Luffing Crane TCD6029
- Loading Port:
- China Main Port
- Payment Terms:
- TT or L/C
- Min Order Qty:
- 1 Unit unit
- Supply Capability:
- 50 Sets Per Month unit/month
OKorder Service Pledge
OKorder Financial Service
You Might Also Like
Description of TCD6029
1) CMAX TCD6029 tower crane is one of the key product of CNBM company, which have competitive price and excellent quality, suitable for all kinds of construction project and can work under all kinds of work condition.
2) This kind of crane adopts standard section hydraulic lifting and connecting, and can decide the crane height according to the actual height of the building, and at the same time the lifting capacity will not be affected;
3) It has high working speed, good speed-adjusting performance, steady operation and high efficiency. Three-speed motor and mono-speed ratio decelerator are applied in the lifting struction, which enables heavy load low speed and light load high speed.
4) The crane has complete set of safety devices, which can guarantee the safe and high efficienct operation of the equipment. The machine is equipped with lifting height limiter, dolly range-change limiter, moment limiter, weight limiter, circumgyrating limiter, etc.
5)The machine has scientific layout and beautiful appearance. The operator's room is set independently on one side, with good vision field. It creates a good working environment for the operator
Specifications of TCD6029(TCD260)
Jib length: 60m
Maximum load capacity: 16T
Tip load: 2.9T
Base type: stationary
Mast section: 2.0 x 2.0 x 3.0m
Packaging & Delivery of TCD6029
40HQ container
40~45days after deposit
- Q: My grandma has just gotten cancer and I want to send her a paper crane in her get well card. However, is it bad luck to send just one, do you have to send 1,000? I would like to send 1,000 but i don't have the time, experience with origami, or enough room in the envelope, and i only have till tomorrow.
- You can send her a few NICE paper cranes and write her a nice letter, it's the thought that counts.
- Q: I'm confused about one of the final scenes, where Seneca Crane is locked in the room with the nightlock berries. Does this mean that he is supposed to eat the berries and presumably die? Or is it symbolism of some sort of distaste in the way he ended the Games?
- I think he is supposed to eat and die because Prez Snow got pretty angry at Seneca for having two winners for the Hunger Games
- Q: Are there any NECs that let them do so? Maybe Minesweeping Bosn Mate?
- In the latest update to the NEOCS Manual Vol II (NECs) I no longer see an NEC for BM for Crane Operator. Volume II Navy Enlisted Classifications (NECs) NAVPERS 18068F April 2011 NEC Chapter 4 RATING SERIES AND SPECIAL SERIES NECS www lic.navy.mil/bupers-npc/re...
- Q: Like those huge cranes on the top of buildings that are being constructed - how do they get them up there???
- depends on the situation some times they use another crane. some times it is hydralic lifts. they just keep adding sections to the superstructure from the bottom. as they go up they enclose the crane superstructure in side the envelope of the building and add sections of super structure as needed to change the height. then they bolt it back to the building
- Q: In Scottsdale AZ I have never noticed them before this year. They are on the walls all around our doors.
- Crane FLIES not cranes. The winter crane fly has an abundant hatch--well, during early spring or late winter. In this they are just everywhere--this species just does this sort of thing. Typically crane flies are a rather rare sight, such as during the summer months, usually of an entirely different species. There's really not much to explain their abundance.
- Q: Is it through the rails? if so, then how? or is it by another method?
- Hot rails running along side the beams Hot shoes on the crane make contact with the hot rails and slide along the hot rails. Hot rails mounted to the beams by insulating bells. The hot rails can be anywhere in size from trolley wires to rails the size of railroad track rails. AC cranes are usually 3 phase so they will have 3 hot rails. DC cranes will usually have just 2 hot rails. Main disconnect/lock out feeds hot rails. It is usually fused but can also be just a disconnect switch. The same arrangement also is used on the crane's trolley. But in the case of the trolley one set of hot rails feeds the trolley motor. One set of hot rails feeds the main hook {big hook} motor: One set of hot rails feeds the auxiliary hook motor {little hook} motor. If the crane is also used as a Mag crane {Electro magnetic can be used} it will also have a set of hot rails going to the trolley for the magnetic
- Q: I know that there's Tibetan and Fujian but what are all the styles and which is the best one to learn ( in your opinion)
- Goju-ryu is an Okinawan karate that is based on Whooping Crane Gong Fu. It was brought from China to Okinawa by Master Ryu Ryu Ko (Xie Zhonhxiang in Chinese). It was in turn taught to Kanryo Higaonna, who taught Chojun Miyagi, who taught Seikichi Teguchi.
- Q: how do cranes get assembled ? on building sites?
- By people.
- Q: It frustrates me every time I play one of those games i never win. Is there a secret? If so then what is it?
- It depends which type of animal crane you are talking about. If it's the jumbo cranes that pick up the huge stuffed animals, they are actually set to give out a win every so many plays, however the number of the winning play varies based on the location. If you are talking about the average sized cranes, the key is to look for a stuffed animal that is light up on top and bottom heavy. This will allow you to grab ahold of the head or neck and pick the animal up. I've found the easiest cranes to win on are the ones that you pick up beanie baby sized stuffed toys. They seem to win, every time you aim the crane to pick up the head or neck. It's a great way to rack up a lot of stuffed animals. While they may not be huge prizes they are reasonable ones, and some of them are pretty cute.
- Q: im really curious about the 1000 paper crane legend. i went on many different websites to learn about it. one said that you are supposed to have 25 strings to hold the paper cranes (40 each) on it and is that true? also a lot websites said that they used them for weddings so do you have to use them for weddings? or can it be any wish you want? i have a few more questions about it but i will ask whoever seems to know the most about it. thank you:)
- Most people give paper cranes to their love ones who are ill. Since it is a tedious job, they will all help each other in folding it. Shalbi I may be wrong, but I know that to be able to make a wish, you have to fold the cranes yourself. The wish can be anything, but the most common wish is to recover from sickness and have a prosperous life. A crane signifies longevity and fidelity that is why they like to use them on weddings. ^_^
1. Manufacturer Overview
Location | SHANGHAI,CHINA |
Year Established | 2000 |
Annual Output Value | Above US$100 Million |
Main Markets | CHINA |
Company Certifications | ISO 9001:2008; |
2. Manufacturer Certificates
a) Certification Name | |
Range | |
Reference | |
Validity Period |
3. Manufacturer Capability
a) Trade Capacity | |
Nearest Port | Shanghai |
Export Percentage | 0.8 |
No.of Employees in Trade Department | 600 People |
Language Spoken: | English;Chinese; |
b) Factory Information | |
Factory Size: | Above138,000square meters |
No. of Production Lines | Above 2 |
Contract Manufacturing | OEM Service Offered;Design Service Offered |
Product Price Range | Average |
Send your message to us
Luffing Crane TCD6029
- Loading Port:
- China Main Port
- Payment Terms:
- TT or L/C
- Min Order Qty:
- 1 Unit unit
- Supply Capability:
- 50 Sets Per Month unit/month
OKorder Service Pledge
OKorder Financial Service
Similar products
Hot products
Hot Searches
Related keywords