TOWER CRANE TC5013C
- Loading Port:
- Tianjin
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 1 set
- Supply Capability:
- 12 set/month
OKorder Service Pledge
OKorder Financial Service
You Might Also Like
Technology is the drive for business development and production equipment the assurance of product quality. In the large-scale concentrated production, the stability and uniformity of product quality plays an essential role. The company constantly improves processing equipment. The automatic assembly line ensured quality stability and maximally reduced adverse effect of personal factor to the product quality. As a result, the one-time qualification rate of the products is improved and the company is able to win continuous trust from customers。
1. The lifting boom and balance boom adopt cantilever boom structure, which reduces the hoisting modular and makes it more safe, convenient and flexible to install and uninstall, and reduces the requirements for hoisting equipment and the site.
2. Multiple special mounting brackets are available, which saves the installation time and ensures safe and quality installation.
3. The lifting boom adopts cantilever boom structure and variable cross-section materials, featuring more reasonable structural stress and long service life; and it is easier to make different combination of boom length.
4. It adopts standard sections (for models of over 12t) of piece assembly structure, split structure stock, and assembled platform, which meet the transport requirements for standard container.
5. The extra-long boom is designed with a rope-supporting trolley, and the speed of which is 1/2 of that of the luffing trolley, which can achieve the most optimum rope-supporting effect. The structure has applied for national patent.
6. The lifting mechanism adopts speed regulation by frequency control or by eddy current brake series resistance, featuring good lifting performance; The slewing system adopts frequency control by torque electric motor or by coil winding type electric motor with hydraulic coupler, featuring smooth operation and small slewing impact.
7. All kinds of safety devices are reliable and easy to adjust; both the safety monitoring control system and traditional safety system are available, the double system ensures safety operation of the tower crane; the hydraulic system adopts low/medium pressure design, featuring higher safety and reliability.
The construction hoist product produced has achieved internationally advanced level in terms of industrial design, control and the drive performance, as well as the operation safety and comfortableness. And is also making efforts to keep improving the product, as what the construction hoist lifts is not only people and material, but also a kind of social responsibility and service concept…
The new generation SC series of construction hoists adopt modular structure, ergonomic design and advanced manufacturing technology, thus the adaptability and reliability of the product is greatly improved, e.g. the max. lifting height can reach 300 meters. The product adopts multiple patented technologies, reaches advanced level in China, and the market share in domestic market is increasing year by year. The product has also been exported to overseas countries like Russia, Turkmenstan, Vietnam, etc. winning the confidence of customers of both home and abroad
1. The cage drive system is equipped with buffering device, so the cage moves more stable.
2. The ergonomically designed cage interior improves comfortableness.
3. The unique structural design has applied for patent.
4. The typical technologies ensure the malposition difference of the guide rail.
5. The excellent parts in the industry ensures reliable quality of the machine.
6. Precise assembly and accurate drive.
7. Professional solutions for special projects.
8. The complete safety devices ensures reliable control system.
Model | Max.lifting capacity & work range | Max.work range & lifting capacity | Max.independent lifting height(m) | |||
Torque | Lifting capacity at max.boom length | Lifting capacity(t) | Work range(m) | Work range(m) | Lifting capacity(t) | |
QTZ31.5 | TC3508 | 3 | 11.59 | 35 | 0.8 | 29 |
TC3807 | 3 | 11.15 | 38 | 0.7 | 29 | |
QTZ40 | TC4208 | 4 | 11.6 | 42 | 0.8 | 29 |
TC4708 | 4 | 13.4 | 47 | 0.8 | 29 | |
QTZ50 | TC4610 | 5 | 11.9 | 46 | 1 | 36 |
TC5010 | 5 | 13.1 | 50 | 1 | 36 | |
QTZ63 | TC5013 | 6 | 13.72 | 50 | 1.3 | 40 |
TC5013A | 6 | 13.72 | 50 | 1.3 | 40 | |
TC5510 | 6 | 13.17 | 55 | 1 | 40 | |
TC5510A | 6 | 13.17 | 55 | 1 | 40 | |
QTZ80 | TC5512 | 8 | 12.68 | 55 | 1.2 | 45 |
QTZ100 | TC6013 | 8 | 14.45 | 60 | 1.3 | 45 |
QTZ125 | TC6014A | 10 | 12.4 | 60 | 1.4 | 50 |
QTZ160 | TC6020 | 10 | 15.2 | 60 | 2 | 52.6 |
QTZ250 | TC7030 | 12 | 20.4 | 70 | 3 | 45 |
- Q: What is a tower crane without a collector?
- Without the collector, the main cable of the tower crane directly reaches the power distribution cabinet after turning.
