Tower Crane 8 Ton Max Capacity TC5613 Used Condition
- Loading Port:
- China main port
- Payment Terms:
- TT or LC
- Min Order Qty:
- 1 unit
- Supply Capability:
- 30 unit/month
OKorder Service Pledge
OKorder Financial Service
You Might Also Like
Specification
Detail of Tower Crane
Feature:Tower Crane Condition:New Model Number:TC5613(QTZ80) Place of Origin: China (Mainland) Brand Name: CMAX Certification: ISO,CE Warranty: 1 Year Application:Building,Construction,Industrial
Main Features of Tower Crane
1) This series of tower cranes, ranging from QTZ40 to QTZ400 has a horizontal jib frame, a jib-trolley radius-changing mechanism and a hydraulic self-raising mechanism. It is original in design, reliable in operation and satisfactory in shape. Equipped with all necessary safety devices, these cranes show a good speed-control capacity, satisfactory operating stability and high work efficiency. They can be widely used for the construction of high-rise hotels, residential buildings, high-rise industrial buildings, large-span factory buildings and tower-like buildings like tall chimneys.
2) It has high working speed, good speed-adjusting performance, steady operation and high efficiency. Three-speed motor and mono-speed ratio decelerator are applied in the lifting struction, which enables heavy load low speed and light load high speed. 3)The range-change structure drives the trolley moving on the horizontal crang jib, with good positioning performance. Planet gear decelerator is applied in the circumgyrating structure, together with moment-limiting hydraulic coupler, which can relize high load capacity, steady starting and reliable operation.
4) The crane has complete set of safety devices, which can guarantee the safe and high efficienct operation. The crane is equipped with lifting height limiter, trolley ranging limiter, moment limiter, weight limiter etc..
5)The cranehas scientific layout and handsome appearance. The drivers cab is set independently on one side, with good vision field. It creates a good working environment for the operator.
Specification of Tower Crane
Images of Tower Crane
FAQ about Tower Crane
Q: What serice you could provide? A: Providing timely delivery, standby engineers are ready to slove any of your problem Providing all-embraced warranty of products quality, worksite installation guidance Providing ample spare parts and training of operation and maintenance Engineers have more than 20 years' experience in tower crane, ready to solve any of your problems.
Q: What kind of steel used for tower crane ? A: Normally, as for the main force bearing steel structure, Q345B is adopted; as for the assistance force bearing steel structure Q235B is adopted. All of the raw material is outsourced from qualified steel factory in China.
Q: What about our tower crane warranty? A: Usually there is one-year quality warranty including main electronic parts (not including consumable parts). There are consumable spare parts together with whole machine and normally they are enough for one year.
Q: What is 3 main mechanism of the tower crane ? A: there are trolleying mechanism/ slewing mechanism/ hoisting mechanism.
Q: Can you equip with light on tower crane jib, monitor, remote control and anemometer? A: Sure. All of these could be provided with extra cost upon the clients' requirements. But according to general practice, remote control is not suggested because most of the operator feedback operation in the cabin will provide a wide working view. | |||||
(0) |
- Q: I am going to make 1000 paper cranes like Sadako Sasaki did. I am doing it to remember the victims of hiroshima and nagasaki and all the others who died as a result of wwii. especially sadako sasaki who, though she died in 1955, she was poisoned by the toxic gases in hiroshima. what do you think of my project, and got any tips to help?
- Aw, it somewhat is particularly stunning! And the attempt will raise your spirits, i'm particular. From what i can discover, they are oftentimes strung at the same time, 25 strings of 40 cranes each and each. Then the 25 strings are tied at the same time and the mass would be hung up. putting them interior the water is a foul concept for the water. that is an incredible form of soggy, colored paper polluting the water, so i wouldn't try this. purely a tenet, i could string them as is classic, and while your mom has enjoyed them a jointly as, donate them to an area charity like a infant's wellness facility. wish your mom has extra stable days than undesirable, and that if she would be able to be cured, she's cured quickly! Oh, no, they do no longer take in an incredible form of room. bypass examine the wiki article on 1000 cranes and you will see %.. They carry at once down, and take in little or no room.
- Q: A few years ago, my college decided to take down two multilevel dormitories. The demolition company decided to take it down piecemeal with a wrecking ball. The wrecking ball was attached to the crane via a very large tire (just the rubber part, not the inflatable part). I have seen this done on normal cranes and other wrecking balls on TV and was wondering if any professional construction people out there know why they would do this as to me, a guy not in the construction/demolition business, think that might be a bit unsafe.
