• CMAX SWDH60Hydraulic Rock Drill Sale on Okorder System 1
  • CMAX SWDH60Hydraulic Rock Drill Sale on Okorder System 2
CMAX SWDH60Hydraulic Rock Drill Sale on Okorder

CMAX SWDH60Hydraulic Rock Drill Sale on Okorder

Ref Price:
get latest price
Loading Port:
Shanghai
Payment Terms:
TT OR LC
Min Order Qty:
1 unit
Supply Capability:
1000 unit/month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

CMAX SWDH60Hydraulic Rock Drill Sale on Okorder

1. Equipped with hydraulic rock drill of international famous brand with reliable performance and high efficiency.

2. Key components are produced in the same platform as that of the cutting drill, which faciliates the mutual modification with cutting drill, thus to realize multifunction of one machine.

3. It is as flexible and convenient in amplitude adjustment, upper swing, walking ability as that for the excavator.

4. Equipped with the independently developed drilling logic block, and self-adjustment can be achieved for the work parameters with the change in rock conditions, thus to effectively extend the drill life.

MAIN DATAUNITSWDH 60
OPERATION PARAMETER 
Drill rod
R32
Drill rod lengthmm3660
Hole rangemm36~60
Hole depth, maxm3.2
speedm/min0.7~1.5
Dust collection device

AIR COMPRESSOR

Model
TA-120
Working pressureMPa0.7
Free air deliverym³/min1.5
PowerkW11
ENGINE

Model
V3300-DI
Power/SpeedkW/rpm54.9 / 2600
Fuel tank capacityL140
FEED

Length of drillrigmm4800
Feed lengthmm3500
Feed speedm/s0.06
Feed force, maxkN7.5~10
TRAVELLING

Travel speedkm/h4.5 / 3.1
Traction force, maxkN55
Hill climbing ability°25
Ground clearancemm338
Ground pressurebar0.435
ROCK DRILL

Model
HC25
Shank adapter specification
R32
Rotary speed, maxrpm130~230
Rotary torque, maxNm320
Percussion pressurebar150
Impact powerJ150
DIAMENSION

Gross weightt7.8
Transportation state( L×W×H)m8.5×2.2×3.15
Working state( L×W×H)m6.1×2.2×5.02





Advantages

1 sincere

CNBM International is a state company, now is one of the largest state-owned group cooperation in China! All the outdoor heaters produced by CNBM are compliant with the national level quality.

2 professional

Our engineers will at your services 24hours to answer your questions. Our goal is to provide the best professional services.

3 quality

 CNBM International’s outdoor heater have strict quality control, only the best quality products can pass the test.

4speed

 We have professional sales team to guarantee your reply within 12hours to save your precious time.

5 After sales

If the tower crane has any problems, we will solve your problems in first time.

 

FAQ

1.Which payment terms can we accept?

  Normally we can work on T/T term or L/C.If you choose T/T,30% payment is required in advance and 70% balance shall be settled before shipment often,it rang a little.

2.How long will our price be valid?

We are friendly dealer, never greedy windfall profit, our price remains stable,except the exchange rate and the increasing labor cost and material cost.

3.What are our advantages compared with manufacturers?

a.Detailed training-We can provide training services to different users. The training sessions include product training,operating training, maintenance know-how,standard and so on to fulfill your individual needs.The training can be conducted at client’s site.

b.Available after service-With our global distributor network, you are guaranteed with fast deliveries and services if you submit your requests.



 


Q: AMD pile driver FX-8350 with what motherboard good?
From the practical point of view, FX-8350 with AMD970 motherboard is enough, as for the brand, it is recommended to choose gigabyte, MSI, ASUS and other brands.Introduce one of the ASUS M5A97 LE R2.0 motherboard parameters:The main chip group: AMD 970;
Q: The distance is 400 meters. Is it possible to use 120 of the aluminum core cable? If not, how much cable should be used? Empty 20How big the cable 250KW piling machine, the distance is 400 meters, can use the aluminum core cable 120, if not, the cable for much, much of the air distribution.
Hello, is this pile driver 380V? It's not 3KV or 6kV, is it? If it is 380V, 250KW motor rated current is about 450 security, and the aluminum core cable 240 square in 30 degrees Celsius environment safe carrying capacity of 240, the actual use, 240 square aluminum in the current 240, fever is very serious.
Q: Is there a pile driver in it?
However, the piling machine is not stable, but also a team together. And we're going out of town, this month, ten days.
Q: How many prestressed concrete pipe piles can a pile driver hit in a day?
In general, it takes about half an hour for 18M's prestressed pipe pile to enter the soil. One day, you can use the time to do it
Q: How many hydraulic pile drivers or diesel pile drivers are used in high-rise residential buildings?
The precast pipe pile is mostly driven by diesel hammer pile machine (in particular, the use of static pressure pile machine).
Q: How much is the hydraulic pile driver?
Between 16-40, 000. Different manufacturers. Different tonnage difference big ah, soft land dozen20 tons will be enoughI hope my answer is useful to you, if satisfied, please take ~!
Q: What are the general safety hazards of temporary power and piling machines in the construction site?
Piling machine electrical short circuit can not strike fire, need temporary power consumption precautions:The construction site of 1 piles and electricity should be used temporarily laying cable laying, temporary power lines should be in conformity with the special safety electricity demand, cable line of mobile often demand, should be laid by vehicle rolling, trampled and pipe, where the workpiece collision is not easy, and may not be placed in soil and water. The electrician needs at least one power outage every week to check the outer wear of the cable and find that the problems need to be dealt with in a timely manner. When the cable goes through a temporary route, it uses a steel pipe as a sheath, trenching, laying underground, and setting a firm and significant azimuth symbol.2, temporary power construction, it is necessary to set up special switch cabinet or switch box, cabinets (boxes) necessary equipment over-current, overload, short-circuit and leakage maintenance equipment. Mechanical equipment and maintenance of the switch cabinet is provided with neutral or ground, switch cabinet (box), anti rain (tide) and cabinet (box) within the switch electrical equipment, switch cabinet (box) with "electric temporary construction site safety technical specification shall be the equipment".
Q: Why is AMD's CPU name a pile driver or something?
This is the core code of CPU development, the first generation of the second generation of bulldozer called piling machine perhaps there roller and so on development of a CPU architecture, the need to re design a lot, is not a simple change, process improvement etc.,
Q: 5A few days ago bought a highway guardrail, piling machine, because the hammer piling frequency is too high, too much strength, not good control, please experts pointing adjustment method or operation method. Thank you
You can only use the nitrogen charging device to release the nitrogen from the hydraulic hammer, and remember that the value is better than the 1-1.2
Q: How can I find a pile driver?
Now a lot of special construction pile foundation construction company, contact them to see

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

Hot products


Hot Searches

Related keywords