• Tower Crane Lifting Machines with High Quality System 1
  • Tower Crane Lifting Machines with High Quality System 2
  • Tower Crane Lifting Machines with High Quality System 3
  • Tower Crane Lifting Machines with High Quality System 4
  • Tower Crane Lifting Machines with High Quality System 5
  • Tower Crane Lifting Machines with High Quality System 6
Tower Crane Lifting Machines with High Quality

Tower Crane Lifting Machines with High Quality

Ref Price:
get latest price
Loading Port:
China main port
Payment Terms:
TT OR LC
Min Order Qty:
1 unit
Supply Capability:
30 unit/month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

Detail of Tower Crane

Feature: Tower Crane                Condition: New                         Application:Building,Construction,Industrial

Rated Loading Capacity: 1-6T        Rated Lifting Moment:62KN.M            Max. Lifting Load: 6T

Max. Lifting Height: 141.5M         Span: 2.5-56M                          Place of Origin: China (Mainland)

Brand Name: CMAX                    Model Number: TC5610(QTZ62)            Certification: ISO,CE

Warranty: 1 Year                    Free standing height (M):41.5          Max. Working Range(M): 56

Tip Lifting Weight(T): 1            Working Range(M): 44,50,56             Climbing speed(M/MIN): 0.58

Counterweight(T): 141.1             Working Temperature(°C): -40-+60      Type: Topkit Tower Crane

Delivery Date:25-30 days            Mast Section Size(L*W*H)MM:1600*1600*2500(Intergrated type)             


Main Features of Tower Crane


1. TC5610(QTZ62) have competitive price and excellent quality, suitable for all kinds of construction project and can work under all kinds of work condition. With their working radius from 2.5 to 56m, TC5610(QTZ62)  tower cranes are famous for their large operating ranges, varied working methods and wide uses.  

 

2. This series of tower cranes has a horizontal jib frame, a jib-trolley radius-changing mechanism and a hydraulic self-raising mechanism.

 

3. It is original in design, reliable in operation and satisfactory in shape.

 

4. Equipped with all necessary safety devices, these cranes show a good speed-control capacity, satisfactory operating stability and high work efficiency.

 

6. Hoisting mechanism fitted with three speed motor, stable braking and less shock when shifting.

 

7. Slewing mechanism equipped with 4-speed motor, stable and reliable, can provide stepless speed regulation.


8. Trolleying mechanism can provide two operation speeds.


9. With scientific layout and beautiful appearance.

 

10.They are widely applied for the construction of high-rise hotels, resident buildings, high-rise industrial buildings, large-span factory buildings and tower like buildings like tall chimneys. 

 

11.After sales service will be offered which will get rid of all your worries in the purchase of our products


Specification of Tower Crane

 

Tower Crane Lifting Machines with High QualityTower Crane Lifting Machines with High QualityTower Crane Lifting Machines with High Quality

Images of Tower Crane 


Tower Crane Lifting Machines with High Quality

Tower Crane Lifting Machines with High Quality

Tower Crane Lifting Machines with High Quality

Tower Crane Lifting Machines with High Quality

Tower Crane Lifting Machines with High Quality


FAQ about Tower Crane

 

Q: What kinds of tower crane are available now? 

A: Four main categories: normal  tower crane  with cat head, internal climbing  tower crane , top less  tower crane  and luffing  tower crane.  

 

Q: What kind of steel used for  tower crane ?

A: Normally, as for the main force bearing steel structure, Q345B is adopted; as for the assistance force bearing steel structure Q235B is adopted. All of the raw material is outsourced from qualified steel factory in China.

 

Q: What about our  tower crane  warranty?

A: Usually there is one-year quality warranty including main electronic parts (not including consumable parts). There are consumable spare parts together with whole machine and normally they are enough for one year.

 

Q: What is 3 main mechanism of the  tower crane ?

A: there are trolleying mechanism/ slewing mechanism/ hoisting mechanism.

 

Q: Can you equip with light on  tower crane  jib, monitor, remote control and anemometer?

A: Sure. All of these could be provided with extra cost upon the clients' requirements. But according to general practice, remote control is not suggested because most of the operator feedback operation in the cabin will provide a wide working view.



