap
- Q: How to construct the outdoor rock wool insulation board
- Adhesive mortar point sticky or full of sticky, and then insulation nails fixed, or slotted with T-card fixed pad sealant.
- Q: Sliding doors and windows to prevent shedding measures which
- According to your estimate, it should be your plastic steel windows and doors fixed position is not caused by a straight line. First of all, you first pull the sliding doors and windows you can slide the doors and windows under the wheels of the padding things and then screw into the screw. And then loaded up.
- Q: Is not all the doors and windows are located in the middle of the wall?
- Not necessarily, you are assigned by the Party. If he wants to press double windows. It should be pressed out.
- Q: Do you want to install a seal tape for steel windows
- Some, the People's Republic of China Construction Industry Standard JG / T187-2006 Building doors and windows with sealing tape
- Q: Engineering materials inside the windows and doors hidden when to do? Is done in the main construction, or do the decoration when the doors and windows to do the decoration?
- Generally need to do the information should be civil air defense doors and windows, the need for pre-embedded concrete pouring, so the information is also done in the main body.
- Q: On the provisions of stainless steel railings weld
- There is no rigid rules on the seam on the welding, no seam as little as possible welding, solder joints small
- Q: The installation of the horizontal lines, vertical lines and out of the line, respectively, what is the use of what in the end
- 1, aluminum doors, window frame approach, check the horizontal line, draw vertical lines, entry and exit lines, window frames, holes on the bit, clean the hole. 2, oblique wood wedge fixed window frame, correction, nail fixed iron feet, check. 3, mortar or fine concrete foot iron feet. 4, iron foot mortar dry solid, remove the wooden wedge, powder outdoor hole. 5, note the blowing agent, outdoor playing the first degree of silica gel. 6, window frame mortar sealing box, rub real, take the pulp. 7, door and window frame inside the silicone, outdoor playing second degree of silica gel. 8, installation box fan. After installation, the connector, the blowing agent to conceal acceptance. The vertical and horizontal of the doors and windows to measure the actual volume, so that the installation quality to meet the requirements. In the installation of aluminum doors and windows, generally according to the following procedures for acceptance: the installation of pre-acceptance doors and windows openings, installation doors and windows frame, check the door and window frame, playing expansion agent, outdoor first silicone, acceptance expansion agent, silicone, , Acceptance hole, painting, playing silicone, acceptance of silicone, doors and windows fan installation, doors and windows as a whole acceptance, water test. Doors and windows all installed, but also to spray test to check the leakage of doors and windows.
- Q: Rough leveling how to use?
- Before the construction should measure the wall to determine the thickness of the wall leveling layer, if the wall flatness is very good, you can reduce the leveling layer thickness, do not have to worry about whether the material can meet the strength, because the Pratt thick rough construction thickness from 5mm To 50mm are suitable. Determine the thickness of the leveling layer should be in the wall for the elevation of the line, the spacing between each tendons in the 1.2-1.5m or so, according to the experience of construction workers to determine the vertical arrangement of tendons from the corner position in turn arranged. Prades without formaldehyde rough leveling is a one-component powder products, according to the requirements of the amount of water (about 45%) can be used evenly stirred. Base surface requirements solid clean without powder, no sand, no peeling, surface attached debris, oil should be clear, the hole should be filled in advance. Check whether the doors and windows frame is securely connected and fill the gap between the door frame and the wall with a good "paste". Adjust the "slurry" should be within 30 minutes on the wall, in the grassroots first thin scraping again, the purpose is to make the material and the grass-roots contact between the full. And then approved on the wall enough to adjust the "slurry" with a 2m long by a one-time scratch can be. Indoor pillars, the location of the wall angle should be increased Prades Corner, the height of not less than 2m.
- Q: Living room bedroom 1 meter yellow bedroom 2 ground are beige. Q: What are the colors of the doors and windows frame? More
- Wallpaper is European vertical stripes, the choice of white, furniture is white under the premise of the formation of white European style, can also use the original wood color
Send your message to us
German High Quality Energy Saving UPVC door and window profiles
- Loading Port:
- Qingdao
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 10 m.t.
- Supply Capability:
- 2000 m.t./month
OKorder Service Pledge
OKorder Financial Service
Similar products
Hot products
Hot Searches
Related keywords