steel scaffolding Popular Galvanized Kwikstage Scaffolding
- Loading Port:
- China Main Port
- Payment Terms:
- TT OR LC
- Min Order Qty:
- -
- Supply Capability:
- -
OKorder Service Pledge
Quality Product, Order Online Tracking, Timely Delivery
OKorder Financial Service
Credit Rating, Credit Services, Credit Purchasing
You Might Also Like
Quick Details
Place of Origin: | Model Number: |
Packaging & Delivery
Packaging Detail: | as per buyer's specifications |
Delivery Detail: | as per requirement |
Specifications
1) Size: Made from pipe of 48mm OD, 4mm or 3.2mm and available in lengths of 1mtr to 3mtr
2)Process of Manufacting: Fabrication
Product Code: CS -1004 Product Name: Intermediate Transom Specification: The Pipe of Hot Rolled Sheet as Per BS-1139 Standard Size: Made from pipe of 48mm OD, 4mm or 3.2mm and available in lengths of 1mtr to 3mtr. Surface Finish: Painted / Hot Dipped Galvanized Process of Manufacting: Fabrication Standard Packing: As Per Customer Requirement Brand Name: “VAISHNAV” |
Vaishnav Engineering Works is located in Jalandhar, India. The city is almost 360 kms north of New Delhi, the Capital city of India. The company provides Scaffolding and Formwork solution for the Construction Industry. |
The Objective of the company is to assist and advice its clients in designing the Scaffolding and Formwork solution for the construction sites and produce products as per the International Standards. |
Vaishnav Engineering Works is dedicated in providing its clients with the most economical, fast and easy to use products for the Scaffolding and Formwork activities. |
Vaishnav Engineering Works was started in 1971 with the manufacturing of Fasteners. It added the manufacturing of Formwork and Scaffolding in 1998. Vaishnav has become a known name in the Middle East Market among all the Traders and the Contractors for the products in Scaffolding and Formwork that we are able to deliver. |
Along with the manufacturing of standard parts, Vaishnav has also developed a technical department to design and produce the Scaffolding and Formwork as per International Standards. |
As a supplier of Scaffolding and Formwork products to major projects in Middle East, Vaishnav has proved its quality and reliability to its clients. The company enjoys serving this sector and works hard to constantly improve and develop its services. |
- Q:If I built a box using standard diameter scaffolding tube (48mm) and connected it using kee clamps rather than standard scaffolding connectors, do you think it would be strong enough to support a 2000lb bar being dropped on it from a 2m height without breaking? I want to build it without welding, but am concerned over the strength of such a box connected only with kee clamps.
- though that page doesn't seem to be quite complete
- Q:Construction of the bowl button steel scaffolding and fastener type scaffolding which cost high
- High price of bowl buckle! Fastener market more, so rent cheap!
- Q:Help.Saturday I want to get a snug piercing but apparently it really hurts I had my scaffolding(industrial) done about 4 months ago it hurt but not that much I was just wanted to know if any one knows if it really hurts I have had alot of piercings but I'm really worried about this one :/Just wanted to know if any1 has any ideas on pain or had both of them ??
- A snug is nothing compared to an industrial, you'll be totally fine. Good luck!
- Q:Hester Prynn stands on a scaffold
- Hey!~ I'm reading that book too! I hate it though. The scaffold scene in Chapter 1 is Hester (and indirectly Pearl)'s public aknowledgement of the sin she committed. That was her way of doing penance and embracing and somehow accepting it. In Ch. 12, Dimmesdale decides to hold an all night vigil there as his way of acknowledging his sin, though not to the community, but to himself. It took him seven years to try and come to terms with his part in the adultery. This scaffold scene is made more signigicant by the fact that the letter A appears via a meteor and the fact that Dimmesdale feels it's directed especially to him. Hope this helps, though I don't know if it fully answers the question. Elaboration is definitely necessary.
- Q:I would like to ask those who know the specification scaffolding? Can you teach me?
- 4, left foot hand eye regulation: a single exclusive console scaffold should be set foot on the wall as a small bar in the eye, the fulcrum, pay attention to not allow foot hand eye parts: adobe walls, soil nailing wall, hollow brick, brick cavity wall, independent column, half brick wall and 180 thick brick the wall brick lintel and a beam into a 60 degree angle of the triangle, windows and doors on both sides of brick and 1 3/4
- Q:hi there, im looking for scaffolding, is there any one knows a well known name for this service. please hurry up.thanks
- Scaffolding or Rigging
- Q:A) what is the velocity of the brick after 4.0 s?B) how far does the brick fall during this time? This is using 9.8 m/s^2 as the acceleration
- v = a*t d = (1/)at^2 Plug in the numbers.
- Q:I bought 100 tons of scaffolding steel pipe, according to the 150 tons of rack pipe to prepare various kinds of fasteners and fastening screws. How to calculate.. Thank you all
- Specification for general practical design expressions"Uniform provisions" according to two kinds of components (bending and axial compression) and two load (no combination of wind load and wind load combination) the general practical design formula of scaffolding structure are given, a total of two groups of 4.
- Q:I want this piercing in my ear called Scaffolding, it looks like this
- That's also called an industrial... not any more painful then another cartilage piercing...but the healing time is usually longer.. expect soreness for 3 months to a year after you get it...
- Q:is this right any answers please
- Well if after 2 weeks you still hadn't been paid, then you should of left and found another job. I did door work for Scottish power years ago - trying to gain new energy customers etc. They didn't pay me or my colleagues at all. Eventually 3 months later I got ?350 out of them - Only after I wrote directly to the Chief executive (Rather handy that they accidentally sent me to his own home to try and sell him gas electricity hehehe). I wrote directly to his home and needless to say he took it upon himself personally to look into plus I also got a personal response.
1. Manufacturer Overview |
|
---|---|
Location | |
Year Established | |
Annual Output Value | |
Main Markets | |
Company Certifications |
2. Manufacturer Certificates |
|
---|---|
a) Certification Name | |
Range | |
Reference | |
Validity Period |
3. Manufacturer Capability |
|
---|---|
a)Trade Capacity | |
Nearest Port | |
Export Percentage | |
No.of Employees in Trade Department | |
Language Spoken: | |
b)Factory Information | |
Factory Size: | |
No. of Production Lines | |
Contract Manufacturing | |
Product Price Range |
Send your message to us
steel scaffolding Popular Galvanized Kwikstage Scaffolding
- Loading Port:
- China Main Port
- Payment Terms:
- TT OR LC
- Min Order Qty:
- -
- Supply Capability:
- -
OKorder Service Pledge
Quality Product, Order Online Tracking, Timely Delivery
OKorder Financial Service
Credit Rating, Credit Services, Credit Purchasing
Similar products
Hot products
Hot Searches
Related keywords