• Ceiling T Grids T Bar for Ceiling Suspension T Bar System 1
  • Ceiling T Grids T Bar for Ceiling Suspension T Bar System 2
  • Ceiling T Grids T Bar for Ceiling Suspension T Bar System 3
Ceiling T Grids T Bar for Ceiling Suspension T Bar

Ceiling T Grids T Bar for Ceiling Suspension T Bar

Ref Price:
get latest price
Loading Port:
Tianjin
Payment Terms:
TT OR LC
Min Order Qty:
2000 pc
Supply Capability:
200000 pc/month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

Ceiling T Grid Size

1. Flat T-Bar Ceiling Suspension Grid   (Thickness: 0.2 – 0.35mm)

Main       tee   32*24*3600mm  38*24*3600mm

Long Cross tee   26*24*1200mm  

Short Cross tee   26*24* 600mm

Wall     angle   20*20*3000mm   22*22*3000mm   24*24*3000mm

2. Flat Grooved T Bar Ceiling Suspension Grid(FUT)   (Thickness: 0.2 – 0.35mm)

Main       tee   32*24*3600mm  38*24*3600mm

Long Cross tee   32*24*1200mm  38*24*1200mm

Short Cross tee   32*24*600mm  38*24*600mm

Wall     angle   22*22*3000mm   24*24*3000mm

 

The detail information of the ceiling tee grid (T-Bar, T-grid)

1.)    Be made of hot dip galvanized steel .it is fire tightness , flame retarded,soundproof,anti-aging

2.)    The connector by unique design,when you construct the ceiling, it is easy to install and not to be losened or to be detached each part..

3.)    It is also can be removed and reused without being damaged or without the use of tools.

4.)    Its suspension holes punched on the main tee and cross tee in order to increase the durability and safety of the lay-in grid suspended ceiling system. 

 

Installation steps

1.) Determine the requirment ceiling level,mark the position and fix wall angle on the wall.

2.) Hang main tee with T-bar suspension hook.

3.) Insert cross tee to the main tee.

4.) Cross tee adjacent to wall angle light fittings 

5.) Adjust the levels and alignments throughout the entire grid system accurately

6.) Install PVC gypsum ceiling tile or othermaterials ceiling panel

 

FAQ

1. Is OEM available?

Re: Yes, OEM service is available.

2. Are you factory?

Re: Yes. we are the largest factory in China.

3. Can we get sample?

Re: Yes, sample is free for our customer.

4. How many days for production

Re: usually 2 weeks after receiving of downpayment

 

