Cummins 20-300KW Silent Type Diesel Generator Set
- Loading Port:
- Fuzhou
- Payment Terms:
- TT OR LC
- Min Order Qty:
- -
- Supply Capability:
- 500-700 unit/month
OKorder Service Pledge
OKorder Financial Service
You Might Also Like
Cummins 20-200 KW Silent Type Diesel Generator Set
Technical Date
YIHUA- DCEC CUMMINS series diesel generator power coverage from 16kw~220kw 。
Adopting DCEC Cummins, it's manufacturing base invested by Cummins in China, who is specializing in low or medium power diesel engine .The prime products are 4B,6B,6C,6L series diesel engine Gen-set. with globally uniform quality standard, compact structure ,reliable capability, high ly durability, safety and emission.
Power coverage from 16kw~200kw
Model: GF: Open type &GFS: Soundproof /Silent/Supper silent type
Engine: DCEC Cummins
Speed: 1500/1800rpm
Alternator: Stamford /Leroysomer /Marathon/ABB/YIHUA YHG
IP &Insulation Class: IP22-23 &F/H
Frequency: 50/60HZ
Controller: Deepsea/Comap/Smartgen/DKG/Others
ATS System: Smartgen/ABB/SOCOMIC /Others
Silent&Supper silent Gen-set Sound level: 63-75db(at 7m side)
Generator set Techinical specification | ||||||||||||
generator set performance | Engine performance | Dim.L*W*H | ||||||||||
Genset model | Prime power | Standby power | Fre. | Model | Power | Full load | Open type | Weight |
|
| ||
KW | KVA | KW | KVA | HZ | KW | (L) | (mm) | (kg) |
|
| ||
GF/GFS-C16KW | 16 | 20 | 26 | 32.5 | 50 | 4B3.9-G1/G2 | 24 | 5 | 1700*750*1150 | 850 |
|
|
GF/GFS-C20KW | 20 | 25 | 26 | 32.5 | 50 | 4B3.9-G1/G2 | 24 | 6 | 1700*750*1150 | 850 |
|
|
GF/GFS-C30KW | 30 | 37.5 | 33 | 41.3 | 50 | 4BT3.9-G1/G2 | 36 | 8 | 1820*760*1150 | 900 |
|
|
GF/GFS-C34KW | 34 | 42.5 | 37.4 | 46.8 | 50 | 4BT3.9-G1/G2 | 36 | 8 | 1820*760*1150 | 950 |
|
|
GF/GFS-C40KW | 40 | 50 | 44 | 55 | 50 | 4BTA3.9-G2 | 50 | 9.8 | 1950*830*1150 | 1050 |
|
|
GF/GFS-C45KW | 45 | 56.25 | 49.5 | 61.9 | 50 | 4BTA3.9-G2 | 50 | 13 | 1950*830*1150 | 1070 |
|
|
GF/GFS-C58KW | 58 | 72.5 | 63.8 | 79.8 | 50 | 6BT5.9-G1/G2 | 86-92 | 23 | 2150*880*1350 | 1120 |
|
|
GF/GFS-C68KW | 68 | 85 | 74.8 | 93.6 | 50 | 6BT5.9-G1/G2 | 86-92 | 23 | 2150*880*1350 | 1120 |
|
|
GF/GFS-C80KW | 80 | 100 | 88 | 110 | 50 | 6BT5.9-G1/G2 | 86-92 | 23 | 2150*880*1400 | 1120 |
|
|
GF/GFS-C90KW | 91 | 113.75 | 100.1 | 125.1 | 50 | 6BTA5.9-G2 | 110 | 23 | 2350*950*1360 | 1200 |
|
|
GF/GFS-C100KW | 100 | 125 | 110 | 137.5 | 50 | 6BTA5.9-G2 | 110 | 23 | 2350*950*1360 | 1235 |
|
|
