TOWER CRANE TC5010
- Loading Port:
- Tianjin
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 1 set
- Supply Capability:
- 12 set/month
OKorder Service Pledge
OKorder Financial Service
You Might Also Like
Technology is the drive for business development and production equipment the assurance of product quality. In the large-scale concentrated production, the stability and uniformity of product quality plays an essential role. The company constantly improves processing equipment. The automatic assembly line ensured quality stability and maximally reduced adverse effect of personal factor to the product quality. As a result, the one-time qualification rate of the products is improved and the company is able to win continuous trust from customers。
1. The lifting boom and balance boom adopt cantilever boom structure, which reduces the hoisting modular and makes it more safe, convenient and flexible to install and uninstall, and reduces the requirements for hoisting equipment and the site.
2. Multiple special mounting brackets are available, which saves the installation time and ensures safe and quality installation.
3. The lifting boom adopts cantilever boom structure and variable cross-section materials, featuring more reasonable structural stress and long service life; and it is easier to make different combination of boom length.
4. It adopts standard sections (for models of over 12t) of piece assembly structure, split structure stock, and assembled platform, which meet the transport requirements for standard container.
5. The extra-long boom is designed with a rope-supporting trolley, and the speed of which is 1/2 of that of the luffing trolley, which can achieve the most optimum rope-supporting effect. The structure has applied for national patent.
6. The lifting mechanism adopts speed regulation by frequency control or by eddy current brake series resistance, featuring good lifting performance; The slewing system adopts frequency control by torque electric motor or by coil winding type electric motor with hydraulic coupler, featuring smooth operation and small slewing impact.
7. All kinds of safety devices are reliable and easy to adjust; both the safety monitoring control system and traditional safety system are available, the double system ensures safety operation of the tower crane; the hydraulic system adopts low/medium pressure design, featuring higher safety and reliability.
The construction hoist product produced has achieved internationally advanced level in terms of industrial design, control and the drive performance, as well as the operation safety and comfortableness. And is also making efforts to keep improving the product, as what the construction hoist lifts is not only people and material, but also a kind of social responsibility and service concept…
The new generation SC series of construction hoists adopt modular structure, ergonomic design and advanced manufacturing technology, thus the adaptability and reliability of the product is greatly improved, e.g. the max. lifting height can reach 300 meters. The product adopts multiple patented technologies, reaches advanced level in China, and the market share in domestic market is increasing year by year. The product has also been exported to overseas countries like Russia, Turkmenstan, Vietnam, etc. winning the confidence of customers of both home and abroad
1. The cage drive system is equipped with buffering device, so the cage moves more stable.
2. The ergonomically designed cage interior improves comfortableness.
3. The unique structural design has applied for patent.
4. The typical technologies ensure the malposition difference of the guide rail.
5. The excellent parts in the industry ensures reliable quality of the machine.
6. Precise assembly and accurate drive.
7. Professional solutions for special projects.
8. The complete safety devices ensures reliable control system.
Model | Max.lifting capacity & work range | Max.work range & lifting capacity | Max.independent lifting height(m) | |||
Torque | Lifting capacity at max.boom length | Lifting capacity(t) | Work range(m) | Work range(m) | Lifting capacity(t) | |
QTZ31.5 | TC3508 | 3 | 11.59 | 35 | 0.8 | 29 |
TC3807 | 3 | 11.15 | 38 | 0.7 | 29 | |
QTZ40 | TC4208 | 4 | 11.6 | 42 | 0.8 | 29 |
TC4708 | 4 | 13.4 | 47 | 0.8 | 29 | |
QTZ50 | TC4610 | 5 | 11.9 | 46 | 1 | 36 |
TC5010 | 5 | 13.1 | 50 | 1 | 36 | |
QTZ63 | TC5013 | 6 | 13.72 | 50 | 1.3 | 40 |
TC5013A | 6 | 13.72 | 50 | 1.3 | 40 | |
TC5510 | 6 | 13.17 | 55 | 1 | 40 | |
TC5510A | 6 | 13.17 | 55 | 1 | 40 | |
QTZ80 | TC5512 | 8 | 12.68 | 55 | 1.2 | 45 |
QTZ100 | TC6013 | 8 | 14.45 | 60 | 1.3 | 45 |
QTZ125 | TC6014A | 10 | 12.4 | 60 | 1.4 | 50 |
QTZ160 | TC6020 | 10 | 15.2 | 60 | 2 | 52.6 |
QTZ250 | TC7030 | 12 | 20.4 | 70 | 3 | 45 |
- Q: I am NCCCO certified here in the US and would like to know how to be able to work as an operator in France.
- Me too(NCCCO) how long for you? What do you run? I run a Terrex/demag a/c 140, Grove TMS 870, and a little national 40 ton. Anyway, sorry I don't have an answer but the other day just for kicks I was looking around to see what's going on and searching crane operator+job and there's a huge worldwide company, slips my mind but they kept coming up all over hiring operators all over the world. Give that a try, if I was single I'd be going everywhere, and getting PAID to do it but my wife and kids mean too much to be away. Try this.... search crane service+france email some crane outfits and ask around, it can't hurt.