Pictures 

Ceiling T Grids T Bar for Ceiling Suspension T Bar

Ceiling T Grids T Bar for Ceiling Suspension T Bar

Ceiling T Grids T Bar for Ceiling Suspension T Bar



Q: Code for construction of light steel keel gypsum board ceiling in decoration works
1) plate should be fixed in the free state to prevent the emergence of bending, convex drum phenomenon. 2) The long side of the gypsum board (ie, the wrapping edge) shall be laid in the longitudinal keel. 3) tapping screw and gypsum board edge distance: package edge to 10 ~ 15 mm is appropriate, cutting the board to 15 ~ 20 mm is appropriate. 4) fixed gypsum board sub-keel spacing should not be greater than 600 mm, our company uses 400 mm. 5) nail distance to 150 ~ 170 mm is appropriate, the screw should be perpendicular to the board. Bending, deformation of the screws should be removed, and in the 50 mm apart the other parts of the screw. 6) gypsum board seams should be properly handled by the manager of the organization of professional workers to seriously study to take strict anti-cracking measures. 7) gypsum board and keel fixed, should be from the middle of a plate to the four sides of the plate fixed, not at the same time operations. 8) screw head should be slightly embedded in the board, does not make the board surface damage, nail should be used for rust treatment and plaster putty smooth. 9) Mix the plaster putty, you must use clean water and clean the container. 4, finished product protection: ceiling decoration after installation, not free to chisel, is strictly prohibited from the upper and lower damage ceiling lamps, tuberculosis, etc. shall not be damaged and polluted ceiling; follow-up operation, should take protective measures to prevent pollution. 5, down the ceiling construction, on the ground open line ink positioning, and then hang hanging hanging out of the hanging shape of the exact location. Install the lifting of the support boom, test hanging after the temporary suspension, after leveling line, and then cut the shape of fastening. Used wood side, plywood should be carried out fire, pest control.
Q: Construction Process of Light Steel Longguard Paving
Construction points (1) according to the design of the ceiling height on the wall line, the level of tolerance ± 5 mm. (2) boom installation 1) choice of boom. Generally speaking, light steel keel ceiling selection of the boom can be based on the standard map, light steel ceiling selection diameter 6, medium, heavy selection of diameter 8. If the design has special requirements, the load is large, you need to be determined by structural design and verification. 2) According to the design or standard map to determine the hanging point spacing. Generally not on the ceiling between the 1200 ~ 1500 mm, the ceiling distance of 900 ~ 1200 mm. 3) fixed ceiling. For the cast-in-place concrete roof can be embedded in the construction of embedded boom or embedded iron, so that the boom and iron welding. In the old building or concrete orifice can be used under the nail gun hanging point iron (small angle iron) fixed, need to add a gasket. The nail must be secure (if the nail is perforated, the boom can be used to fix the boom). Or the expansion bolt under the lifting point. 4) When the boom is installed, the upper end should be welded with the embedded piece, the lower end should be set with thread, with a good nut, the end of the thread exposed to not less than 3MM.
Q: I am doing a ceiling tile for my English class. I have 2 differnet background options I want to do. It doesn't matter what background I choose I will put my name and 2013 on it. 1. Just do the whole background with blue glitter 2. Do a texas flag in glitter
I agree to take them down if you can, but use Kiltz primer first before painting. Kiltz will seal the tiles so you don't get a splotchy paint job. DO NOT use texture paint, too heavy and will crack. Kiltz is white so all you would need to do is prime and use spray glue for the glitter. Practice on something before getting carried away and ruining your ceiling. Also do not attempt unless you can remove tiles. Spray glue not good for lungs.
Q: Light steel keel ldu, cb, ldc, cs what it means
(50 * 19 * 0.5, 50 * 20 * 0.6, 60 * 27 * 0.6), DB: Ceiling keel is not on the people (including the ceiling bearing keel: 38 * 12 * 1.0 and ceiling cover keel),
Q: Light steel keel fire rating?
Light steel keel itself is a kind of steel, so fire, the general will not.
Q: Gypsum board shed light steel keel production
Cost, 9.5 gypsum board 17.6 a 2.88 square, gypsum board price of 6 yuan, keel 10 yuan (the main keel and vice dragon, hanging tendons, corners) around, artificial 8-10 yuan.
Q: Has anyone ever designed a grid on their ceiling using say 1x3's stained or painted along sheetrock seams?
depending on where your seams are I dout that it would work out right you would'nt have even no. of grids , unless it don't matter to you.
Q: T-type light steel keel TB24 * 38 What does it mean?
T-type is not on the person, the width of 24mm, height 38mm is the T-type main keel
Q: Light steel keel gypsum board partition wall
Light steel keel is a high-quality continuous hot-dip galvanized strip as a raw material, the cold bending process from the building with metal skeleton. It is used for decoration of non-load-bearing walls and roofs of concrete such as gypsum board, decorative gypsum board and other lightweight panels. Suitable for a variety of building roof decoration, the building inside and outside the wall and scaffolding ceiling of the basic material. According to the use of hanging keel and cut keel, according to cross-section of the form of V-type, C-type, T-type, L-keel.
Q: What is a Ceiling Grid?
A metal grid work structure that ceiling tiles are attached to. See them in commercial buildings and when people finish off their basement ceilings. The grid allows you to pop out a ceiling tile and access pipes, wires above the grid. Can also pop in flourescent light fixtures.

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

Hot products


Hot Searches

Related keywords