• Tower Crane 8 Ton Max Capacity TC5516 New Condition System 1
  • Tower Crane 8 Ton Max Capacity TC5516 New Condition System 2
  • Tower Crane 8 Ton Max Capacity TC5516 New Condition System 3
  • Tower Crane 8 Ton Max Capacity TC5516 New Condition System 4
  • Tower Crane 8 Ton Max Capacity TC5516 New Condition System 5
  • Tower Crane 8 Ton Max Capacity TC5516 New Condition System 6
Tower Crane 8 Ton Max Capacity TC5516 New Condition

Tower Crane 8 Ton Max Capacity TC5516 New Condition

Ref Price:
$30,000.00 - 80,000.00 / unit get latest price
Loading Port:
China main port
Payment Terms:
TT or LC
Min Order Qty:
1 unit
Supply Capability:
30 unit/month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

Item specifice

Maximum Lifting Weight:
8T
Maximum Lifting Height(M):
200M
Rated Loading Capacity:
1.6T
Span:
55M
Rated Load Moment:
100T.M

Detail of Tower Crane

 

Feature:Tower Crane 

Condition:New         

Model Number:TC5516(QTZ100) 

Place of Origin: China (Mainland)       

Brand Name: CMAX     

Certification: ISO,CE 

Warranty: 1 Year       

Application:Building,Construction,Industrial 

 

Main Features of Tower Crane

 

1) This series of tower cranes, ranging from QTZ40 to QTZ400 has a horizontal jib frame, a jib-trolley radius-changing mechanism and a hydraulic self-raising mechanism. It is original in design, reliable in operation and satisfactory in shape. Equipped with all necessary safety devices, these cranes show a good speed-control capacity, satisfactory operating stability and high work efficiency. They can be widely used for the construction of high-rise hotels, residential buildings, high-rise industrial buildings, large-span factory buildings and tower-like buildings like tall chimneys.

 

2) It has high working speed, good speed-adjusting performance, steady operation and high efficiency. Three-speed motor and mono-speed ratio decelerator are applied in the lifting struction, which enables heavy load low speed and light load high speed.


3)The range-change structure drives the trolley moving on the horizontal crang jib, with good positioning performance. Planet gear decelerator is applied in the circumgyrating structure, together with moment-limiting hydraulic coupler, which can relize high load capacity, steady starting and reliable operation.

 

4) The crane has complete set of safety devices, which can guarantee the safe and high efficienct operation. The crane is equipped with lifting height limiter, trolley ranging limiter, moment limiter, weight limiter etc..

 

5)The cranehas scientific layout and handsome appearance. The drivers cab is set independently on one side, with good vision field. It creates a good working environment for the operator.

 

Specification of Tower Crane 

 

Tower Crane 8 Ton Max Capacity TC5516 New Condition

Tower Crane 8 Ton Max Capacity TC5516 New Condition

Tower Crane 8 Ton Max Capacity TC5516 New Condition

 

 Images of Tower Crane

Tower Crane 4808 40T.M New Mini Crane in China 

Tower Crane Main Section TC5613 in China

Tower Crane 4808 40T.M New Mini Crane in China

Tower Crane Max. lifting Weight 10T  in China



Tower Crane Max. lifting Weight 10T  in China

 

FAQ about Tower Crane

 

Q: What serice you could provide?

A: Providing timely delivery, standby engineers are ready to slove any of your problem

    Providing all-embraced warranty of products quality, worksite installation guidance

    Providing ample spare parts and training of operation and maintenance

    Engineers have more than 20 years' experience in tower crane, ready to solve any of your  problems.

 

Q: What kind of steel used for  tower crane ?

A: Normally, as for the main force bearing steel structure, Q345B is adopted; as for the assistance force bearing steel structure Q235B is adopted. All of the raw material is outsourced from qualified steel factory in China.

 

Q: What about our  tower crane  warranty?

A: Usually there is one-year quality warranty including main electronic parts (not including consumable parts). There are consumable spare parts together with whole machine and normally they are enough for one year.

 

Q: What is 3 main mechanism of the  tower crane ?