- Q: I need to know how Stephen Crane came up with writing the Red Badge of Courage. I need examples of his life experiences that he had and then he put them in the Red Badge of Courage.
- In March 1893, while spending hours lounging in his friend Corwin Knapp Linson's studio while having his portrait painted, Crane became fascinated with old Civil War issues of the Century published between 1884 and 1887. Largely devoted to famous battles and military leaders, the writing was dry and lifeless and Crane, frustrated, said to Linson, I wonder that some of those fellows don't tell how they felt in those scraps. They spout enough of what they did, but they're as emotionless as rocks. Crane returned to these magazines during subsequent visits to Linson's studio and eventually the idea of writing a war novel overtook him. He would later state that he had been unconsciously working the detail of the story out through most of his boyhood and had imagined war stories ever since he was out of knickerbockers. This novel, which he believed would make him famous, would ultimately become The Red Badge of Courage. From the beginning, Crane wished to show what it felt like to be in a war by writing a psychological portrayal of fear. Conceiving his story from the point of view of a young private who is at first filled with boyish dreams of the glory of war and then quickly becomes disillusioned by war's reality, Crane borrowed the private's surname, Fleming, from his sister-in-law's maiden name. Crane would later tell Hamlin Garland that the first words and paragraphs came to him with every word in place, every comma, every period fixed.
- Q: QTZ63 (Q5610) tower crane power, how many power parts, name, model specification, product number, date of appearance
- All the details of the equipment are availableAs for power, it depends on the specific configuration of the frequency conversion and non frequency conversion will not be the same
- Q: Tower crane four limit, two insurance, two insurance what is that?
- Refers to the air switch and the electric leakage protector in the electric tray.
- Q: I still cannot grasp how a crane was taken apart on a building with no roof
- They used a climbing crane , and who said that the building has no roof? the crane parts can be dismantled on site and removed either by helicopters or using the construction lifts
- Q: I am reading catching fire and I'm at the part where Katniss just made a little dummy in the training session and she wrote the name seneca crane on it and the gamemakers were like shocked. Who is seneca crane? and whats up with her?
- Seneca Crane is the previous Game Master, the one that was killed for letting Katniss and Peeta live. She hung the dummy in the training session to make a statement about the Capitol having him killed and replaced.
- Q: The rated lifting capacity of a tower crane refers to what is allowed and what is allowed to be divided by the crane
- The total quality of the crane rated liftingweightincludes the lifting load and the hook and rope a simplified example, such as the rated lifting weight of 100 tons, the quality of the hook and spreader for 5 tons, the actual quality of the goods can lift 95 tons.
- Q: I'm talking about one of the ones where the cabin and the worker is high up in the air. You cant exactly remove a part of the bottom of the cranes structure because it would fall on top of you but you cant remove the cabin because its so high up and what can get up that high to remove it except another crane BUT how did that get built ?Thank you.
- A tower crane is usually assembled by a telescopic crane of smaller lifting capacity but greater height and in the case of tower cranes that have risen while constructing very tall skyscrapers, a smaller crane (or derrick) will sometimes be lifted to the roof of the completed tower to dismantle the tower crane afterwards. A self-assembling tower crane lifts itself off the ground using jacks, allowing the next section of the tower to be inserted at ground level.
- Q: i will like to crane operator?
- You made a statement, you will like to crane (an) operator. Which operator is it you are going to like to crane? If you mean would you like to operate a crane, that is up to you. If you mean can you be a crane operator, that is up to an employer. You need to be employed as one, and that probably means training and experience before being allowed to operate cranes for him/ her.
- Q: What kind of bodies are tower cranes made of?
- Two. The metal structure of tower craneThe metal structure of tower crane is mainly composed of underframe, tower body, jacket, upper and lower support, suspension arm, balance arm, tower top and other main components.Metal structure is the framework of tower crane, which bears the deadweight of crane and all kinds of external loads during operation.Three. Power unit and control systemThe power unit is the power source of the crane, and the power source of the tower crane is an electric motor with an external power supply.The control system includes controls and safety devices. Control device for tower crane is composed of a linkage control console, distribution box, resistor box components, the safety device is mainly composed of height limiter, amplitude limiter, lifting weight limiter, moment limiter, slewing limiter etc..Through the control system, the movement characteristic of the crane can be changed, so as to realize the starting, speed regulation, modification, braking and stopping of each mechanism, so as to achieve various actions required by the crane operation.
Send your message to us
TOWER CRANE TC5010
- Loading Port:
- Tianjin
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 1 set
- Supply Capability:
- 12 set/month
OKorder Service Pledge
OKorder Financial Service
Similar products
Hot products
Hot Searches
Related keywords