• TOWER CRANE TC5013S System 1
  • TOWER CRANE TC5013S System 2
  • TOWER CRANE TC5013S System 3
  • TOWER CRANE TC5013S System 4
TOWER CRANE TC5013S

TOWER CRANE TC5013S

Ref Price:
get latest price
Loading Port:
Tianjin
Payment Terms:
TT OR LC
Min Order Qty:
1 set
Supply Capability:
12 set/month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

 

Technology is the drive for business development and production equipment the assurance of product quality. In the large-scale concentrated production, the stability and uniformity of product quality plays an essential role. The company constantly improves processing equipment. The automatic assembly line ensured quality stability and maximally reduced adverse effect of personal factor to the product quality. As a result, the one-time qualification rate of the products is improved and the company is able to win continuous trust from customers。

1.    The lifting boom and balance boom adopt cantilever boom structure, which reduces the hoisting modular and makes it more safe, convenient and flexible to install and uninstall, and reduces the requirements for hoisting equipment and the site.
2. Multiple special mounting brackets are available, which saves the installation time and ensures safe and quality installation.
3. The lifting boom adopts cantilever boom structure and variable cross-section materials, featuring more reasonable structural stress and long service life; and it is easier to make different combination of boom length. 
4. It adopts standard sections (for models of over 12t) of piece assembly structure, split structure stock, and assembled platform, which meet the transport requirements for standard container.
5. The extra-long boom is designed with a rope-supporting trolley, and the speed of which is 1/2 of that of the luffing trolley, which can achieve the most optimum rope-supporting effect. The structure has applied for national patent.
6. The lifting mechanism adopts speed regulation by frequency control or by eddy current brake series resistance, featuring good lifting performance; The slewing system adopts frequency control by torque electric motor or by coil winding type electric motor with hydraulic coupler, featuring smooth operation and small slewing impact.
7. All kinds of safety devices are reliable and easy to adjust; both the safety monitoring control system and traditional safety system are available, the double system ensures safety operation of the tower crane; the hydraulic system adopts low/medium pressure design, featuring higher safety and reliability.

The construction hoist product  produced has achieved internationally advanced level in terms of industrial design, control and the drive performance, as well as the operation safety and comfortableness. And is also making efforts to keep improving the product, as what the construction hoist lifts is not only people and material, but also a kind of social responsibility and service concept…
The new generation SC series of construction hoists adopt modular structure, ergonomic design and advanced manufacturing technology, thus the adaptability and reliability of the product is greatly improved, e.g. the max. lifting height can reach 300 meters. The product adopts multiple patented technologies, reaches advanced level in China, and the market share in domestic market is increasing year by year. The product has also been exported to overseas countries like Russia, Turkmenstan, Vietnam, etc. winning the confidence of customers of both home and abroad

1. The cage drive system is equipped with buffering device, so the cage moves more stable.
2. The ergonomically designed cage interior improves comfortableness.
3. The unique structural design has applied for patent.
4. The typical technologies ensure the malposition difference of the guide rail.
5. The excellent parts in the industry ensures reliable quality of the machine.
6. Precise assembly and accurate drive.
7. Professional solutions for special projects.
8. The complete safety devices ensures reliable control system.
 

 

 

Tower Cranes(Top-Slewing)    

Model

Max.lifting capacity & work range

Max.work range & lifting capacity

Max.independent lifting height(m)

Torque

Lifting capacity at max.boom length

Lifting capacity(t)

Work range(m)

Work range(m)

Lifting capacity(t)

QTZ31.5

TC3508

3

11.59

35

0.8

29

TC3807

3

11.15

38

0.7

29

QTZ40

TC4208

4

11.6

42

0.8

29

TC4708

4

13.4

47

0.8

29

QTZ50

TC4610

5

11.9

46

1

36

TC5010

5

13.1

50

1

36

QTZ63

TC5013

6

13.72

50

1.3

40

TC5013A

6

13.72

50

1.3

40

TC5510

6

13.17

55

1

40

TC5510A

6

13.17

55

1

40

QTZ80

TC5512

8

12.68

55

1.2

45

QTZ100

TC6013

8

14.45

60

1.3

45

QTZ125

TC6014A

10

12.4

60

1.4

50

QTZ160

TC6020

10

15.2

60

2

52.6

QTZ250

TC7030

12

20.4

70

3

45

 