GF/GFS-C110KW | 110 | 137.5 | 121 | 151.3 | 50 | 6BTAA5.9-G2 | 120 | 26 | 2350*950*1360 | 1400 |
|
|
GF/GFS-C128KW | 128 | 160 | 140.8 | 176 | 50 | 6CTA5.9-G2 | 163 | 33.9 | 2470*950*1430 | 1900 |
|
|
GF/GFS-C144KW | 144 | 180 | 158.4 | 198 | 50 | 6CTA5.9-G2 | 163 | 35.1 | 2470*950*1430 | 1900 |
|
|
GF/GFS-C150KW | 150 | 187.5 | 165 | 206.3 | 50 | 6CTA5.9-G2 | 163 | 35.1 | 2470*950*1430 | 2000 |
|
|
GF/GFS-C160KW | 160 | 200 | 176 | 220 | 50 | 6CTAA5.9-G2 | 183 | 38.7 | 2600*980*1450 | 2300 |
|
|
GF/GFS-C180KW | 180 | 225 | 198 | 247.5 | 50 | 6LTAA8.9-G2 | 220 | 38.7 | 2600*1000*1450 | 2400 |
|
|
GF/GFS-C200KW | 200 | 250 | 220 | 275 | 50 | 6LTAA8.9-G2 | 220 | 41.6 | 2600*1000*1500 | 2500 |
|
|
GF/GFS-C20KW | 20 | 25 | 26 | 32.5 | 60 | 4B3.9-G1/G2 | 27 | 5 | 1700*750*1230 | 850 |
|
|
GF/GFS-C22KW | 22 | 27.5 | 26 | 32.5 | 60 | 4B3.9-G1/G2 | 27 | 6 | 1700*750*1230 | 850 |
|
|
GF/GFS-C30KW | 30 | 37.5 | 33 | 41.3 | 60 | 4BT3.9-G1/G2 | 40 | 8 | 1820*760*1240 | 900 |
|
|
GF/GFS-C34KW | 34 | 42.5 | 37.4 | 46.8 | 60 | 4BT3.9-G1/G2 | 40 | 8 | 1820*760*1240 | 950 |
|
|
GF/GFS-C48KW | 48 | 60 | 52.8 | 66 | 60 | 4BTA3.9-G2 | 60 | 9.8 | 1950*830*1270 | 1050 |
|
|
GF/GFS-C55KW | 55 | 68.75 | 60.5 | 75.6 | 60 | 4BTA3.9-G2 | 60 | 13 | 1950*830*1270 | 1070 |
|
|
GF/GFS-C68KW | 68 | 85 | 74.8 | 93.5 | 60 | 6BT5.9-G1/G2 | 92-102 | 23 | 2150*880*1400 | 1120 |
|
|
GF/GFS-C80KW | 80 | 100 | 88 | 110 | 60 | 6BT5.9-G1/G2 | 92-102 | 23 | 2150*880*1400 | 1120 |
|
|
GF/GFS-C90KW | 90 | 112.5 | 99 | 123.8 | 60 | 6BT5.9-G1/G2 | 92-102 | 23 | 2150*880*1400 | 1120 |
|
|
GF/GFS-C100KW | 100 | 125 | 110 | 137.5 | 60 | 6BTA5.9-G2 | 120 | 23 | 2350*950*1360 | 1200 |
|
|
GF/GFS-C110KW | 110 | 137.5 | 121 | 151.3 | 60 | 6BTA5.9-G2 | 120 | 23 | 2350*950*1360 | 1235 |
|
|
GF/GFS-C120KW | 120 | 150 | 132 | 165 | 60 | 6BTAA5.9-G2 | 132 | 26 | 2350*950*1360 | 1400 |
|
|
GF/GFS-C144KW | 144 | 180 | 158.4 | 198 | 60 | 6CTA5.9-G2 | 180 | 33.9 | 2470*950*1430 | 1900 |
|
|
GF/GFS-C150KW | 150 | 187.5 | 165 | 206.3 | 60 | 6CTA5.9-G2 | 180 | 35.1 | 2470*950*1430 | 1900 |
|
|
GF/GFS-C160KW | 160 | 200 | 176 | 220 | 60 | 6CTA5.9-G2 | 180 | 35.1 | 2470*950*1430 | 2000 |
|
|
GF/GFS-C180KW | 180 | 225 | 198 | 247.5 | 60 | 6CTAA5.9-G2 | 201 | 38.7 | 2600*980*1450 | 2300 |
|
|
GF/GFS-C200KW | 200 | 250 | 220 | 275 | 60 | 6LTAA8.9-G2 | 240 | 38.7 | 2600*1000*1450 | 2400 |
|
|
GF/GFS-C220KW | 220 | 275 | 242 | 302.5 | 60 | 6LTAA8.9-G2 | 240 | 38.7 | 2600*1000*1500 | 2500 |
|
FAQ
1.Q: What is your MOQ of this item?
