Tower Crane 8T Max Capacity TC6014 Factory

Tower Crane 8T Max Capacity TC6014 Factory

Ref Price:
$20,000.00 - 80,000.00 / unit get latest price
Loading Port:
China main port
Payment Terms:
TT or LC
Min Order Qty:
1 unit
Supply Capability:
30 unit/month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

Detail of Tower Crane

 

Feature:Tower Crane 

Condition:New         

Model Number:TC5613(QTZ80) 

Place of Origin: China (Mainland)       

Brand Name: CMAX     

Certification: ISO,CE 

Warranty: 1 Year       

Application:Building,Construction,Industrial 

 

Main Features of Tower Crane

 

Our tower crane is self-erecting and wall-attached tower crane, in addition to it's advanced parameters, reliable performance, well-looking appearance, and excellent quality.

 

It has characteristica such as long boom, largeworking coverage, hydraulic rising, and tandem mounted tower body.

 

It's design idea shows advantages including simple structure and good applicability, convenient maintainability, and lower price at the same time to emphasize meeting the requirement from construction units at different levels.

 

It's lifting height is obviously increased thanks to its self-erecting and wall attached function.

 

Specification of Tower Crane

 

Technical Sheet for TC6014

 

Independent height (m)

46

Max height with attachment (m)

138200

Working range can be adjustedm

485460

Min working rangem

2.5

Max lifting capacityt

8

Tip load @ 60mt

1.4

 

Hoist mechanism

Falls

2

4

Lifting capacityt

02

04

04

08

Speedm/min

080

040

040

020

Motor

YZRWFC250M-4/8     30/30KW

Trolleying mechanism

Speedm/min

53/27/12

Motor

YZTDE132L-4 /8/16   3.3/2.2/1.1KW

Slewing mechanism

Speedr/min

0-0.6

Motor

YZR132M2-6-3.7KW×2

Climbing speedm/min

0.5

Counterweightt

17.0

Mast section sizeL×W×Hm

1.6×1.6×3.0

Working temperature

-40+60

Total Power (KW)

42

Power supply requirement (KVA)

190KVA for generator

Cable type ( within 35 meters from site power source to lower

 electric box of tower crane )

50mm23+2, 5 cores

Startup voltage & current

380V×95%=361V      179A

Rated working voltage & current

380V                 128A

Loading diagram

60m jib length

R (m)

2.5-22.4

30

40

50

60

a=2 (kg)

4000

3646

2630

2014

1400

R (m)

2.5-11.245

20

a=4 (kg)

8000

5564

3573

2560

1944

1330

Images of Tower Crane

 

Tower Crane Max. lifting Weight 10T  in China

Tower Crane 8T Max Capacity TC6014 Factory

Tower Crane 8T Max Capacity TC6014 Factory

Tower Crane Max. lifting Weight 10T  in China

 

FAQ about Tower Crane

Q: What kind of steel used for  tower crane ?

A: Normally, as for the main force bearing steel structure, Q345B is adopted; as for the assistance force bearing steel structure Q235B is adopted. All of the raw material is outsourced from qualified steel factory in China.

 

Q: What about our  tower crane  warranty?

A: Usually there is one-year quality warranty including main electronic parts (not including consumable parts). There are consumable spare parts together with whole machine and normally they are enough for one year.

 

Q: What is 3 main mechanism of the  tower crane ?

A: there are trolleying mechanism/ slewing mechanism/ hoisting mechanism.

