Tower Crane TCD4021 with Excellent Quality
- Loading Port:
- China main port
- Payment Terms:
- TT or LC
- Min Order Qty:
- 1 unit
- Supply Capability:
- 30 unit/month
OKorder Service Pledge
OKorder Financial Service
You Might Also Like
Structure of Tower Crane TCD4021 Description
Feature: Tower Crane
Condition: New
Application: Construction
Tip Load:8T
Span: 40m
Certification: CE,ISO
Place of Origin: China(Mainland)
Model Number: TCD4021
Packaging & Delivery of Tower Crane TCD4021
Packaging Detail: Nude package
Delivery Detail: 25-30days
Main Features Tower Crane TCD4021
Tower crane is a kind of vertical conveyor for construction, this series tower crane which with high lifting height, big working radius
mainly used for construction project, power station, port etc . It contain lifting system, luffing system, slewing system and running system. This kind of tower crane use standard section hydraulic lifting and connection, it can increase tower crane height by increase stand sections number, and load capacity will not influenced.
Tower Crane TCD4021 Specifiction
Images of Tower Crane
FAQ of Tower Crane
Q: What serice you could provide?
A: Providing timely delivery, standby engineers are ready to slove any of your problem
Providing all-embraced warranty of products quality, worksite installation guidance
Providing ample spare parts and training of operation and maintenance
Engineers have more than 20 years' experience in tower crane, ready to solve any of your problems.
Q: What about our tower crane's warranty?
A: Usually there is one-year quality warranty including main electronic parts (not including consumable parts). There are consumable spare parts together with whole machine and normally they are enough for one year.
Q: What is 3 main mechanism of the tower crane?
A: there are trolleying mechanism/ slewing mechanism/ hoisting mechanism.
Q: Can you equip with light on tower crane jib, monitor, remote control and anemometer?
A: Sure. All of these could be provided with extra cost upon the clients’ requirements. But according to general practice, remote control is not suggested because most of the operator feedback operation in the cabin will provide a wide working view.
- Q: could someone give me a good summary on the red badge of courage, and yes i did read the book and i have trouble understanding, and help would be good thanks!!
- I can't help you. I read that book a few years ago, and I hated it so hard.
- Q: what can lead tower crane to blank out?
- (1) tower crane has crack; (2)Brake block friction lining wear up to 50% ofRaw material thickness ; (3)Brake wheel surface wear reaches 5mm ~ 2mm (4)Spring has plastic deformation; (5)Lever system, air travelis more than about 10% of its rated trip
- Q: how does a crane operator's knowledge of where the centroid is generally located for most uniform objects help them perform their job more safely?
- If an object is uniform, it's a fair bet the centre of mass will be at the centre of the shape. If lifting with slings, he will have them placed equidistant from centre, at an angle to each other not exceeding 60 degrees. He will then lift a little, and can tell by the angles from vertical of each sling whether or not the CM is under the centre of the crane cable. If not, he will lower the load, and have someone adjust the sling positions. Having slings equally loaded ensures a level load when lifting, and when a load is level it is a much safer lift than when it tilts one way or the other. A tilt would mean greater force in the sling on the low end. The load could slip out, or the excess force could break the sling.
- Q: I was told that this was taking place, so i would like to fax the info to the proper local
- Is that a woof woof dog, or a dogman? A dogman is the person responsible for loading a crane. In days gone by, he often rode on the load while it was being hoisted. Maybe some still do?
- Q: 3years after I quit a job,I am once again looking toward the same field it's just that in my old job they helped me get a crane license when I left the job they kept my certification .How can i get that info without asking my old work for it,or would i have to take the course over?
- contact whatever agency issued the license in the future, remember to keep the original yourself and give the company a copy
- Q: inventor of junk yard electromagnetic crane?
- Who Invented The Electromagnet
- Q: does anyone have a good slogan for the whooping crane?
- **** the whooping crane
- Q: How do you test the tower crane? Myopia can span tower crane? Brother here, please all heroes.
- A tower crane installation scheme, 1, compilation basis, project overview, working environment, 2 workers and 3 endurance calculation and installation equipment for 4, installation procedures, methods and requirements for 5, commissioning record 6, two safety technical measures, safety technical disclosure, three installation foundation concrete test report of four, the tower crane installation and acceptance of table five, safety supervision station issued a permit for six, seven, demolition demolition project safety technical clarificaiton tower crane installation scheme project name: preparation: position (title): Approval: job (title): the construction unit: tower crane installation demolition project, the preparatory work before construction: 1. The tower crane installation position, according to the effective range of the construction requirements, site conditions and the role of tower crane, convenient installation and disassembly, the tower crane configuration in 17 axis to 18 Between the axis, away from the outer wall of 5 meters, with 11 standard section. 2, the basis of the principle, the use of concrete foundation, strictly according to random basis drawing. 3, the examination of concrete pressure report, tower foundation has been completed by design and construction, the safety group acceptance, the basic test block delivery, after the test pressure qualified, must be installed. 4. The installation site is level and the channel is repaired. 5, transport parts admission
- Q: We need to purchase spare parts. If there are any supplier in the ASEAN region as possible. We are in urgent need . We are from Viet NamThank you.Email : tuanhuynh62@yahoo,com
- they claim to have what you need. Good luck, I bet it's near impossable to get parts over there. You have a lot of work?
- Q: I have found crane fly larvae on my kitchen floor in the middle of the night. Were are they coming from? How do I get rid of them?
- probably not larva of crane fly...they live in the soil outside. Describe or post a pic what you have
Send your message to us
Tower Crane TCD4021 with Excellent Quality
- Loading Port:
- China main port
- Payment Terms:
- TT or LC
- Min Order Qty:
- 1 unit
- Supply Capability:
- 30 unit/month
OKorder Service Pledge
OKorder Financial Service
Similar products
Hot products
Hot Searches
Related keywords