 

 

Q:Do they need another crane to get the concerete blocks to the top? And how do they move the blocks from one end of the crane to another. This has been bothering me for some time so anyone who knows the answer I would love to hear it!
Its simple man, The company produces the concrete blocks called as hollow blocks also, they are lifted up using man power or lifts or cranes, dont know what was difficult to you in understanding that.
Q:I am currently in the Air Force reserves as a heavy equipment operator. I really want to learn how to become a tower crane operator. How would I go about doing this? I live in CA.
Hey Patrick, I was formerly a tower crane erector out of Washington DC. BUt, to yor question, I wold highly recommend you go to your town's Operator engineers Union Hall and inquire as to the qualifications and requirements to enroll in their apprenticeship program. Yes you will have to go thru the apprenticeship program. A tower crane operator is a coveted job among operators... You have to learn to hold your 'P for long periods as well as have great depth perception You coming out of the service, you should be given some preference Good luck
Q:what are the number meanings for paper cranes?
Hey Mary, Don't let the web site name fool you, it does discuss the deeper meaning behind paper cranes. Steeped in ancient myths and carrying resonant cultural meanings, the crane occupies a central role in the Asian imagination. Anyone who has witnessed cranes flying through the early morning mist over shimmering green rice paddies will readily understand how the mysterious beauty of the crane has captivated Asian life and art for centuries. Like the dragon, tiger, and phoenix, the crane ranks among the favorite motifs for Asian artwork because of its rich meaning and history. Read more at the web sites.
Q:Well I folded 100 or so cranes from cheap origami paper (red, yellow, green and blue) before I decided that I could fold 1000 cranes a reality. My dilemma is, do I keep the 100 cranes I did and fold 900 of them to fulfill my wish? Or if I discard the 100 cranes and fold 1000, will my wish be granted on the 900th crane? The reason I want to discard the 100 cranes is because it's for my wedding and the color placement of the old cranes isn't fitting at all.Yes I'm aware it's not scientific or realistic, but it's more of faith, I'm not dumb.
Consider what you would like your 100 cranes to mean. Attach strings to your 100 cranes and then hang them in a tree etc so that the wind may carry your prayers where they need to go. Then start again to create the 1000 paper cranes you want for your wedding. PS: The making of the paper cranes involves an act of faith, not the right colour to match your wedding plans. In Japan, the crane represents peace and healing. When we consider the famous Japanese art-form of paper folding (origami) the crane comes to mind before all else. Sadako and the Thousand Paper Cranes (1977), a non-fiction children’s book written by American author Eleanor Coerr, tells the story of young Sadako Sasaki who lived in Hiroshima at the time of the atomic bombing. Sadako developed leukaemia as a consequence, and lived out the remainder of her short life in a nursing home desperately trying to create one thousand paper cranes. Supposedly, if someone could make a thousand paper cranes his/her wish would come true. Sadako wanted to live. Sadly, she only managed to fold 644 cranes. After her death, friends and family folded the remainder, and buried her with the one thousand paper birds. Today, a statue of Sadako holding an enormous golden origami crane stands in the Hiroshima Peace Park. People regularly leave paper cranes. The plaque on the statue reads “This is our cry. This is our prayer. Peace on Earth.”
Q:Ty Crane is the star basketball player for st.francis, what is he doing now? Where is he? Why is he not in the NBA?
Ty Crane is actually at Venice Beach in Los Angeles I just saw him, he was selling his mix tapes, we talked then he said he was Ty Crane the actor from Coach Carter. He smiled eveytime he said he was a movie star. Go to Venice beach by the weights and courts and you will see him there!!
Q:Okay, well obviously, in The Legend of Sleepy Hollow,he was ugly, but wat exactly made him ugly?? it tells you, but its way too complicated for me. Could anybody just make it... simpler?
