TOWER CRANE TC5013S
- Loading Port:
- Tianjin
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 1 set
- Supply Capability:
- 12 set/month
OKorder Service Pledge
OKorder Financial Service
You Might Also Like
Technology is the drive for business development and production equipment the assurance of product quality. In the large-scale concentrated production, the stability and uniformity of product quality plays an essential role. The company constantly improves processing equipment. The automatic assembly line ensured quality stability and maximally reduced adverse effect of personal factor to the product quality. As a result, the one-time qualification rate of the products is improved and the company is able to win continuous trust from customers。
1. The lifting boom and balance boom adopt cantilever boom structure, which reduces the hoisting modular and makes it more safe, convenient and flexible to install and uninstall, and reduces the requirements for hoisting equipment and the site.
2. Multiple special mounting brackets are available, which saves the installation time and ensures safe and quality installation.
3. The lifting boom adopts cantilever boom structure and variable cross-section materials, featuring more reasonable structural stress and long service life; and it is easier to make different combination of boom length.
4. It adopts standard sections (for models of over 12t) of piece assembly structure, split structure stock, and assembled platform, which meet the transport requirements for standard container.
5. The extra-long boom is designed with a rope-supporting trolley, and the speed of which is 1/2 of that of the luffing trolley, which can achieve the most optimum rope-supporting effect. The structure has applied for national patent.
6. The lifting mechanism adopts speed regulation by frequency control or by eddy current brake series resistance, featuring good lifting performance; The slewing system adopts frequency control by torque electric motor or by coil winding type electric motor with hydraulic coupler, featuring smooth operation and small slewing impact.
7. All kinds of safety devices are reliable and easy to adjust; both the safety monitoring control system and traditional safety system are available, the double system ensures safety operation of the tower crane; the hydraulic system adopts low/medium pressure design, featuring higher safety and reliability.
The construction hoist product produced has achieved internationally advanced level in terms of industrial design, control and the drive performance, as well as the operation safety and comfortableness. And is also making efforts to keep improving the product, as what the construction hoist lifts is not only people and material, but also a kind of social responsibility and service concept…
The new generation SC series of construction hoists adopt modular structure, ergonomic design and advanced manufacturing technology, thus the adaptability and reliability of the product is greatly improved, e.g. the max. lifting height can reach 300 meters. The product adopts multiple patented technologies, reaches advanced level in China, and the market share in domestic market is increasing year by year. The product has also been exported to overseas countries like Russia, Turkmenstan, Vietnam, etc. winning the confidence of customers of both home and abroad
1. The cage drive system is equipped with buffering device, so the cage moves more stable.
2. The ergonomically designed cage interior improves comfortableness.
3. The unique structural design has applied for patent.
4. The typical technologies ensure the malposition difference of the guide rail.
5. The excellent parts in the industry ensures reliable quality of the machine.
6. Precise assembly and accurate drive.
7. Professional solutions for special projects.
8. The complete safety devices ensures reliable control system.
Model | Max.lifting capacity & work range | Max.work range & lifting capacity | Max.independent lifting height(m) | |||
Torque | Lifting capacity at max.boom length | Lifting capacity(t) | Work range(m) | Work range(m) | Lifting capacity(t) | |
QTZ31.5 | TC3508 | 3 | 11.59 | 35 | 0.8 | 29 |
TC3807 | 3 | 11.15 | 38 | 0.7 | 29 | |
QTZ40 | TC4208 | 4 | 11.6 | 42 | 0.8 | 29 |
TC4708 | 4 | 13.4 | 47 | 0.8 | 29 | |
QTZ50 | TC4610 | 5 | 11.9 | 46 | 1 | 36 |
TC5010 | 5 | 13.1 | 50 | 1 | 36 | |
QTZ63 | TC5013 | 6 | 13.72 | 50 | 1.3 | 40 |
TC5013A | 6 | 13.72 | 50 | 1.3 | 40 | |
TC5510 | 6 | 13.17 | 55 | 1 | 40 | |
TC5510A | 6 | 13.17 | 55 | 1 | 40 | |
QTZ80 | TC5512 | 8 | 12.68 | 55 | 1.2 | 45 |
QTZ100 | TC6013 | 8 | 14.45 | 60 | 1.3 | 45 |
QTZ125 | TC6014A | 10 | 12.4 | 60 | 1.4 | 50 |
QTZ160 | TC6020 | 10 | 15.2 | 60 | 2 | 52.6 |
QTZ250 | TC7030 | 12 | 20.4 | 70 | 3 | 45 |
- Q: (a)What is the power output of the crane. (ignoring losses)?(b)If it takes the cran2 2 minutes to raise the payload to its final height, how far above the ground is this?(c)If the cable were to break as the payload reaches its final height, how fast would it be traveling as it hit the ground?
