• yuchai YC120R Rotary drilling rig System 1
yuchai YC120R Rotary drilling rig

yuchai YC120R Rotary drilling rig

Ref Price:
get latest price
Loading Port:
China Main Port
Payment Terms:
TT OR LC
Min Order Qty:
-
Supply Capability:
-

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

yuchai YC120R Rotary drilling rig

Technical Specifications

Item

Parameters

Chassis

Engine Model

 

6BT5.9-150

Rated Power/Speed

kW/rpm

112/1950

Outer Width of Crawler

mm

2990

Width of Crawler Plate

mm

600

Hauling Force

kN

198

Power Head

Maximum Torque

kN·m

120

Speed

r/min

8-28

Maximum Pressure

kN

120

Maximum Pulling Force

kN

120

Pressurized Cylinder Stroke

mm

3600

Hoist

Main Hoist

 

 

First Layer of Lifting Force

kN

125

Maximum Lifting Speed

m/min

60

Diameter of Wirerope

mm

D22

Auxiliary Hoist

 

 

First Layer of Lifting Force

kN

50

Maximum Lifting Speed

m/min

65

Diameter of Wirerope

mm

D16

Mast

Rake Angle

5

Left/Right Tilt Angle

±4

Hydraulic Pump

Maximum Pressure

Mpa

34

Hole Depth

Hole Diameter

Maximum Drilling

mm

1500

Maximum Drilling Depth

m

40

Drill Pipe

Drilling Pipe

mm

377

Working Weight

t

35

Keywords:rotary drilling dig,yuchai rotary drilling dig,weichai rotary drilling rig,weichai,chinese rotary drilling rig


Q: My family is in the countryside, and now more than 100 meters behind the house in the pile is the kind of shock, our house is built in 99 years, has been very good. Since the piling, I have been shaking the door, the construction party every day for more than 8 hours, has been more than 10 days, and now I have a lot of cracks in the floor. What's the influence of our family, please? Are there any rules for investigating what should be done before piling?
The best co-ordination, not to consult the Construction Planning Bureau
Q: Is the architecture of the pile driver strong in single core performance or multi - core capability? Or?
Overall, the AMD's nuclear performance has not been improved for almost 10 years. Basically maintained at the level of K8.
Q: Principles of piling
The structure of a pile driver consists of a pile hammer, a pile stand and auxiliary equipment. The pile hammer is attached to two parallel vertical guide rods (commonly called Longmen) at the front of the pile support and hoisted with lifting hooks. The pile foundation is a steel structure tower with a windlass at the back of which is used to lift the pile and hammer. A guide frame consisting of two guide rods is used in front of the pile to control the direction of the pile driving so that the pile can be accurately penetrated into the formation in accordance with the design orientation. The tower and the guide frame can be used to batter pile deflection. The guide frame can also be extended downward along the tower and used to fetch water along the embankment or pier. The pile can move and move. The basic technical parameters of a pile driver are impact weight, impact kinetic energy and impact frequency. According to the motion of the pile hammer power source can be divided into hammer, hammer, diesel hammer, hydraulic hammer etc..
Q: Highway guardrail, piling machine, drilling, piling price
This depends on the number and the construction section of the road, if there is no stone pavement below, is in 8-10 yuan per meter, there is a stone here is another hole in a road, 35-40 yuan, this is in at least 5 kilometers above
Q: I have a pile machine construction record card, but Supervision said or not, please master pointing.
If there is any nonconformity, the rectification shall be completed and checked by the supervision.
Q: I can drive an excavator and a hammer, but I want to learn how to drive a pile driver. How long will it take to learn?
Very quickly, understand the working principle, work methods, basically on the line
Q: Why do some people need to dig the foundation and pile it up to dig a hole?
how to do?You say the digging and then piling, probably because the pile is the need for technology, such as filling piles, you do not dig, you can not do, or that you have obstacles on the surface, to dig into the original soil piling, so good control piling quality
Q: 5A few days ago bought a highway guardrail, piling machine, because the hammer piling frequency is too high, too much strength, not good control, please experts pointing adjustment method or operation method. Thank you
You can only use the nitrogen charging device to release the nitrogen from the hydraulic hammer, and remember that the value is better than the 1-1.2
Q: What is a car pile driver? I hear it's easy to use.
Yeah, yeah. You're talking about wheels. I am now using a wheeled screw, not only easy to move, the speed is very fast, is a powerful brand of Shandong piling machine, also known as force pile driver.
Q: Amd pile driver with motherboard, motherboard chipset is 970 or 990fx?
Integrated above factors, personally think that 600 yuan less than 970 is a better choice, 990FX price is too expensive. For example, Gigabyte (GIGABYTE), 970A-D3P, MSI (MSI) 970A-G46, (ASRock) 970 limit player 4 can be, the price from high to low.600 yuan or so, 970 collocation, 800-900 yuan or so FX8300 series, personal think more balanced, small amplitude overclocking can also, completely enough.

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

Hot products


Hot Searches

Related keywords