Tower Crane TCP5013A/TC5013 Topless Topkit
- Loading Port:
- China main port
- Payment Terms:
- TT or LC
- Min Order Qty:
- 1 unit
- Supply Capability:
- 30 unit/month
OKorder Service Pledge
OKorder Financial Service
You Might Also Like
Main Features of Tower Crane
We have full range topkit/topless/inner climbing tower crane, in addition to it's advanced parameters, reliable performance, well-looking appearance, and excellent quality.
It has characteristica such as long boom, largeworking coverage, hydraulic rising, and tandem mounted tower body.
It's design idea shows advantages including simple structure and good applicability, convenient maintainability, and lower price at the same time to emphasize meeting the requirement from construction units at different levels.
It's lifting height is obviously increased thanks to its self-erecting and wall attached function.
It is applicable for construction of different industrial, commercial, office, and civil building lower than 220m, and becomes an ideal service-building machine at home.
Specification of Tower Crane
Images of Tower Crane
FAQ about Tower Crane
Q: What kinds of tower crane are available now?
A: Four main categories: normal tower crane with cat head, internal climbing tower crane , top less tower crane and luffing tower crane.
Q: What kind of steel used for tower crane ?
A: Normally, as for the main force bearing steel structure, Q345B is adopted; as for the assistance force bearing steel structure Q235B is adopted. All of the raw material is outsourced from qualified steel factory in China.
Q: What about our tower crane warranty?
A: Usually there is one-year quality warranty including main electronic parts (not including consumable parts). There are consumable spare parts together with whole machine and normally they are enough for one year.
Q: What is 3 main mechanism of the tower crane ?
A: there are trolleying mechanism/ slewing mechanism/ hoisting mechanism.
Q: Can you equip with light on tower crane jib, monitor, remote control and anemometer?
A: Sure. All of these could be provided with extra cost upon the clients' requirements. But according to general practice, remote control is not suggested because most of the operator feedback operation in the cabin will provide a wide working view.
- Q: Did Noah build the Ark with no power tools, nails, or crane?
- What do you mean, he didn't have any cranes? Back in those days, before dinosaurs were wiped out in the flood, Brontosauruses were used as cranes. Haven't you ever watched the Flintstones?
- Q: I've heard that daddy longlegs aka crane flies contain the most deadly venom of all insects. The only reason they aren't dangerous or deadly is because they have no mouth or 'straw' to inject the venom. But I'm not sure what's correct. Although they cannot harm us humans, is it possible for them to be able to inject the venom into other creatures?Also, I've heard that dragonflies contain deadly venom too, but just like with the crane flies, they cannot transfer the venom any way. Is this true?Any zoology professionals? Note: I may need correcting, and this may even be just an urban myth.Thanks for your time!
- Most Venomous Insect
- Q: How to build a strong paper crane?
- Fact: paper is relatively strong when you pull on it, but when you push on it, it easily crumples. Build your crane out of several bars. Bars that are being pushed upon by the weight need to resist the crumpling. A good way to do this is to roll a sheet of paper into a tube form to make the bars. Bars that are only being pulled on don't need to be more than a sheet of paper. A frame cranes are simple to make: www.lni.wa /wisha/rules/generalsafety/images/24_d2_a-frame.gif
- Q: Do self lifting tower cranes allow a small swing of the boom in jacking operation?
- The upper crossbeam of the jack is connected with the jacking frame, and the lower cross beam is provided with a movable claw, and the lower supporting point can fall on the step of the standard section of the tower body. During lifting, first trim jib and balance arm, unlock the top are connected with a lifting sleeve frame with the standard section, start lifting system, lifting jack will superstructure.
- Q: how do they get the construction crane onto the the tall buildings?
- There are two cranes, one lifts the other and construction workers build a scaffold under it. Then the higher crane lifts the lower one and the workers buiold a scaffold under it, this continues until they are as high as they need to be.
- Q: Wall mounted tower crane
- The construction of tower crane installation, operation and dismantling safety technical regulations "(JGJ196-2010) design provisions in article 3.3 attachment device of tower crane: when the tower crane attachment for use, attachment device settings and free height should comply with the provisions of the instructions; when the attachment level distance, attachment spacing does not meet the the instructions to.
- Q: I looking for information on the surname Crane.?
- There okorder
- Q: It got me thinking.
- I have not seen the movie, but I think I saw what you're talking about on a preview. I would think that the safeties involved in the control system for a crane would make it highly unlikely to happen. There is no absolute assurance, only probabilities or likelihoods. You just hope that you have enough failsafes in the system so if one part of the system fails, the others will take over, or shut the whole thing down properly.
- Q: a/ Calculate the lift workb/ What is the power used by the crane when the efficiency is 60%? (Can you explain for me what efficiency means)c/ What will the kinetic energy of the load be when it hits the ground, if it falls from the height 8.5 meters, g=9.81 m/s^2Thank you.
- evaluate the equation P = W/t the place W = F x d (F = tension (load) d = distance moved interior the path of tension, W = artwork carried out/ability transferred, P = ability, t = time) a million) if P = W/t then t = W/P yet W = F x d so t = F x d/P F = 6N d = 2m P = 3W t = 6 x 2/ 3 t = 4s 2) returned P = W/t = F x d/t so d = Pt/F d = 12W x 5s/ 6N d = 10m
- Q: I'm a little confused as to what the difference is between the crane and the flare boom-____- I'm thinking that the flare boom is what they use to burn off oil I there's a fire, but is that right? And what does the crane do?
- The flare boom is just that, a stationary boom that supports the flare line. It is not a crane, those are completely separate and usually on the side of the platform away from the flare boom. The flare has to be set out from the platform so the radiant heat from the flame doesn't harm the people on board or the equipment. Yes there is normally a standing pilot and there will be a flame if there is a need to burn off the natural gas during an upset or emergency.
Send your message to us
Tower Crane TCP5013A/TC5013 Topless Topkit
- Loading Port:
- China main port
- Payment Terms:
- TT or LC
- Min Order Qty:
- 1 unit
- Supply Capability:
- 30 unit/month
OKorder Service Pledge
OKorder Financial Service
Similar products
Hot products
Hot Searches
Related keywords