Tower Crane New TC7050 Building Equipment
- Loading Port:
- China main port
- Payment Terms:
- TT or LC
- Min Order Qty:
- 1 unit
- Supply Capability:
- 30 unit/month
OKorder Service Pledge
OKorder Financial Service
You Might Also Like
Structure of Tower Crane TC7050 Description
Feature: Tower Crane
Condition: New
Application: Construction
Certification: CE,ISO
Place of Origin: China(Mainland)
Model Number: TC7050
Packaging & Delivery of Tower Crane TC7050
Packaging Detail: Nude package
Delivery Detail: 25-30days
Main Feature of Tower Crane TC7050
Our tower crane is self-erecting and wall-attached tower crane, in addition to it's advanced parameters, reliable performance, well-looking appearance, and excellent quality.
It has characteristica such as long boom, largeworking coverage, hydraulic rising, and tandem mounted tower body.
It's design idea shows advantages including simple structure and good applicability, convenient maintainability, and lower price at the same time to emphasize meeting the requirement from construction units at different levels.
It's lifting height is obviously increased thanks to its self-erecting and wall attached function.
It is applicable for construction of different industrial, commercial, office, and civil building lower than 220m, and becomes an ideal service-building machine at home.
Tower Crane TC7050 Specifiction
Free standing height (m) | 50 | ||||
Max height with attachment (m) | 200 | ||||
Working range can be adjusted(m) | 50、55、60、65、70 | ||||
Min working range(m) | 2.5 | ||||
Max lifting capacity(t) | 20 | ||||
Tip load @ 70m(t) | 5 | ||||
Hoist mechanism (VFD+PLC) | Falls | 2 | 4 | ||
Lifting capacity(t) | 0-5 | 0-10 | 0-10 | 0-20 | |
Speed(m/min) | 0-80 | 0-40 | 0-40 | 0-20 | |
Motor | YZPBF280S-4-75KW | ||||
Trolleying mechanism (VFD+PLC) | Speed(m/min) | 0-60 | |||
Motor | YPBE132M-4-11KW | ||||
Slewing mechanism (VFD+PLC) | Speed(r/min) | 0-0.6 | |||
Motor | YTRVF 132M2-4-9KW×3 | ||||
Climbing speed(m/min) | 0.45 | ||||
Counterweight(t) | 25 | ||||
Mast section size(L×W×H)m | 2.45×2.45×5 | ||||
Working temperature | -40-+60℃ | ||||
Total power (KW) | 115 | ||||
Power supply requirement (KVA) | 370KVA for generator | ||||
Cable type ( within 35 meters from site power source to lower electric box of tower crane ) |
| ||||
Startup voltage & current | 380V×95%=361V 408A | ||||
Rated working voltage & current | 380V 273A |
Images of Tower Crane
FAQ of Tower Crane
Q: What is the principal to quote the right tower crane to the client?
A: First, we need to know clients’ requirements. Normally the following information should be clarified by the client: max lifting capacity, height (height under hook), tip load and jib length.
Second, we need to know what the foundation requirement from the client is. (Fixed/undercarriage/ undercarriage with traveling system), mast section type (panel/integrated), power supply source (voltage, ampere and frequency), the distance between the machine and power supply……
Third if there are special needs, we could suggest proposal according to clear data provided by the clients. End-user, as construction machinery buyer, knows the site situation well and should make decision, such as the machinery specification, type…….
Q: What about our tower crane's warranty?
A: Usually there is one-year quality warranty including main electronic parts (not including consumable parts). There are consumable spare parts together with whole machine and normally they are enough for one year.
Q: What serice you could provide?
A: Providing timely delivery, standby engineers are ready to slove any of your problem
Providing all-embraced warranty of products quality, worksite installation guidance
Providing ample spare parts and training of operation and maintenance
Engineers have more than 20 years' experience in tower crane, ready to solve any of your problems.
- Q: the way u find them climbing with the building makes me wonder how they become this long and what is the mechanism for that
- The crane isn't growing. The cranes lift themselves up to the current top floor, build up around them, and repeat as necessary until they reach the top. The tallest cranes in the world are nowhere near as tall as the tallest skyscrapers - so the only mechanism to build very tall structures is to keep the cranes at the top of the building as it rises.
- Q: What is a TQ80 tower crane?
- The concrete transport vehicle can be used at the lower part of the tower of the large tower crane. The one we usually see at the construction site is.) TQ80 is a model of cranes.
- Q: If so, would you mind finding me a site that will teach me how to either with a good video or an easy-to-follow explanation because i tried many sites and i just cannot understand clearly enough. I get so far and then i can't tell what is happening in a step, and i can't do it.If you wouldn't mind to find me a site that you know will help, since you can make them, it would be greatly appreciated.Thanks.
- Go to Howcast and type in origami.It taught me how to fold like a pro.
- Q: my overhead crane refuse to work transvesely
- Limit switch replacement requires adjustment of the cranes travel limits. The limits are imposed by the manufacturer for the application. This service is normally factory authorized only.
- Q: what is the proper way to fold a paper crane?
- I would go to a library or a book store and find a book on origami.
- Q: how do cranes get assembled ? on building sites?
- By people.
- Q: How do you calculate ground bearing pressure for cranes?
- Crane Ground Bearing Pressure Calculator
- Q: I know that the whooping crane population recovered through captive breeding but how many are left currently (right now).
- There were 535 total in 2009--the population increased slightly last year but I have not seen a total for the population of 2010. Deaths can occur at any time so the number changes constantly. The Journey North site counts 281 adults in the wild western population and 106 birds in the reintroduced eastern flock. They did not give a number for the birds in captivity so I cannot give you a total. You can follow the reintroduced whooping crane population and their migration each spring and fall on the Journey North (in fall called Journey South site). They also track song birds and hummingbirds and monach butterflies.
- Q: I need to do a report about Stephen Crane, answering the question how did his life affect his how he wrote his books, does anyone know?
- Crane is noted for his early employment of naturalism, a literary style in which characters face realistically portrayed and often bleak circumstances, but Crane emphasized impressionistic imagery and biblical symbolism rather than graphic realism. Crane's realism, writes William Peden, is often more impressionistic than photographic; his interest in psychological probing, his innovations in technique and style, and his use of imagery, paradox and symbolism give much of his best work a romantic rather than a naturalistic quality. Both realism and symbolism, the two major directions of modern fiction, have their American beginnings in Crane's work.
- Q: Emergency treatment of interrupted electricity during lifting of tower crane
- It is very dangerous to stop the electricity during the lifting of tower crane. Because the slewing brake is missing, the tower crane is very dangerous because the wind rotates.
Send your message to us
Tower Crane New TC7050 Building Equipment
- Loading Port:
- China main port
- Payment Terms:
- TT or LC
- Min Order Qty:
- 1 unit
- Supply Capability:
- 30 unit/month
OKorder Service Pledge
OKorder Financial Service
Similar products
Hot products
Hot Searches
Related keywords