Q: What is the scope of the installation and disassembly of self lifting tower cranes and the applicable range of the cost and the off-site transportation cost?
The installation and disassembly of the existing self rated tower crane, the first cost and the off-site transportation cost quota are divided by the lifting moment 1000kNm and 2000kNm of the jack up tower crane.
Q: Who thinks William Shatner is adorable as Denny in Boston Legal? I do!! I just want to pinch his cheeks. He looks so lovable (in a chubby old guy kind of way. Lol.)AhahaAnd Shirley. She's so funny.Lincoln, suck. my. lobe. lol!Anywho...answer my denny question!!
It's just you, you poor thing.
Q: crane wreak during stadium construction
Big Blue: January 20, 2000: Video of the Big Blue crane accident that happened in the Brewer's Ball Park Stadium on July 14, 1999 in Milwaukee, Wisconsin. Three men lost their lives in the accident. Although the video is only 1 minute and 10 seconds in length, seeing it is an experience you won't soon forget.
Q: feminists always point to sexism. but Ive found 3 women here - who say they have experienced no sexism, and were pleasantly surprised by how excepting their largely male co-workers have been -
I dunno. I tried to get a blue collar job and asked my friend for a reference and he said, You know they won't hire you. Why, because I'm a lady? Yeah. Whatever, I didn't want your stupid job anyway. He's underworked and underpaid anyway, so women aren't exactly lining up to steal his job, anyway.
Q: Has anyone made 1000 origami cranes and made a wish? Just wondering
Yes. Also, after the atomic bombs were dropped on Japan, a girl with radiation poisoning tried it, but died after making six hundred and odd cranes. Make of that what you will.
Q: Who is it? And when in the book do they say who it is?Thank you so much! :D
was the head games maker in the first book or the 74th annual, now it's plutarch
Q: What is the insulation resistance of tower crane?
Three. Technical specification for temporary power safety on construction site JGJ 46-20055.4.2 within the construction site crane, derrick and Longmen machinery equipment, metal structure and steel scaffolding and under construction in construction projects, when lightning protection devices in adjacent buildings, structures and other facilities outside the protect zone of lightning arrester, lightning protection device should be installed in accordance with the provisions of.5.4.7 lightning protection electrical equipment machinery, connected to the PE line must repeat grounding at the same time, with a repeat of the mechanical and electrical equipment grounding and lightning protection grounding machines can share the same grounding body, but should be consistent with the repeated grounding resistance of grounding resistance requirements.The electrical equipment of 9.2.1 tower crane shall comply with the requirements of the current national standard "safety regulations for tower cranes" GB5144.9.2.2 tower cranes shall be subjected to repeated earthing and lightning protection grounding as specified in Clause 5.4.7 of this code. The earthing device of the track type tower crane shall comply with the following requirements:L the two ends of the rail are respectively provided with a grounding device;The joint of the 2 track is electrically connected, and the ends of the two tracks are electrically connected in the loop;3 long track every is not more than 30m and a grounding device.
Q: How much should the verticality of a tower crane be controlled? Thank you
No, the wind speed is not more than 3m/s, the independent state tower (or attached state highest attachment point above the tower axis) lateral verticality tolerance is 4/1000, the highest tower axis perpendicularity allowed attachment line below the point of difference is 2/1000.
Q: What are the safety devices for tower cranes?
Safety device for tower crane(1) lifting moment limiter, tower crane in lifting objects, the lifting radius and weight of the crane product is a constant number. According to this principle, a lifting torque limiter has been developed, the main function is to prevent overloading of the safety devices. The moment limiter only acts as a protection against the overload torque in the vertical vertical plane of the tower crane arm, and can not protect the tilting accidents caused by oblique hanging, wind load, rail inclination or collapse, etc..(2) weight limiter weight limiter's role is to protect the goods lifting weight does not exceed the maximum allowable weight of tower crane, tower crane is used to prevent the load exceeds the maximum rated load, avoid mechanical damage accident.
Q: Which one is a better investment? I can get both for 200dollars
The engine support is mainly for dropping the tranny, used before the car is up on a lift. The crane is for lifting the engine while the four wheels are on the ground. Most timing belts can be done without lifting the engine. Lifting the engine involves a very long list of procedures before actually yanking it up even a few inches. You have to disconnect and support the transmission, drain coolant and fluids and disconnect the hoses and wires, remove the engine mount bolts, maybe pull the radiator out, disconnect the A/C system lines, and remove the tranny and oil cooler lines, the coolng fans, shroud, hood, and so on. Good luck!

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

Hot products


Hot Searches

Related keywords