Here is a simpler way to describe how he looked. tall but exceedingly lank Narrow shoulders long arms and legs hands that dangled a mile out of his sleeves feet that might have served as shovels whole frame loosely hung together head small, flat at top huge ears large green glassy eyes long snipe nose spindle neck (later compared to a grasshopper because of his posture on horseback trying to get away from the headless horseman.) He wasn't exactly ugly. He was full of himself. He thought he was the smartest person in town. He took advantage of people. (all but Katrina, who took advantage of him.) He also believes in all the myths, legends, and tall tales to be taken literally. He is frightened by anything that reminds him of ghosts or demons. That is why he is so frightened by the headless horseman. Hope I helped. I am also reading the legend of sleepy hollow at the moment for school. I have to do an essay on what he looks like and acts like. So I looked it up and found this. Hope it helps you.
Q:How do you get a crane down from a tall building once it's completed?
You don't have to worry about that in the deep south! There are no high buildings
Q:Construction tower crane operator certificate expires, how to verify?
Chongqing "construction crane operator qualification certificate", the need for training after the exam this year, Yubei District has organized a meeting, other areas will organize can ask the competent department, the Department in charge of the Certification Committee is.The following is a notice of the Yubei District organizing examination for your reference:Notice of Chongqing Yubei District construction post training center on training courses for construction lifting machinery operatorsAll construction enterprises, mechanized companies, tower crane leasing companies:In order to strengthen our district housing construction sites and municipal engineering site crane operations personnel management, improve personnel quality, prevent and reduce accidents, according to the State Quality Inspection Administration, the Ministry of construction and the Municipal Construction Committee of the spirit of the relevant documents and regulations. After the study, we decided to hold a training course for construction machinery operators, and hereby notify the relevant matters as follows:I. training objects and registration requirementsWhere the construction enterprises in our district and the relevant units engaged in or engaged in the work, at least 18 years of age, women are not more than 55 years of age, male, no more than 60 years of age, junior high school education, good health.
Q:in the Open Boat by Stephen Crane, in part IV why are the characters not identified?
The characters are defined by their roles on the boat. Their previous experiences or personalities don't matter here. It is just the narrow repetitive experience of rowing and how they each contribute to it. Each character is Everyman, being thrown around by the merciless, indifferent hand of Fate. I think that Crane was squarely in the company of Naturalists (they think there's no such thing as individual agency, like Darwinism in fiction). The interesting thing to think about here is that one character has a name - Billie, the oiler. Why is this? He's the strongest, he's the most experienced and he's the one that dies. He's an individual to the reader but Fate doesn't care. I'm sure you can flesh the ideas out now.
Q:I have this assignment to find out how a climbing crane is able to move up the building as construction continues.
They add extra stages from the bottom. A tower crane is erected from a boom assembly, first and second tower sections of different cross section, and a base in a sequence of steps in which the boom assembly is mounted on a hollow climbing section dimensioned to be received in each of the larger second tower sections and defining a cavity dimensioned to receive each of the first tower sections. One of the latter is secured on a base in upright position, and the upright section is received in the cavity of the climbing section which is then raised relative to the first section and enveloped by one of the second sections. The enveloping section is secured to the base and the raised climbing section for supporting the climbing section whereupon the first tower section may be released from the base, raised, and secured to the second tower section. The climbing section may then be raised relative to the first tower section to permit the installation of another second section, and the procedure repeated, until all second or larger tower sections are superimposed on each other, the one first section being ultimately attached to the topmost second section. When the climbing section is raised relative to the attached first section, another first section may be superimposed on the one first section and the procedure repeated until the slimmer portion of the tower is assembled from superimposed first sections. Ultimately, the boom assembly is attached to the topmost first tower section, and the climbing section may be removed or stored for further use on the wider, lower tower portion.

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

Hot products


Hot Searches

Related keywords