• Tower Crane Lifting Machines with High Quality System 1
  • Tower Crane Lifting Machines with High Quality System 2
  • Tower Crane Lifting Machines with High Quality System 3
  • Tower Crane Lifting Machines with High Quality System 4
  • Tower Crane Lifting Machines with High Quality System 5
  • Tower Crane Lifting Machines with High Quality System 6
Tower Crane Lifting Machines with High Quality

Tower Crane Lifting Machines with High Quality

Ref Price:
get latest price
Loading Port:
China main port
Payment Terms:
TT OR LC
Min Order Qty:
1 unit
Supply Capability:
30 unit/month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

Detail of Tower Crane

Feature: Tower Crane                Condition: New                         Application:Building,Construction,Industrial

Rated Loading Capacity: 1-6T        Rated Lifting Moment:62KN.M            Max. Lifting Load: 6T

Max. Lifting Height: 141.5M         Span: 2.5-56M                          Place of Origin: China (Mainland)

Brand Name: CMAX                    Model Number: TC5610(QTZ62)            Certification: ISO,CE

Warranty: 1 Year                    Free standing height (M):41.5          Max. Working Range(M): 56

Tip Lifting Weight(T): 1            Working Range(M): 44,50,56             Climbing speed(M/MIN): 0.58

Counterweight(T): 141.1             Working Temperature(°C): -40-+60      Type: Topkit Tower Crane

Delivery Date:25-30 days            Mast Section Size(L*W*H)MM:1600*1600*2500(Intergrated type)             


Main Features of Tower Crane


1. TC5610(QTZ62) have competitive price and excellent quality, suitable for all kinds of construction project and can work under all kinds of work condition. With their working radius from 2.5 to 56m, TC5610(QTZ62)  tower cranes are famous for their large operating ranges, varied working methods and wide uses.  

 

2. This series of tower cranes has a horizontal jib frame, a jib-trolley radius-changing mechanism and a hydraulic self-raising mechanism.

 

3. It is original in design, reliable in operation and satisfactory in shape.

 

4. Equipped with all necessary safety devices, these cranes show a good speed-control capacity, satisfactory operating stability and high work efficiency.

 

6. Hoisting mechanism fitted with three speed motor, stable braking and less shock when shifting.

 

7. Slewing mechanism equipped with 4-speed motor, stable and reliable, can provide stepless speed regulation.


8. Trolleying mechanism can provide two operation speeds.


9. With scientific layout and beautiful appearance.

 

10.They are widely applied for the construction of high-rise hotels, resident buildings, high-rise industrial buildings, large-span factory buildings and tower like buildings like tall chimneys. 

 

11.After sales service will be offered which will get rid of all your worries in the purchase of our products


Specification of Tower Crane

 

Tower Crane Lifting Machines with High QualityTower Crane Lifting Machines with High QualityTower Crane Lifting Machines with High Quality

Images of Tower Crane 


Tower Crane Lifting Machines with High Quality

Tower Crane Lifting Machines with High Quality

Tower Crane Lifting Machines with High Quality

Tower Crane Lifting Machines with High Quality

Tower Crane Lifting Machines with High Quality


FAQ about Tower Crane

 

Q: What kinds of tower crane are available now? 

A: Four main categories: normal  tower crane  with cat head, internal climbing  tower crane , top less  tower crane  and luffing  tower crane.  

 

Q: What kind of steel used for  tower crane ?

A: Normally, as for the main force bearing steel structure, Q345B is adopted; as for the assistance force bearing steel structure Q235B is adopted. All of the raw material is outsourced from qualified steel factory in China.

 

Q: What about our  tower crane  warranty?

A: Usually there is one-year quality warranty including main electronic parts (not including consumable parts). There are consumable spare parts together with whole machine and normally they are enough for one year.

 

Q: What is 3 main mechanism of the  tower crane ?

A: there are trolleying mechanism/ slewing mechanism/ hoisting mechanism.

 

Q: Can you equip with light on  tower crane  jib, monitor, remote control and anemometer?

A: Sure. All of these could be provided with extra cost upon the clients' requirements. But according to general practice, remote control is not suggested because most of the operator feedback operation in the cabin will provide a wide working view.



Q:I know that you have to unfold the origami paper crane, but how do you find the surface area of it???????????????????????????/ please help...........
This is a possible way 1 Fold a crane from a white sheet 2 paint the crane black whit a pen 3 unfold 4 you will have now a white sheet with a series of black triangles 5 measure and find the surface area of each triangle 6 sum the areas and you will have the total surface area of the crane
Q:What is the calibration value of a tower crane?
Three, gravity moment MThe product of amplitude L and the corresponding lifting objects called Q gravity lifting moment, the unit is kN - M.Tower crane capacity is based on lifting moment representation. It uses the product of the maximum working range and the corresponding maximum lifting load as the calibration value of the lifting moment.Four 、 lifting height HIt refers to the vertical distance from the surface to the parking level of the crane sling allows the highest position. The unit is m.Five, work speed1. lifting speed (down) Vn - stable state of motion, the vertical displacement velocity of the rated load. The unit is m/min.2. crane (CART) running speed of Vk, stable state of motion, the running speed of the crane. The operating speed of a crane with rated load on the horizontal (or horizontal rail) surface, at the height of 10m away from the ground, and when the wind speed is less than 3m/s.
Q:For anyone who has read/studied Stephen Crane - do you know of any connecting theme within his most famous short stories (the open boat, the blue hotel, the bride comes to yellow sky, the monster)?I was think naturalism b/c it is so prevalent in the open boat but is really the only short story naturalism is in
sorry, i haven't read any Crane short stories, but i'm a HUGE fan of his poetry. it's some of the most bleak, raw, yet honest poetry i've ever read.
Q:What are the conditions of tower cranes, strictly prohibited?
A. Products obsolete by the stateB, over the specified service life, failed to assess the quality of the productC, products that do not conform to national or trade standardsD, products without complete security technical records
Q:3years after I quit a job,I am once again looking toward the same field it's just that in my old job they helped me get a crane license when I left the job they kept my certification .How can i get that info without asking my old work for it,or would i have to take the course over?
contact whatever agency issued the license in the future, remember to keep the original yourself and give the company a copy
Q:how a tower crane for a high rise building construction is erected?
Depends on the type - if the building is not that tall, the tower crane could be built by any taller crane (either a mobile one or an existing one on the site). If the building is very tall, a self-erecting crane is usually used; this type has a sort of jack mechanism somewhere in the tower (usually near the bottom), so as it is needed, the existing tower can be lifted, and another tower section is inserted to raise the entire structure, repeating the process as needed as the structure the crane is building gets taller (thus, the crane is building itself as it goes along).
Q:Please help!
this would help you i hope good luck researching
Q:Ok I got these huge mosquito things in my house and found out they are crane flies. I got up this morning and there are several hanging from my ceiling on a long single strand of silk or web. Is this unusual? Its really weird.
Most okorder
Q:Hi there!I was planning on making an electromagnetic crane, and I already understand how the electromagnet works. Its for the science fair in two weeks, but they asked us to make our projects soon.But I not sure hot to build the crane itself, any ideas?
Woodworking okorder
Q:a 10 crane is moving across a frictionless surface at 4 m/s. if you wish to bring the crate to a stop, how much work would it need to do to dissipate all the kinetic energy?Physic
If an object with mass 10kg is moving at x m/s it's Kinetic energy is ?mv? =?×10 kgm?/s? = 5x? Joules Example: 10kg @ 4m/s Ke = ? (10kg)× (4m/s)? = 80 Joules

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

Hot products


Hot Searches

Related keywords