- Q: how do they get counter-weights onto high cranes?
- The crane itself hoists them. Suppose a crane is rated to support X tons, then the optimal counter weight would be X/2 tons, an the crane has to be designed to support an imbalance of X/2 tons. If the operational crane is not lifting anything, then it has to support its unbalanced counter weight, and if it lifts its maximum load, then it has to stand an unbalanced load of (again) X/2 -- the other half of the load is balanced by the counterweight. Therefore the crane is capable of hoisting its own counterweight as an unbalanced load. It is then secured in place and the crane can then start operating to its rated maximum lifting capability.
- Q: Yesterday around 9pm I saw a crane fly flying around my living room so I got a pillow and threw it over it. Sadly it found a way to get out cause when I was going to the bathroom I saw it right by the tub and I ran out. Those things are always trying to fly to me. Anyways there attracted to light or whatever so I just turned off the light in the bathroom and living room, and shut the door! I heard my sister later in the night go in there but idk if she saw it or not. So should I just go to the bathroom or wait till my sis goes in there?!
- Crane flies are totally harmless. Don't worry about it.
- Q: Tower crane 4 how to change the rate of 2 magnification, how to change, say detailed points
- At this point, the rope will be turned into 2 fold!Some manufacturers produce pulley, also need to be in the car, and then the magnification pulley with pin shaft fixed in the car!
- Q: I know you need to put current around the magnet (or certain type of metal) in order to attract but is it possible to use as pushing an object away. if there is please tell me how!
- To push an object away, you need equipment that is low to the ground when it applies the force. Bulldozers are designed to push objects. Electromagentic cranes are designed to deal with vertical forces, so they are used to lift and drop metal objects. They use electricity to flow through coils wrapped around a metal core to generate a strong magnetic field. Trying to use them to push things could cause a crane to tip over since they are not designed to deal with horizontal forces. Even if you could get the electromagnet wired to repel metal objects, when you bring the electromagnet near the object, it would repel away in an unwieldy manner because of friction and interference with the ground. And trying to direct a large electromagnet at the end of a long chain would be difficult.
- Q: Tiger=StrengthSnake=FlexibilityCrane=Balance and the last two are?
- The traditional Shaolin animals were Tiger, Crane, Snake, Leopard, and Dragon. There are other animal systems used, including a few different Mantis and Monkey styles, as well as Dog boxing and Eagle Claw. Some systems, like Xing Yi, have sub-sets of other animals; I believe there are twelve in that system. According to Doc Fai Wong's Shaolin Five Animals Form, Crane was used for libido, Snake was used for Chi, Dragon was used for spirit, Leopard was used for tendon strength, and Tiger was used for strengthening the muscles and bones.
- Q: is was about making this game where this guy knows crane style
- Like Sensei Scandal wrote, crane style is very rooted. No flips or crazy jumps so it is not acrobatic in that respect. Posture and balance is extremely important to the power generating methods crane style utilizes. The clips Scandal provided are very good and do demonstrate the posture well. If you look closely you can see quite a bit of modern karate in them.
- Q: I know how to make cranes and I'm pretty fast at doing so but in pictures I see of crane leis the cranes look like they're folded differently so that they can be stacked on top of each other.. Can anyone teach me how to fold like that so that I can make a paper crane lei?
- But I do different from step 11 on Step 11: Normally they fold along the red line. I dont. On step 10 you see the cross line in the center +. I then fold the right pointy toward the center. Do the same for all. Step 12: I the filp the right top layer to the left, same with the back side. Step 13: fold the bottom point to the top(one layer only) filp to back side, do the same. Step 14: flip right layer to the left again, same with the back side. Step 15: Pull and done.
- Q: because i have this huge sofa i need to get to 2nd floor but i cant coz the staircase is too small
- Talk to a lumber yard that has a boom truck. Ask them how much to do it. A boom truck will cost much less than a crane. A boom truck can reach 45 to 50 feet. In this economy they are looking for anything they can get. They will most likely do it. But when really busy they wont. But things are slow. Builder 30 years. A crane will cost about 250.00 of the first hour. with a one hour min.
- Q: I'm a little confused as to what the difference is between the crane and the flare boom-____- I'm thinking that the flare boom is what they use to burn off oil I there's a fire, but is that right? And what does the crane do?
- It's called a flare boom because the flare is out on the end of a boom like structure. To keep the flame as far as possible from the rig production operations.
Send your message to us
TOWER CRANE TC5013C
- Loading Port:
- Tianjin
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 1 set
- Supply Capability:
- 12 set/month
OKorder Service Pledge
OKorder Financial Service
Similar products
Hot products
Hot Searches
Related keywords