A: 1-10 piece
2.Q: What is the lead time?
A: 25-35 days after receiving your L/C or T/T deposit.
3.Q: Is it all right to make customer's own brand name?
A: We can be your OEM manufacture with your authorization of brand.
4.Q: Where is your Loading Port?
A: China Port.
5.Q: What are your payment terms?
A: 30% deposit and balance T/T against copy of Bill of Lading or L/C at sight.
6.Q: What is your company's available production capacity?
A: 3000-5000 pieces against your orders.
- Q: a factory open 8.00 am to 4.00 pm and using 80kWh der day or 10000 w electricity in a given time it generate electricity by a diesel generator. is it possible to use a small diesel generator to generate enough power to run a motor and connect that motor to large power generator to generate whole electricity need for factory
- A factory operating from 8 am to 4 pm uses 80kWh or 10000w of electricity per day generated by diesel. It is possible to use a small diesel generator to generate enough power to run a motor. If that motor is connected to a large power generator, it will generate enough electricity to power the entire factory.
- Q: 272 hours (x 30mph estimate) @ 1800rpm's 8,220 miles. This is a stand by generator. Make Cummings, Model 4BT, Stamford 45kW generator.
- ALL engines start to turn oil dirty as soon as they are started.regardless if it's a diesel or gas engine.
- Q: I am considering buying a back-up generator system for my newly bought home, the only problem is that my home is 4,947sq. ft, and I seem to find a single generator that is capable of powering my entire, will buying a few portable or large sized stand-by generators solve my problem?
- If you are looking for an emergency generator capable of delivering 200A @ 240V, single-phase current (a typical whole-house size), you will be specifying a significantly large unit, something the size of a large refrigerator (on its side). If that sort of total capacity is what you want, go for it. The incremental costs for larger units is very roughly proportionate, so a unit of twice the capacity will be very roughly twice the cost. Keep in mind that these systems must be maintained properly and tested (at least monthly) regularly. If you choose a liquid-fuel model (diesel or gasoline) there is the storage and treatment issue for the tank and the fuel in it. And, as you increase size you increase fuel consumption significantly. Typically, such generators are connected only to critical systems via the transfer-switch. So, your key systems feed directly to the transfer-switch such that when there is a power failure and the generator kicks in, the transfer switch isolates those key systems from the rest of the load. In this way you could reduce your requirements to things like refrigeration, lighting, even AC and computers, leaving out items such as hot-tubs and similar. Determine your anticipated load for key items, add perhaps 25% as a safety margin and look around that capacity. MAKE SURE that you have the system - especially the transfer switch and its load - professionally installed. A mistake there could fry both your entire house system and all things attached to it, the generator, *and* get you a massive fine from your Utility. Don't mess with this.
- Q: i want to see the model of this perkins generating set
- are you sure its a perkins? It may be a Yanmar?