Q: What is the scope of the installation and disassembly of self lifting tower cranes and the applicable range of the cost and the off-site transportation cost?
The installation and disassembly of the existing self rated tower crane, the first cost and the off-site transportation cost quota are divided by the lifting moment 1000kNm and 2000kNm of the jack up tower crane.
Q: ok so i have to us my phone so just give me instructions no links no youtube videos cause my phone cant support them and my phone may not be able to load some of the links
You are asking for a lot but I have seen you request this a number of times, so I will do it...a sucker born. 1. Valley fold the paper in half so it makes a triangle. With the long side held away from you, valley fold the triangle in half again. 2. Lift the top triangle and valley fold it so that its top point meets its bottom point. Unfold the crease you have just made. Put your fingers inside the top triangle, open it up, and flatten it so it forms a square. Turn the paper over and fold and flatten the remaining triangle in the same way. 3. Make sure that the open ends of the paper are pointing down. Valley fold the top layer of both sides in to meet the centre crease. You will now have a kite shape. 4. Valley fold the top point of the kite down and crease well. Unfold the crease you have just made. 5. Open the sides of the kite by unfolding the flaps you made in Step 3. Lift the top layer of the kite's bottom point up so the paper bends at the crease you made in Step 4. Push the outside edges of the paper in to meet the centre line. Then flatten the figure so that you have a long diamond shape. 6. Turn the figure over and fold a kite shape on the remaining side as in Step 3. Repeat Steps 4 and 5 on this side. You will now have a two-sided long diamond. The bottom half of the diamond is split in two. 7. Valley fold the top layer of both bottom edges in to meet in the middle. Turn the figure over and repeat on the other side. 8. To make the crane's neck and tail, valley fold each half of the bottom section out to the sides. Crease well. 9. Unfold the right crease you just made and make an inside reverse fold. Repeat this step on the left side. 10.To form the head, fold down the end of the neck. Unfold this crease and inside reverse fold the head. 11.Hold one of the crane's wings in each hand. Blow hard into the opening on the underside of the figure and gently separate your hands. You crane will puff up and be ready to hang.
Q: How do you erect a crane. surely you would need a crane to make a crane.?
Yes you need a crane to erect a crane. A large mobile crane is required to erect a tower crane but the mobile crane is much more expensive so it saves money by only being on site for a few days to erect/dismantle the tower crane.
Q: Do the characters develop a sense of brotherhood. If so will it be temporary or permanent
They absolutely do - as anyone who has ever tried to row a boat with another person can understand. The key here is the correspondent who is described as someone who has developed a distrust for people. He has seen a lot of things and as a reporter, he has kind of trained himself to view them impartially and not become involved. Crane discusses that when he talks about the correspondent seeing the dead soldier in Algiers. However, now his basic survival depends on him becoming involved with people. He has to take orders from the captain. He has to take turns rowing with the oilman. Eventually when the boat becomes too heavy, they take turns holding on from the water. It's basic survival now and the only way it works is by them developing a brotherhood and working as a team. I dont think it will be permenent - the correspondent will go his own way - back to reporting. However I think that he will take with him a new view of people - an empathy which will make him a better correspondent. Pax - C.
Q: open boat by stephen crane
The Open Boat is a true story - Crane was sent to Cuba as a war correspondent in 1897, and he boarded a vessel named the Commodore. The vessel sank off New Smyrna Beach, Florida in heavy weather, and the survivors made their way to shore in the open boat described. The wreck of the Commodore is in 90 feet of water, fourteen miles out and is currently under an Admiralty salvage claim.
Q: So Pretty much, there is a crane, and there are four blue minions on top. I can pick them up, and carry them back and forth, but I can't get them down. If I drop them in the middle they always die. Can somebody give me a way to beat this?
Overlord 2 Minions
Q: How to calculate life span of steel structure? for example, crane?
this type of calculation is a fatigue life calculation, performed (for example) on aircraft. You will have to know the material, the load spectra and the stresses for this load spectra. It is not an easy, nor exact calculation. Try reading some fatigue topics on the reports suggested on the source site.
Q: If so, would you mind finding me a site that will teach me how to either with a good video or an easy-to-follow explanation because i tried many sites and i just cannot understand clearly enough. I get so far and then i can't tell what is happening in a step, and i can't do it.If you wouldn't mind to find me a site that you know will help, since you can make them, it would be greatly appreciated.Thanks.
Video okorder /
Q: I'm folding 1000 origami cranes for my upcoming wedding. It's a tradition. I'm trying to find a website that can show me how to make the cranes into a large picture or an idea for a mobile. I found some sites that show pictures of each, but nothing with a how to on it.
from most of the pictures i saw, it seems pretty simple to figure out thinking of it logically. Origami cranes, string, wood sticks, Love and care. And with a bit of your own creativity and whatever supplies you can gather I think you will do a great thing. (making a paper crane now :)
Q: Before the Advent of the Railroad Steam Recovery Crane Car (pictures below), how were Locomotive Steam Engines recovered after a derailment from the 1830's to the 1890's?
Block and tackle. Some disassembling required. Consider this Stonewall Jackson raided Grafton WV and took several locomotives over land to a southern rail head. The special equipment was developed due to increased engine size. When steam cranes were/are used temporary tracks are laid at the wreck site for several reasons. one of which is to get equipment in and the other is to haul the wreckage out. The actual number of cranes required depended on the engine/s in the wreck, location on the wreck, skill of the operators and extent of damage. If the locomotive was damaged to much, it might be cut up. If the location was too difficult for recover, they were abandoned or buried. Rumor has it that there are several locomotives left at the bottom of slides awaiting for some one with enough money to recover them for restoration. Like the story of legend concerning a 1953 Corvette in a old barn. Hope that answers all your questions.

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

Hot products


Hot Searches

Related keywords