- a) As the crane is lifting at constant speed, there is no acceleration on the payload, therefore the net forces on the payload are equal to 0. Therefore the crane overcomes just the force of gravity = 500*9.81 = 4905 N Power = force * velocity = 4905 * 0.7 = 3433.5 W b) distance = speed * time = 0.7 * (2 * 60) = 84 m c) assuming that the cable breaks while it is still going up at 0.7 m/s, therefore initial velocity upwards = 0.7 m/s. using v? = u? + 2as: v? = 0.7? + 2(-9.8)(-84) = 1646.89 v = √(1646.89) = 40.9 m/s the payload will be travelling at 40.9 m/s when it hit the ground.
- Q: i have a 83 camaro crane cam 305 v 8 4brrl edelbrock carb and i just changed the carb from a quadrajet to the edelbrock....but i cant seam to get it running right as long as im out on the highway it runs great but when i stop at a stop light i have to rev it up to keep it running..i changed the plugs plug wires and the distributor but i heard you have to have a different kind of distributor to change from the quareajet ( will all of the plug in and stuff to a regular edelbrock carb..is this true??
- If you can get vacuum from the intake manifold to the distributor advance, there is no reason to change distributors. You may need to re-jet the idle. Also if the cam is too steep and/or the carburetor is too big, the engine will flood. Check with Crane on timing changes and idle settings. The idle may need to be set up a little.
- Q: i need the names of the organisms. like names of insects or fish or what ever they eat. give the organism's name. don't just say fish or insects. i need specific names.this is for a biology project.
- Diet okorder /.. I'm sorry, I couldn't find any specific names, but here are some general ones. Sorry again.
- Q: A. Designated operatorsB. All construction site personnelC. InspectorsD. All of the above
- Crane are extremely dangerous and complicated machinery , the operators need intensive education and training , they have to pass the required tests to be certified . Now even the signal guy on the ground who helps the crane operator needs to be certified . So your answer is A.
- Q: When the tower crane top height is more than meters
- Three, lifting and installation, demolition works(1) lifting projects with unconventional lifting equipment and methods with single lifting weights of 100kN and above.
- Q: I have to build a hydralic system that can pick up a paper clip . the supplies you are allowed to use are 10 straws, 5 pipe cleaners, 1 yard of masking tape. 10 note cards. 2 syringes and tubing. 5 rubber bands. 8 popsicle sticks. 2 feet of string. 1 magnet. Please help.
- build a basic crane out of your materials and thread the string to the magnet hold it on with tape secure opposite end of the string to the plunger on one syringe. and fix this syringe(syringe 1) to the frame of the crane. position the plungers of both syringes at mid point, and fill both with water, and fill your tubing with water. connect the needle ends of both syringes together with the tubing. pushing the plunger on syringe 2 will cause the plunger in syringe 1 to move out. pulling the plunger on syringe 2 will cause the plunger on syringe 1 to retract and can be used to lift the paperclip.
- Q: How much should the verticality of a tower crane be controlled? Thank you
- No, the wind speed is not more than 3m/s, the independent state tower (or attached state highest attachment point above the tower axis) lateral verticality tolerance is 4/1000, the highest tower axis perpendicularity allowed attachment line below the point of difference is 2/1000.
- Q: What did Stephen crane contribute to history?
- I think his greatest contribution was The Red Badge of Courage. It was the most ealistic portrayal of a Civil War soldier written at the time; so real, in fact, that veterans swore the had fought alongside him during battle (Crane wasn't even alive during the war).
- Q: What is the Tower crane Roadb track laying criteria?????????
- The okorder ) track in the vertical and horizontal direction is not more than 1 / 1000. (we Should use the standard instrument, two tracks, and keep in10m range ,Measuring not less than 3 periods, respectively,taking the average).
- Q: What category is a Crane bird?
- Order GRUIFORMES Family GRUIDAE Not sure where you live...but there are only 2 species of Crane that live in the U.S. : the Sandhill Crane and the endangered Whooping Crane.
Send your message to us
TOWER CRANE TC5013S
- Loading Port:
- Tianjin
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 1 set
- Supply Capability:
- 12 set/month
OKorder Service Pledge
OKorder Financial Service
Similar products
Hot products
Hot Searches
Related keywords