Scalffolding Galvanised Steel Kwisktage
- Loading Port:
- China Main Port
- Payment Terms:
- TT OR LC
- Min Order Qty:
- -
- Supply Capability:
- -
OKorder Service Pledge
OKorder Financial Service
You Might Also Like
Quick Details
Place of Origin: | Brand Name: | Model Number: | |||
Product: | Color: | Certificate: | |||
Lacquer: | Material: | Function: | |||
Load Bearing: |
1. Specification
Slab formwork | Length (m) | Wide (mm) | Height (mm) | Thickness (mm) |
Main-beam | 2.68-4.39 | 65 | 70 | 2 |
2.28-3.68 | 65 | 70 | 2 | |
1.77-2.88 | 65 | 70 | 2 | |
1.17-1.78 | 65 | 70 | 2 | |
Sub-beam | 1.15 | 60 | 50 | 2 |
0.8 | 60 | 50 | 2 | |
0.4 | 60 | 50 | 2 |
Post Supporting System | Length (m) | Diameter (mm) | Thickness (mm) |
Vertical Prop | 2.55 | 48 | 3 |
1.95 | 48 | 3 | |
1.35 | 48 | 3 | |
1.05 | 48 | 3 | |
0.75 | 48 | 3 | |
Horizonal Prop | 1.22 | 48 | 3 |
0.87 | 48 | 3 | |
0.47 | 48 | 3 | |
U-head Screws | 0.4 | 40 | 3 |
0.5 | 40 | 3 | |
0.6 | 40 | 3 | |
0.7 | 40 | 3 |
3.Characteristics…………………………………………………
Telescoping scaffolding system
1)Slab formwork system
1.Make up of adjustable main-beam and different sizes of sub-beam;
2.Different sizes, suitable for any structure buildings b working together;
3.Rigorous quality control;
4.Made of Cold Rolled Steel, lighter and stronger;
5.Using level: 10KGS per m2;
6.No need timbers, reused for about 300 times;
7.Approved by ISO9001, ISO18001 and ISO14001;
8..Specifications designed according to the regular size of the plywood.
2)Post supporting system
1.Easy operation, working under correct direction will be competent for the work;
2.Free size, suitable for any height by connecting different size vertical props together;
3.Make the construction site neat and clear, improve the project quality.
4.Working load:450kg(max);
5.Approved by ISO9001, ISO18001 and ISO14001;
6.The life cycle is 300 times;
7.Quantity of per m2 is 18kg.
- Q:the methods early scientists used to measure sizes and distances within the solar system, explain the technique Eratosthenes used to measure the circumference of the Earth more than 2,000 years ago. how do all these discoveries demonstrate the scaffolding of knowledge? and there are other parts i have already im just stuck on this!!
- Each generation build it's knowledge or the previous one. In simple words your father teaches you. You make it better Then you teach the better method to your son We learned to take cover in caves, then we learned to build huts and then we learned to build houses and then build skyscrapers. Hope this is what you wanted.
- Q:What ever happened to scaffold matches?
- They dont want more people to die :P
- Q:I have to read quot;The Scarlet Letterquot; by Nathaniel Hawthorne for my AP English class and I have to annotate it. One of the things I have to annotate is quot;the structure of the novel, particularly with the scaffold scenes.quot; Firstly, what do they mean by quot;the structure of the novelquot; an secondly, what is a scaffold scene?
- If you do a google search with the words scaffold scene the results are numerous.
- Q:whats it like getting a scaffold piercing?
- Like getting a normal helix piercing but there's two of them. It hurts like someone pinching your ear, the second hurts more than the first because all the blood with have rushed to your ear. The second will probably bleed, putting the earring through witll be uncomfortable.
- Q:61245(base six) divided by 354(base six)
- It okorder I hope that it helps you in something, bye-bye! =).
