• TOWER CRANE TC5010A System 1
  • TOWER CRANE TC5010A System 2
  • TOWER CRANE TC5010A System 3
  • TOWER CRANE TC5010A System 4
TOWER CRANE TC5010A

TOWER CRANE TC5010A

Ref Price:
get latest price
Loading Port:
Tianjin
Payment Terms:
TT OR LC
Min Order Qty:
1 set
Supply Capability:
12 set/month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

 

Technology is the drive for business development and production equipment the assurance of product quality. In the large-scale concentrated production, the stability and uniformity of product quality plays an essential role. The company constantly improves processing equipment. The automatic assembly line ensured quality stability and maximally reduced adverse effect of personal factor to the product quality. As a result, the one-time qualification rate of the products is improved and the company is able to win continuous trust from customers。

1.    The lifting boom and balance boom adopt cantilever boom structure, which reduces the hoisting modular and makes it more safe, convenient and flexible to install and uninstall, and reduces the requirements for hoisting equipment and the site.
2. Multiple special mounting brackets are available, which saves the installation time and ensures safe and quality installation.
3. The lifting boom adopts cantilever boom structure and variable cross-section materials, featuring more reasonable structural stress and long service life; and it is easier to make different combination of boom length. 
4. It adopts standard sections (for models of over 12t) of piece assembly structure, split structure stock, and assembled platform, which meet the transport requirements for standard container.
5. The extra-long boom is designed with a rope-supporting trolley, and the speed of which is 1/2 of that of the luffing trolley, which can achieve the most optimum rope-supporting effect. The structure has applied for national patent.
6. The lifting mechanism adopts speed regulation by frequency control or by eddy current brake series resistance, featuring good lifting performance; The slewing system adopts frequency control by torque electric motor or by coil winding type electric motor with hydraulic coupler, featuring smooth operation and small slewing impact.
7. All kinds of safety devices are reliable and easy to adjust; both the safety monitoring control system and traditional safety system are available, the double system ensures safety operation of the tower crane; the hydraulic system adopts low/medium pressure design, featuring higher safety and reliability.

The construction hoist product  produced has achieved internationally advanced level in terms of industrial design, control and the drive performance, as well as the operation safety and comfortableness. And is also making efforts to keep improving the product, as what the construction hoist lifts is not only people and material, but also a kind of social responsibility and service concept…
The new generation SC series of construction hoists adopt modular structure, ergonomic design and advanced manufacturing technology, thus the adaptability and reliability of the product is greatly improved, e.g. the max. lifting height can reach 300 meters. The product adopts multiple patented technologies, reaches advanced level in China, and the market share in domestic market is increasing year by year. The product has also been exported to overseas countries like Russia, Turkmenstan, Vietnam, etc. winning the confidence of customers of both home and abroad

1. The cage drive system is equipped with buffering device, so the cage moves more stable.
2. The ergonomically designed cage interior improves comfortableness.
3. The unique structural design has applied for patent.
4. The typical technologies ensure the malposition difference of the guide rail.
5. The excellent parts in the industry ensures reliable quality of the machine.
6. Precise assembly and accurate drive.
7. Professional solutions for special projects.
8. The complete safety devices ensures reliable control system.
 

 

 

Tower Cranes(Top-Slewing)    

Model

Max.lifting capacity & work range

Max.work range & lifting capacity

Max.independent lifting height(m)

Torque

Lifting capacity at max.boom length

Lifting capacity(t)

Work range(m)

Work range(m)

Lifting capacity(t)

QTZ31.5

TC3508

3

11.59

35

0.8

29

TC3807

3

11.15

38

0.7

29

QTZ40

TC4208

4

11.6

42

0.8

29

TC4708

4

13.4

47

0.8

29

QTZ50

TC4610

5

11.9

46

1

36

TC5010

5

13.1

50

1

36

QTZ63

TC5013

6

13.72

50

1.3

40

TC5013A

6

13.72

50

1.3

40

TC5510

6

13.17

55

1

40

TC5510A

6

13.17

55

1

40

QTZ80

TC5512

8

12.68

55

1.2

45

QTZ100

TC6013

8

14.45

60

1.3

45

QTZ125

TC6014A

10

12.4

60

1.4

50

QTZ160

TC6020

10

15.2

60

2

52.6

QTZ250

TC7030

12

20.4

70

3

45

 

 

 

Q: How difficult is white crane boxing? Where can I find a teacher near Cleveland, Ohio? I've never tried any type of kung fu.
Frank and Mito are precise IMHO. that is probable a kind linking itself to the previous. optimistically, that is not purely linking itself to the Karate toddler..ha ha. And it probable is on the up and up... yet i could be careful anyhow. This decision can impression your preparation for years. stable success!
Q: I'm confused about one of the final scenes, where Seneca Crane is locked in the room with the nightlock berries. Does this mean that he is supposed to eat the berries and presumably die? Or is it symbolism of some sort of distaste in the way he ended the Games?
Yeah, basically President Snow has him killed. The berries represent this. The whole point is he goes into the room, sees the berries and knows he is being killed for allowing Katniss and Peeta to use those berries to cheat the system.
Q: would 2 500 ton crawler cranes be able to lift a 854 ton bridge section 80 feet in the air?
Sorry, okorder /... The farther from the center of rotation of the House, the less a crane can lift. That same crane can only lift 57.5 tons at 22 meters from the center of rotation of the House. Ben
Q: More specifically, do Sandhill Cranes eat squirrels?
NO!!!!!!!!!!!!!!!
Q: Ok I got these huge mosquito things in my house and found out they are crane flies. I got up this morning and there are several hanging from my ceiling on a long single strand of silk or web. Is this unusual? Its really weird.
Most okorder
Q: the red badge of courage, a novel about the civil war, the verb wrote is A) transitiveB) intransitive
Transitive - because it has an object The Red Badge of Courage. . Generally, if you can put the word something after a verb, it is transitive. Stephen Crane wrote something .
Q: this wind speed refers to that height of wind speed?
Surface wind speed is greater than 6
Q: Are the creators of the Karate Kid movies apologetic about the white crane defensive stance?
Why should they be? That stance is from an art that is practiced by a small number of practitioners in Okinawa known as Hakutsuru, which means White Crane. It was hollywood-ized... so what? The original movie was written by a practitioner of Goju Ryu, who trained in NYC under an instructor from the Bronx named Kao Loong Ong. He knew there was a link between White Crane and the development of Okinawan Karate. Robert Kamen trained with Kayo, as he is known, who is Chinese and is well known in NYC's China Town. If they should apologize, hollywood must apologize for their misrepresentation of SO many things - insults to practically all the cultures of the world.
Q: What is the allowable range of vertical deviation for tower cranes?
Independent height 4/1000, attachment height 2/1000 under top wall!

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

Hot products


Hot Searches

Related keywords