- Shock absorption. The ball swings toward the building and hits, the energy of that swing is mostly dissipated into the building but also into the cable and cable connectors as the ball bounces back. That shock of the impact resonates and gets dissipated by the tire. It reduces wear and tear on the cable and cable connectors, also on the crane tower. Your car engine has motor mounts of the rubber type of material and it absorbs the resonating vibration of the engine. I have seen the cable connectors, interesting to say the least. The strands are interlaced sometime, and other times I see them clamped together. It would seem important to protect those joints. I do not know all of the crane business terminology, but that would be the gist of it.
- Q: Calculate the work the crane performs.
- Crane work = weight to be lifted x 6.95 m Weight to be lifted = 2.75x10^3 N + 1.20 m^3 (2.00 x 10^3 kg/m^3) (9.8) = 2750 + 23520 = 26270 Therefore, Crane work = 26270 x 6.95 = 182576.5 J
- Q: For starters im nine and i dont know how to win the claw game ive tried like a million times (exagerating) and i never get it! Can someone be kind and tell me plz! I have seen prizes that i really want and most of them are animals! I am an animal lover and ive seen dolphins or puppy stuffed animals and i never can get them! :( plz help any one if u can i would really appreciate it!
- Wrong spot unless you can print stuffed animals...
- Q: Will Denny Crane lose his first case on an upcoming episode of Boston Legal?
- Denny Crane lose a case? Are you crazy? Denny Crane might lose a few more memory brain cells, but never a case. Then he wouldn't be Denny Crane. Denny Crane!
- Q: How does a person go about becoming a Gantry Crane Operator? And what is it like?
- First you need an opportunity to operate a Gantry Crane, then you will to to get a crane operator license. Finally, you need to find a company who needs a Gantry Crane operator, but if you have located the first step, then you have found someone.
- Q: I need several quotes from Thousand Cranes by Kawabata (Don't remember first name, it starts with a Y) depicting passion.At least two.Best answer goes to whoever provides the most useful quotes, not a randomly compiled list.
- squawk arrrk croak squeee rakkk that pretty much sums it up. the other quotes from the thousand or so cranes are just variations on these
- Q: I need to know exactly how much weight they can lift also how much do they weight?how long is thier life-time?in what temprature they can work?does mosture do any harm to them?for installation , do they need foundation?the exact height and width?
- You need to be more specific. The lifting capacities for container cranes varies significantly, as does any other crane. Some of the variation is based purely on load (horsepower) availability; some is based on speed (rpm) for lift/drop portions of the cycle. Cranes like these operate year-round, at ports all over the world. Some ports have average ambient temperatures in the range of 45 C, with highs up to 60 C. Others can be as low an average as 10 C, with a low peak as much as -50 C. Moisture will, over the long haul, harm them - they're metal constructs, and thus are prone to oxidation. Using corrosion-resistant materials and/or coatings will certainly prolong their usable lifespan. The crane drives (electric motors and power electronics) are also susceptible to moisture and other contaminants. All true dockside cranes require some sort of permanent foundation; it's usually part of the pier construction itself. However, there are portable cranes that operate without one. There is also more than one crane manufacturer out there - all will have their trade secrets that will make each look a little different than the rest. It will generally also reflect in their operation parameters, and in their expected life cycle.
- Q: I have three of these little pests hovering around in my tiny bathroom (my flatmate left the window open). I don't like to get close to them, and when they flutter near me I panic. I need an effective method of getting rid of them, that doesn't require me to get close or touch them - I really need to shower, so any advice is welcomed!Thanks, Ashley.
- a daddy long legs interior the united statesis a sort of spider with an extremely small around physique and intensely long 8 legs. interior the united kingdom, Australia, and Canada crane flies are noted as daddy long legs. So what you ought to have seen could have been a crane fly and it could have been a spider. The crane fly has an elongated physique, six legs, and wings. It sounds like a good sized mosquito.
- Q: Does a crane have a pulley?AND....Is an axe a wedge?THANX CUZ I DONT KNOW WHAT IM DOING, AND OMG IM SO GOING TO FAIL MY TEST BECAUSE IM SO DUMB.
- Yes, a crane has a pulley in order to reduce the workload. Each time there is a loop of the pulley made the workload is reduced.
Send your message to us
Tower Crane 8 Ton Max Capacity TC5613 Used Condition
- Loading Port:
- China main port
- Payment Terms:
- TT or LC
- Min Order Qty:
- 1 unit
- Supply Capability:
- 30 unit/month
OKorder Service Pledge
OKorder Financial Service
Similar products
Hot products
Hot Searches
Related keywords