A: there are trolleying mechanism/ slewing mechanism/ hoisting mechanism.

 

Q: Can you equip with light on  tower crane  jib, monitor, remote control and anemometer?

A: Sure. All of these could be provided with extra cost upon the clients' requirements. But according to general practice, remote control is not suggested because most of the operator feedback operation in the cabin will provide a wide working view.


(0)

 

Q:my father is owning a crane manufacturing business I hav given my ssc wat should I study after ssc IT, mechanical engg., design engg. and others (plz. specify) ?
Without being too critical, the first thing you need to do is improve your English so that you will be a huge help in the company whether in engineering or sales. Cranes require lots of engineering in weight handling (mechanical), automation and controls including instrumentation (electrical) and a tertiary field in engineering is in stopping and starting (clutches and brakes) which can be mechanical or hydraulic engineering. A new filed is metalurgy which is concerned with the way metals perform (stress), lighter,stronger, etc. Take your choice. Mpho
Q:What is the difference between crawler crane and tower crane?
There are many differencesThe crawler is used to transport items in a smaller range of motion (site)A tower, used for construction, stationary, or maneuvering along a railroad track.Crawler can easily reach the magnitude of 50 tons or moreMore than ten tons of tower are relatively commonTrack internal combustion engine, hydraulicTower type general power consumptionWait, wait......
Q:Has anyone actually folded 1000 paper cranes? i want some proof
no. But I have read the book sadako and the thousand paper cranes. I was so sad when I read that. I have always wanted to fold A paper crane.
Q:Jon and Paul are folding origami cranes. If Paul works alone he can fold 100 cranes in 5hours. together they can do the same job in 3 hours. how much time would it take for Jon to fold 100 cranes alone? Please show your work. :)
1/5 + 1/x = 1/3 == x = 15/2 = 7.5 h answer : 7.5 hours ++++++++++++++++++++
Q:I see crane flies everywhere but I've never seen them eat anything.
Adult crane flies do not eat at all; most adult crane flies only mate and then die. Crane fly larvae are called leatherjackets or 'leatherjacket slugs' because of the way they move and eat roots (such as those of grass in lawns) and other vegetation.
Q:Will Denny Crane lose his first case on an upcoming episode of Boston Legal?
Denny Crane lose a case? Are you crazy? Denny Crane might lose a few more memory brain cells, but never a case. Then he wouldn't be Denny Crane. Denny Crane!
Q:Is the working load of a crane the maximum weight it is able to lift?
Good long answer already given. Adding only that working load is for normal usage. A crane with an angled boom may be able to lift a higher load with a shorter boom (less with very long) or if the boom is kept at a higher angle so load is closer to base. This will be given in the detailed specs.
Q:Also, could anyone give me a site with a detailed behind the scenes look on different types of freight ships? I hold a strong interest in the shipping sector and being unsure on little details like these annoy me. Thanks!
? ? ? Onboard Cranes from the cabs on each Crane , where'd you think from ?
Q:Notice of tower crane
Please refer to the technical regulations for the safety of installation, disassembly and use of tower cranes in construction;The following is copy:3 installation of tower cranes3.1 conditions for installation of tower cranes3.1.1 tower crane installation unit must have the construction administrative departments issued the contracted professional qualification and heavy equipment installation engineering construction enterprises safety production license. Tower crane installation units must be engaged in the installation of tower cranes within the scope of qualification permit.In addition to the professional and technical personnel who have the qualification standard, the installation units of 3.1.2 tower cranes shall also have professional personnel who are in line with the project. The person in charge of the project, the project manager and the full-time safety management personnel shall have the certificate of safety production inspection. Tower cranes, installers, electricians, drivers, signal engineers, cable operators should have special construction operation qualification certificates.3.1.3 construction units shall sign professional contract for installation engineering with the installation units, and make clear the responsibility of both sides for safety in production. In case of general contracting of construction, it shall be signed by the general contractor and the installation unit.
Q:How are those really tall construction cranes assembled ???
its a truss... they take each piece and attach it... its no hard

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

New products

Hot products


Hot Searches

Related keywords