• TC7135 Crane Machine with CE ISO Certificate System 1
  • TC7135 Crane Machine with CE ISO Certificate System 2
  • TC7135 Crane Machine with CE ISO Certificate System 3
TC7135 Crane Machine with CE ISO Certificate

TC7135 Crane Machine with CE ISO Certificate

Ref Price:
$10,000.00 - 100,000.00 / set get latest price
Loading Port:
China main port
Payment Terms:
TT or LC
Min Order Qty:
1 set
Supply Capability:
1000 set/month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

Structure of TC7135 Crane Machine with CE ISO Certificate

1, TC7135 have competitive price and excellent quality, suitable for all kinds of construction project and can work under all kinds of work condition. With their working radius from 3.5 to 71m, TC7135 tower cranes are famous for their large operating ranges, varied working methods and wide uses.  

2,This series of tower cranes has a horizontal jib frame, a jib-trolley radius-changing mechanism and a hydraulic self-raising mechanism.

3, It is original in design, reliable in operation and satisfactory in shape.

4,Equipped with all necessary safety devices, these cranes show a good speed-control capacity,, satisfactory operating stability and high work efficiency.

5,They are widely applied for the construction of high-rise hotels, resident buildings, high-rise industrial buildings, large-span factory buildings and tower like buildings like tall chimneys. Best after sales service will be offered which will get rid of all your worries in the purchase of our products

Main Features of TC7135 Crane Machine with CE ISO Certificate

1, boom relief Angle is big, greatly widened the equipment capacity and scope of work.

2, suitable for the group of tower cross homework.

3, boom stability is good, combination amplitude range.

4, suitable for height have special requirements occasions construction.

5, lifting capacity big, effectively solve the high steel structure construction team crane big lifting capacity requirements.

Tower Crane Images

TC7135 Crane Machine with CE ISO Certificate

TC7135 Crane Machine with CE ISO Certificate

TC7135 Crane Machine with CE ISO Certificate

TC7135 Crane Machine with CE ISO Certificate

TC7135 Crane Machine with CE ISO Certificate

TC7135 Crane Machine with CE ISO Certificate

TC7135 Crane Machine with CE ISO Certificate

Tower crane Specifiction TC7135 Crane Machine with CE ISO Certificate

TC7135 Crane Machine with CE ISO Certificate

FAQ of TC7135 Crane Machine with CE ISO Certificate

1.How about the shipment?

You can put 2 sets of of wheel loaders in one 40HQ container. The spare parts are packed with boxes.

The delivery time is 20 days.

 

2. What about your service?

We have our factory, we can meet customers needs as soon as possible.

We have first rate professional technology and provide good after-sales service.

 

3.After Sales Service

We offer the Preventative Maintenance and After Sales Service. For we strongly feels about the importance of supporting our customers and the product solutions we provide. Consequently we offer comprehensive maintenance options to prevent equipment issues before they become problems. Also we offer one year guarantee period.  

Q: Ok I got these huge mosquito things in my house and found out they are crane flies. I got up this morning and there are several hanging from my ceiling on a long single strand of silk or web. Is this unusual? Its really weird.
Probably just harvest man or a cellar spider making a web. You might have just mistaken them.
Q: In Scottsdale AZ I have never noticed them before this year. They are on the walls all around our doors.
Crane FLIES not cranes. The winter crane fly has an abundant hatch--well, during early spring or late winter. In this they are just everywhere--this species just does this sort of thing. Typically crane flies are a rather rare sight, such as during the summer months, usually of an entirely different species. There's really not much to explain their abundance.
Q: How do you get a crane down from a tall building once it's completed?
You don't have to worry about that in the deep south! There are no high buildings
Q: Under what circumstances does a tower crane require third party testing?
New installation, demolition, close, major transformation, the use of site work committee, the use of factories to the Technical Supervision Bureau
Q: Romney woulda had that thing fixed by now.
Obama hates cranes!
Q: I ve read about crane flies and many experts say they do not bite nor sting. Ifor that is the case, what is the little piece of their abdomen that looks like a stinger?
Stinger Crane
Q: The really really tall ones you see next to skyscrapers. How do they assemble them? I thought that maybe they use another crane, but then how did they assemble that crane? Some of them are really, really tall. Try to remember what one looks like. They have long hollow necks with a top section where the driver sits that stretches long horizontally.
You okorder /
Q: What are the main parameters of a tower crane?
For car luffing tower cranes, the maximum lifting height is only related to the height of the tower, and when the height of the tower is determined, the maximum height of the ceiling is a certain value.In addition to the 4 major performance parameters. And the working speed (including lifting speed, rotary speed and walking speed of car, traction speed), an important parameter gauge, wheelbase, total power, motor structure weight, balance and gross weight, etc.. These important parameters often determine the tower crane selection, such as speed of operation often determines the number of selected cranes, motor power requirements of power supply load, gauge, wheelbase of the site, and the structure weight, balance weight, weight of the foundation treatment of heavy machine requirement.Tower crane (tower crane) is called tower crane, also known as tower crane. A revolving crane mounted on top of a tall tower. The working space is large, mainly used for the vertical and horizontal transportation of materials and the installation of building components during the building construction. The tower crane consists of three parts: metal structure, working mechanism and electrical system. The metal structure includes the tower, the boom and the base. The working mechanism has four parts, lifting, luffing, turning and walking. The electrical system consists of motors, controllers, power distribution cabinets, connecting lines, signals and lighting devices, etc..
Q: In Batman Begins, what was Dr. Crane/ Scarecrow (Cillian Murphy) after? What did he get in return with working with them and why did he work with them? He doesn't strike me as the kind to work with groups, he seems like a guy who rather work alone.
because they all wanted to f*ck up gotham
Q: What do lattice boom and hydraulic boom in cranes mean?
LATTICE BOOM: See first link. This is where the boom (the portion used to support the load) is made like a lattice ... i.e. interconnected trusses and girders. The cables for lifting the load are run from the base of the boom to the load over pulleys/gears located at the boom's tip. The boom itself is NOT adjustable in length or in angle. HYDRAULIC BOOM: See second link. This crane uses hydraulics to adjust either the length of the boom, or the angle at which the boom joints intersect. It looks more like a single beam construction, although its probably closer to a tube type design (hydraulics may be inside or outside the arm). The load is raised/lowered by cables operating at the end of the boom ... not necessarily tied back to the bottom of the boom.

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

Hot products


Hot Searches

Related keywords