- Q:Please Help!!I had my scaffolding pierced 3 days ago! And it bled alot during it being pierced so much I passed out! It was all good and then today it like really sore, red and swollen around the bottom hole ! I have used sergical spirit, vasaline and salt water solution on it but like it's very hard ! :(
- If it has been good since getting it pierced, my guess would be that it got snagged on a pillowcase or something. Cartilage piercings of any kind tend to be sore for a while. Make sure you continue to keep it clean, and if it's not improving, it might be worth taking a trip to the piercer and getting his advice on what to do. Red and swollen is difficult to diagnose without seeing exactly what you mean. For future reference, you should try to eat something before getting something pierced or passing out is more likely. Also, some people are just bleeders, but alcohol in the few days before a piercing does thin out the blood and makes the bleeding more severe.
- Q:A window washer is standing on a scaffold supported by a vertical rope at each end. The scaffold weighs 200 N and is 3.00 m long. What is the tension in each rope when the 700 N worker stands 1.00 m from one end?Please help me.
- Draw the picture ie Free Body Diagram ALWAYS!! Sum Fx = 0 Sum Fy = 0 Sum Moments = 0 Take moments about one end. I choose the left end and put the window washer 1 m from the left end.====> Tension in left rope goes through the left end ==> lever arm has length=0 ===> moment from left rope = 0 Moment from window washer: 1 m * 700 N = 700 N-m clockwise Moment from weight of scaffold: 1.5 m * 200 N = 300 N-m clockwise (Center of gravity in center of scaffold) Your question says 190 N your question statement says 200 N. NOTE I solved for 200 N Total clockwise moment 700 + 300 = 1000 N-m CW Right rope must supply that Lever arm = 3 m * 1000 N-m = 3m * T T = 333.33 N UP Total force down = 200 + 700 = 900 N ===> Tension in left rope: 900 - 333.33 = 566.67 N
- Q:I'm thinking of getting the Industrial on my left ear and the Scaffold on my right ear...so separately for just one at a time, how much would it be?
- Depends where you're getting it done. Some places it could be like $30 - $60 and at other places it could be $60 - $100. Call some shops and ask them. Where I live, at one piercing shop they do piercings for $50 and at another one they do them for like $80
- Q:I got a scaffold piercing done on saturday. It's now thursday and it basically hasn't stopped bleeding since..for the first day it was just a bit crusty with dried blood but after that it has been trickling constantly and at night it really goes to town! I end up waking up at like 3 every morning having to clean it up because it's dribbled down my face and completely drowned my ear..during the day the blood is quite thin but constant and at night its really thick and grossI'm pretty sure I haven't been knocking it...I did used to snag it quite a bit before so I thought that was why but i've been really careful recently and nothings changedThe piercing itself looks epic so I don't want to have to take it out...especially since i paid ?35 quid for it. Any suggestions on how to stop the bleeding?..or what's the dealeo with it in general?I got it done at Asgard by the way..good reliable place
- Did you attempt peroxide? placed some on a cotton ball and sparkling around the piercing. If this does not flow away interior of two days and the bleeding persists your physique could be rejecting the steel out of your epidermis. this could reason the peircing to ultimately migrate out. flow returned to the piercer and notice what they say.
- Q:Right, today i got a scaffolding piercing, but because my ear was a funny shape they had to bend it so it was an awkward angle in my ear. My main question is is there anywhere where i can buy pre-bent bars or will I have to bend the bars my self when I buy them? Thanks.
- Since everyone's anatomy is different, you'll have to get your barbells custom-bent. I don't advise doing this yourself; You should take your barbells to your piercer and have them do it.
1. Manufacturer Overview |
|
---|---|
Location | |
Year Established | |
Annual Output Value | |
Main Markets | |
Company Certifications |
2. Manufacturer Certificates |
|
---|---|
a) Certification Name | |
Range | |
Reference | |
Validity Period |
3. Manufacturer Capability |
|
---|---|
a)Trade Capacity | |
Nearest Port | |
Export Percentage | |
No.of Employees in Trade Department | |
Language Spoken: | |
b)Factory Information | |
Factory Size: | |
No. of Production Lines | |
Contract Manufacturing | |
Product Price Range |
Send your message to us
Scalffolding Galvanised Steel Kwisktage
- Loading Port:
- China Main Port
- Payment Terms:
- TT OR LC
- Min Order Qty:
- -
- Supply Capability:
- -
OKorder Service Pledge
OKorder Financial Service
Similar products
Hot products
Hot Searches
Related keywords