• Tower Crane SCD90 With high efficiency and excellent timing capacity System 1
  • Tower Crane SCD90 With high efficiency and excellent timing capacity System 2
  • Tower Crane SCD90 With high efficiency and excellent timing capacity System 3
  • Tower Crane SCD90 With high efficiency and excellent timing capacity System 4
Tower Crane SCD90 With high efficiency and excellent timing capacity

Tower Crane SCD90 With high efficiency and excellent timing capacity

Ref Price:
get latest price
Loading Port:
Shanghai
Payment Terms:
TT or LC
Min Order Qty:
1 unit
Supply Capability:
1000 unit/month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing
KIND REMINDER:
WE ALSO MANUFACTURE OTHER TYPES OF MASTSECTION AND OTHER TOWER CRANE
SPARE PARTS, SUCH AS LIFTING JIB, TIE-IN
COLLAR, CLIMBING CAGE AND HOOK.  
WE WISH TO PRODUCE MOST-SATISFIED PRODUCTS FOR YOU!

PLEASE FREELY CONTACT US FOR INQUIRY!


Specification of SCD90


Jib Length: 45m

Tip load:2.2ton

Max Load:8ton

Free standing height: 52m(2X2X3m mast section); 34m (1.6X1.6X3m mast section)

Hoisting Mechanism: 45RCS20 or 30LVF

Luffing:30RWA

Slewing: RCV95

Container loading for free standing height:5X40HQ

Tower Crane SCD90 With high efficiency and excellent timing capacity

1.With high efficiency and excellent timing capacity, the tower crane is liable and safe. The rotating structure is driven by Epicyclic reducer. The elevating system is featuring in tight structure, high efficiency, convenient to use and maintain and safety.

2.Safety devices are integral and belong to mechanic and electric appliances with great reliability and can be used in wild and harsh environment.

3.The tower crane applies hanging jibs with large breadth and bi-tie bars. The jibs is very rigid , light in weight, pleasing to eyes, small in base with great capacity to shoulder pressure and resist wind.

 


Q: If so, what time of year?
I have lived and worked in Lyon and have never seen a crane fly in the built up area of the city, even when they are at their most active, which is in June. There are some that fly about in gardens but in any case they are harmless even though some people are freaked out by the way they fly. It is their grubs, the Leather Jackets, which are hated by gardeners as they are detrimental to lawns.
Q: can anyone help me in telling me how to construct an electromagnetic crane or help me find a website which helps with the steps in constructing one. thank you
www.okorder /.. Add a childs toy crane and you have a Electromagnetic crane Ta Da.......
Q: What kind of equipment must be installed on luffing trolley of horizontal luffing tower crane?
It must be installed:To prevent the trolley cable broken car slip away;The car must have a support wheel to prevent the trolley from hanging in the middle.
Q: Please give a scripted answer. Funniest Denny Crane comment and action gets the 10 points
Did you just fart?
Q: I used to buy a new tower crane that was attached to someone else's unit and (the key Gou Er). Now I have set up a company myself and bought a key, Gou Er. The question is, now how can I put it back from someone else's key dog and bring it back to my own dog?Know about the urgent urgent urgent urgent call to inform the mobile phone can ah ~ ~ ~ ~ ~ ~ thank you!
Measures for the record and registration of construction hoisting machineryArticle 1 These measures are formulated in accordance with the provisions on the supervision and administration of the safety of construction cranes' machinery (Order No. 166th of the Ministry of construction) in order to strengthen the management of the record and registration of construction cranes.The construction and registration of the hoisting machinery as mentioned in the present Measures shall include the registration of the lifting machinery, the installation (disassembly), the notification and the use of the registration of the second.Third construction departments of the people's governments at or above the county level may use the computer information management system to handle the registration and registration of construction hoisting machinery, and establish a database.The construction administrative department of the local people's government at or above the county level shall provide the registration and registration and inquiry service of the building hoisting machinery within its administrative area.Article fourth rental, installation and use of units shall be submitted in accordance with the provisions of the lifting of construction machinery registration information, and the authenticity of the information provided by the responsible.The construction administrative department of the local people's government at or above the county level shall establish a system for the examination and registration of the hoisting machinery.Fifth construction machinery rental units or purchase building lifting units (hereinafter referred to as the "property units") in the construction machinery rental for the first time or before the installation, should be registered at the competent construction Department of the local people's governments at or above the county level to the unit of business (hereinafter referred to as the "equipment registration authority") for the record.
Q: i need a summary for the story cranes by hwang sunwon?
Cranes, by Hwang Sunwon, depicts two friends and their contrasting political views. Fond memories of their past adventures cool the hatred between them. It is almost mind-boggling to think that one day we would face our friends and have to murder them because of our differing ideology.
Q: why are siberian cranes endangered?
The status of this crane is critical, as it is expected to undergo a rapid population decline in the near future. The wintering site in China holding 95% of the population is threatened by hydrological changes caused by the Three Gorges Dam.
Q: It frustrates me every time I play one of those games i never win. Is there a secret? If so then what is it?
It depends which type of animal crane you are talking about. If it's the jumbo cranes that pick up the huge stuffed animals, they are actually set to give out a win every so many plays, however the number of the winning play varies based on the location. If you are talking about the average sized cranes, the key is to look for a stuffed animal that is light up on top and bottom heavy. This will allow you to grab ahold of the head or neck and pick the animal up. I've found the easiest cranes to win on are the ones that you pick up beanie baby sized stuffed toys. They seem to win, every time you aim the crane to pick up the head or neck. It's a great way to rack up a lot of stuffed animals. While they may not be huge prizes they are reasonable ones, and some of them are pretty cute.
Q: What is the allowable range of vertical deviation for tower cranes?
Previous answers to this question have been made. In the industry standard "construction site inspection of machinery and equipment technical specification" (JGJ160-2008), in the form of mandatory provisions: the tower crane installation height to basic design requirements, the axis of the tower line should be no more than 0.4% of the bearing surfaces of the lateral vertical deviation; after the attachment, the highest attachment point following the vertical deviation should be less than 0.2%. "The basic height of the design requirements" in the "strong regulation", that is, the maximum independent installation height on the site".
Q: You know those big cranes that sometimes hang above constructed buildings. I usually thought a crane is used to build that crane but then how is that first crane that built the crane get there in the first place?
from the ground up

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

Hot products


Hot Searches

Related keywords