- Q: If you obtained all of your energy from a diesel generator, how much diesel would you save per year by switching from incandescent to CFL? Diesel has an energy density of 36 MJ/L and your generator operates with 40% efficiency. Incandescent bulbs consume 60-100W, while CFL consumes 15-25W.
- 1 Kwh 3.6 MJ. If you use each light 4 hours per day, and each was 100 watts, that is 4 x 100 x 10 x 365 1,460,000 watt hours per year. That requires 1,460 x 3.6 MJ 5,256 MJ. / 0.4 efficiency 13,140 MJ. So you need 13,140 / 36MJ/L 365 Liters of diesel. If you used CFLs, at 25 watts, the answer is 1/4 of that, so 365 / 4 91.25 Liters of diesel. So the savings is 365 - 91.25 273.75 Liters savings. At $1.25 per liter, that is $324.19.
- Q: I have 1500 kw load,i want install on Diesel Generator.What should be rating?
- If its a pure resistive load consider the efficiency of the alternator, de-rating factors to ambient conditions etc. etc. After considering all of the above you need a 1650KVA (with 10% safety factor
- Q: How much would it typically cost to rent a 6000-8000watt diesel generator for a week? I know no one here probably knows for sure, so I'm just looking for ballpark figures. Thanks.
- You can expect to spend between $60-$80 per day for a diesel generator.
- Q: I am looking for the stand by large generator 15-20kw (to use all the power on one transfer switch). The problem is that stand by generator require large propane tanks (expensive to install). I would like to find a stand by generator that i could run off gasoline and use all of it available power. I think this would the most economical solution. In case of propane/natural gas the cost of propane tank installation is significant. The diesel stand by generators are significantly more expensive. So far I have found tri-fuel13kw portable generator that has several outlets. In this case not all the power can be utilized.
- I don't get what you mean by not able to use all the power. The generator will produce it's rated output, and little more, from one or any combination of it's outlets - single or three phase, including the 12 volt charging system. The total output of the machine is available as a function of the total load connected, not the number of plugs or the variety of outlets - it is the total load that counts. Petrol is the least efficient, and the most dangerous fuel to use and store. The amount of fires involving LPG or similar fuels is a fraction of those involving petrol in road accidents for a start. A slow speed Diesel generator correctly sized for your normal load (allow 33% additional capacity for starting induction motors etc.) will use the least fuel, and be the longest lasting by a large margin of any of the choices you suggest above. The cheapest initial option will be a petrol powered system, but the most expensive to run, and the earliest to wear out. The running costs will be much cheaper on propane etc., and the engine will run much cleaner and last longer as a result. A high speed diesel unit will cost more than the petrol version, but will not be as expensive as the better slow speed types, it will be economical, but is not going to last as well as the slow speed models. Well made slow speed diesel units will cost the most to install, but will be the most economical both to run, service and in longevity. The cheapest initial option I have found, is always the most expensive in the medium and long range. If the unit is purely for emergency power, it should be run under load every month at least, and the fuel must be kept fresh, or treated and constantly monitored to withstand long term storage - this is where the propane storage is particularly effective. The worst thing that can be done with any backup power system is to allow it to sit for any length of time without being used. Many fail at critical times because of this.
- Q: I Live way out in the country and have a diesel generator.I want to switch to nuclear because it could be cheaper. I have plenty of land to dispose of any nuclear waste.
- You would be shut down before you got started unless you want to go through all the red tape and bs the government would throw at you. Plus you can't just bury it anywhere it could potentially contaminate the water table.
- Q: i want to put three phase current of two diesel generating sets in only three phase.
- Yes you can, just make sure the connections are grounded first!
Send your message to us
Cummins 20-300KW Silent Type Diesel Generator Set
- Loading Port:
- Fuzhou
- Payment Terms:
- TT OR LC
- Min Order Qty:
- -
- Supply Capability:
- 500-700 unit/month
OKorder Service Pledge
OKorder Financial Service
Similar products
Hot products
Hot Searches
Related keywords